Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2026 09 Public Works Monthly Report
CITY OF HUMBLE PUBLIC WORKS DEPARTMENT MONTHLY REPORT SEPTEMBER 2026 MARK K. ARNOLD DIRECTOR OF PUBLIC WORKS CITY OF HUMBLE SEPTEMBER 2026 MONTHLY GASOLINE REPORT CITY OF HUMBLE MONTHLY GASOLINE REPORT September-26 DEPARTMENT UNLEADED DIESEL TOTAL UNLEADED I ESEL ADMINISTRATION 0 0 0 0.00% 0.00% STREET 711.6 418.9 1130.5 6.25% 27.54% FIRE / EMS 459.4 1020.4 1479.8 4.04% 67.09% POLICE 6485.9 0 6485.9 56.98% 0.00% TRAFFIC CONTROL 641.1 0 641.1 I 5.63% 0.00% I PARK 579.5 53.9 633.4 5.09% 3.54% ANIMAL CONTROL 90 0 90 0.79% 0.00% INSPECTIONS 348.7 0 348.7 3.06% 0.00% VEH MAINT 48 0 48 0.42% 0.00% FIRE MARSHAL 598.4 23 621.4 5.26% 1.51% BLD MAINT 189.4 0 189.4 1.66% 0.00% WATER 532.4 4.8 537.2 4.68% 0.32% SEWER 370.9 0 370.9 3.26% 0.00% SENIOR ACTIVITY 148 0 148 1.30% 0.00% CIVIC CENTER 179.6 0 1 179.6 1.58% 1 0.00% TOTAL 11382.9 1521 12903.9 100.00% 100.00% PUBLIC WORKS DEPARTMENT SEPTEMBER 2026 OVERTIME / COMPTIME MONTHLY REPORT Monthly Overtime / Comptime Report City of Humble Public Works Department Water & Wastewater Treatment Employee On -Call Time Total O.T. Total Comp Jason Campbell 36 28 0 Kyle Elliott 0 0 0 Steve Filmore 15 13.5 0 Tommy Hosler 0 0 0 Louis Johnson 0 0 0 Matt Watters 15 12.5 0 Total: 66 54 0 Water & Wastewater Distribution Employee On -Call Time Total O.T. Total Comp Zach Bullard 15 11.5 0 Angel Cuellar 0 6.5 0 Ray Flores 0 1 0 Kevin Gunn 15 18.5 0 Gordon Meadows 0 0 0 Colby Parker 13.5 11.5 0 Mike Richard 0 24.5 0 Brandon Wehunt 22.5 20.5 0 Total: 66 94 0 Street Department Employee On -Call Time Total O.T. Total Comp Vincent Allen 0 6 0 Chase Anderson 0 0 0 Isaias Cardona 0 0 3 Hunter Forbes 0 0 0 Shane Gunn 13.5 20 0 Jack Lemoine 0 0 0 Armando Salazar 30 26 0 Jarred Thomas 0 0 0 Joel Villa 0 0 0 David Wehunt 22.5 3 0 Total: 66 1 55 3 Employee On -Call Time Total O.T. Total Comp Frank Alexander 0 0 0 Ryan Killion 0 0 0 Bill Neeley 0 0 0 Total: 0 0 0 BuiidinNiaintenance, Employee On -Call Time Total O.T. Total Comp Fred Hawkins 0 10.5 0 George McCaa 0 5 5 Brett Nielsen 0 0 0 Alex Guerra 0 23.5 0 Total: 0 39 5 PUBLIC WORKS DEPARTMENT SEPTEMBER 2026 MONTHLY PROJECT REPORTS TABLE OF CONTENTS Project Summary page 2 Special Projects Northshire LS upgrades and New Force Main & Gravity Line page 3 City of Houston Inter -Connect #2 page 4 South Houston Ave Road Widening & Reconstruction Project page 5 Sanitary Sewer Rehabilitation Phase 6 Project page 6 Meeks and Manning Road Paving and Drainage Improvement Project page 7 McDugald, Sharon Dr., and Carolyn Ct. Road Reconstruction Project page 8 16" Water line from Well 6 to Well 9 page 9 North Houston and Charles St Water line Improvements page 10 Project Summary Project Engineer Contractor Cost Dates Northshire LS upgrades, $ 10,473,257.40 Con. New Force Main & RPS Klotz & V&S $ 1,040,830.00 Eng. Construction 85% complete $ 11,514,087.40 Gravity Line s Associates Construction City of Houston ARKK ISJ Underground $ 273,550.00 Eng. o Construction 90 /o complete Utilities, LLC $ 2,353,060.00 Const. Inter -Connect #2 Engineers $ 2,626,610.00 South Houston Ave Road ARKK $ 1,132,360.00 Widening & Engineers Design & Construction Engineering 95% complete Reconstruction Project Services Cost Sanitary Sewer ARKK King Solution $ 176,250.00 Eng. Construction 99% complete Rehabilitation Phase 6 Engineers Services, LLC $ 1,069,785.00 Const. Project Reviewing post -construction videos $ 1,246,035.00 Meeks and Manning Road ARKK $ 241,750.00 Paving and Drainage Engineers Design & Construction Engineering 85% complete Improvement Project Services Cost McDugald, Sharon Dr., ARKK $ 369,500.00 Eng. and Carolyn Ct. Road Engineers Ballast Point $ 2,904,918.00 Const Construction 95% complete $ 3,274,418.00 Reconstruction Project Working on additional work authorized in Change Order #1 16" Water line from ARKK ISJ Underground $ 178,000.00 0 Construction 50 /o complete Well to Well Engineers Utilities, LLC Design & Construction Services Cost North Houston and ARKK $ 190,250.00 Eng. Design 75% complete Charles St. water line Engineers Improvement Under Construction $ 18,839,150.40 Under Design $ 1,564,360.00 Total $ 20,403,510.40 Northshire LS Upgrade, New Force Main, New Gravity Sewer Line Proiect Description - This project includes Wastewater System Improvements for providing sewer service for anticipated growth in the northwest area of Humble around West Townsen. It includes the upgrades to the Northshire Lift Station including electrical work and new piping and valves, construction of approximately 10,000 linear feet of 16" force main, 5,600 linear feet of 24" gravity sewer line, and replacement of 2,300 linear feet of 27" gravity sanitary sewer line. The improvements also include replacing the siphon that crosses Garner's Bayou into the Wastewater Plant Engineers — RPS — Klotz Associate, Inc. Contractor — V&S Construction Status — Sewer line is complete and crews are now working inside the lift station. City of Houston Inter -Connect #2 Project Description - This project provides a 2nd connection to the City of Houston Water System to obtain surface water from the City of Houston as part of the ground water reduction plan. This will bring surface water from the City of Houston along Rankin Road into the Well # 6 water plant site. This project consists of approximately 3700 linear feet of 20" water line. The project also included the installation of the 20" water line under US 59 and the Union Pacific Rail Road. Engineers.— ARKK Engineers Contractor — ISJ Underground Utilities, LLC Status — Project 90% complete. South Houston Road Widening & Reconstruction Protect Project Description - Project involves improvements to widen the existing 2-lane asphalt roadway to a 3-lane concrete curb and gutter roadway. Drainage improvements include installation of underground storm sewers, inlets and ditch regrading. It also includes a new traffic signal system. Engineers — ARKK Engineers Contractor — Status — Engineering 95% complete Coordinating with Centerpoint and private utilities for relocation of utilities. Sanitary Sewer Rehabilitation Phase 6 Proiect Project Description - Project involves replacement and rehabilitation of several deteriorated sanitary sewer line segments throughout the City. Engineers.— ARKK Engineers Contractor — King Solution Services, LLC Status — Engineers are reviewing post -construction videos. Meeks and Manning Road Paving and Drainage Improvement Proiect Project Description - Project involves milling and overlaying the existing asphalt streets and regrading and installing roadside drainage culverts, new water line and fire hydrants along Meeks Road. Engineers.— ARKK Engineers Contractor — Status — Engineering 85% complete McDup_ald, Sharon Dr., and Carolyn Ct. Road Reconstruction Proiect Proiect Description - Project consists of replacing the existing asphalt streets with concrete curb and gutter streets, and will include replacing the water line and fire hydrants along McDugald. Engineers.— ARKK Engineers Contractor — Ballast Point Status For the month of September Ballast Point Construction has completed the replacement of damaged brick mailboxes. Striping and signs have been installed. We did a walk through and started a preliminary punch list. We also presented Ballast Point with the change order for the point repairs on Isaacks Rd. and the replacement of the Sharon dip drain box. For the Rankin and Kingfisher intersection improvements have been completed the remainder of the pavement to Well #6 will be completed after the relocation of existing utility poles. L I 0 G 16 inch Water line from Well 6 to Well 9 Project Description - Project will provide a 16" surface water line to connect Well 6 (Rankin Rd) to the ground storage tank and booster pumps at Well 9 (Carpenter Rd). This will allow the surface water to be provided from 3 of the City's well sites. Eny,incers — ARKK Engineers Contractor — Status — Project 50% complete North Houston and Charles St. Water line Improvements Project Description - Project will replace approximately 3,000' of existing water line along N Houston Ave between Meek Road and E Townsen Blvd and approximately 1,200' of new water line along Charles Street between 7`h Street and FM 1960 Bypass. The proposed improvements will help improve water quality and flow throughout the City's existing water distribution infrastructure. Engineers.— ARKK Engineers Contractor — Status — Design is 75% complete WATER DEPARTMENT SEPTEMBER 2026 MONTHLY REPORT City of Humble Water Pumpage Report 2026 4201 Month Total Monthly Pumpage Total Well Pumpage Total City of Houston Peak Daily Pumpage Low Daily Pumpage Average Daily Pumpage Total Monthly Connections January 87,510 35,750 51,760 3,488 2,347 2,823 4,216 February 76,169 31,975 44,194 2,997 2,419 2,720 4,211 March 94,507 43,516 50,991 6,172 2,276 3,049 4,218 April 84,568 28,985 55,583 3,317 2,368 2,819 4,212 May 92,859 41,663 51,196 4,137 2,537 2,995 4,233 June 95,253 43,798 51,455 3,972 2,482 3,175 4,260 July 117,437 44,349 73,088 4,491 2,760 3,788 4,264 August 131,332 47,160 84,172 5,151 3,689 4,237 4,271 September 110,159 40,845 69,314 4,295 1,150 3,672 4,286 October November December 4,201 Total 889,794 358,041 531,753 38,020 22,028 29,278 85 Maximum 131,332 47,160 84,172 6,172 3,689 4,237 Minimum 76,169 28,985 44,194 2,997 1,150 2,720 Average 98,866 39,782 59,084 4,224 2,448 3,253 Difference Between Water Billed and Water Pumped Total METERED DIFF VS PUMP Percent Loss Percent Metered 75,658 11,852 13,54% 86.46% 47,385 28,784 37.79% 62.21% 78,636 15,871 16.79% 83.21% 77,187 7,381 8.73% 91.27% 71,239 21,620 23.28% 76.72% 80,582 14,671 15.40% 84.60% 96,318 21,119 17.98% 82.02% 107,856 23,476 17.88% 82.12% TCEQ MONTHLY REPORT SEND REPORT TO: Water Works Operation for Ground Water Supplies (1) Name of System: CITY OF HUMBLE County (1a) System I.D. No TOTAL AVG. MAX. MIN. 1010014 TCEQ P.O. BOX 13087 Austin, Tx. 78711-3087 HARRIS Month of: September-26 PUMPAGE TO DISTRIBUTION SYSTEM IN THOUSAND GALS. (6) PURCHASED (7) SOLD (2) DIRECT (3) FROM GND. (4) TOTAL (5) DISINFECTION FROM C/O TO C/O FROM WELLS STORAGE PUMPAGE C12 Lbs. NH3N Gal. HOUSTON HOUSTON 384 471 3755 27 6.4 2900 528 381 527 3403 26 6.9 2495 527 386 608 4214 37 8.8 3220 452 469 841 3902 43 10.5 2592 525 623 527 1150 39 9.4 0 488 416 350 1284 27 6 518 322 577 283 3640 27 6.7 2780 404 491 634 3510 36 8.2 2385 551 541 586 3908 40 8 2781 608 402 650 3777 40 8.7 2725 642 574 391 4076 44 9.2 3111 633 535 1032 4025 56 12 2458 628 575 665 3742 44 10.1 2502 631 501 288 3879 31 6 3090 601 556 807 4089 50 12.1 2726 80 684 731 3450 50 10.4 2035 138 901 1231 2376 70 17.9 244 545 926 959 3695 75 17.9 1810 558 848 1041 3777 70 14.3 1888 498 989 1440 4140 86 18.7 1711 508 911 1122 4284 72 14.9 2251 514 818 773 3691 65 13 2100 576 688 1077 4095 66 13.3 2330 512 532 857 4149 51 10.7 2760 317 703 841 4242 59 12.4 2698 972 510 833 4022 51 10.7 2679 395 516 563 3870 36 8.3 2791 588 540 593 3831 39 9.3 2698 576 259 512 4295 30 6.5 3524 574 1218 11581 3888 86 18.4 1512 164 18454 22391 110159 1473 325.7 69314 15055 615 746 3672 49 11 2310 502 1218 1440 4295 86 18.7 3524 972 259 283 1150 26 6 0 80 (10) No. of active water services: 4286 (11) Chemical analysis: September-26 (12) Dates and results of distribution bacteriological analyses: 15 Samples, 15 Good Samples. (13) Dates and results of raw unchlorinated well water samples. (14) Reservoirs or tanks cleaned: None (15) Dead ends flush: 09/09/26 (16) Over -flow Site / Amount: E.S.T # 1-90,000 Gallons / E.S.T # 2-150,000 Gallons / E.S.T # 3 - 190,0000 Gallons / E.S.T 4 6-190,000 Gallons (17) Submitted by / Cert.#: THOMAS E. HOSLER WG0016273 (18) Total Monthly Combined Over -flows 620,000 WASTEWATER DEPARTMENT SEPTEMBER 2026 MONTHLY REPORT City of Humble Wastewater Pumpage Report 2026 Month Total Monthly Treated Peak Daily Treated Low Daily Treated Average Daily Treated January 63,743 3,040 1,665 2,056 February 57,820 3,108 1,780 2,065 March 67,938 4,154 1,758 2,191 April 73,122 4,677 1,871 2,437 May 79,244 6,707 1,917 2,556 June 81,090 6,551 2,054 2,703 July 70,777 3,100 1,828 2,283 August 62,989 2,346 1,902 2,099 September October November December Total 556,723 33,683 14,775 18,390 Maximum 81,090 6,707 2,054 2,703 Minimum 57,820 2,346 1,665 2,056 Average 69,590 4,210 1.847 2,299 Difference Between Water Pumped vs. Wastewater Treated Total Water Pumped Wastewater Treated Pumped vs. Treated Percent Treated 87,510 63,743 23,767 72.84% 76,169 57,820 18,349 75.91% 94,507 67,938 26,569 71.89% 84,568 73,122 11,446 86.47% 92,859 79,244 13,615 85.34% 95,253 81,090 14,163 85.13% 117,437 70,777 46,660 60.27% 110,159 62,989 47,170 57.18% 758,462 556,723 201,739 73,40% EPA - TX0034401 City Of Humble TCEQ - 0010763-002 Southwest Wastewater Treatment Facility Month: September 2026 Date Temp. Rain Flow Meter Total Flow Effluent Sample Flow Non Potable Water Beltpress Water Bleach LROPM 14,728,064 CBOD T.S.S. NH3N Ecoli pH DO Temp. 87.3 14,730,150 2,086,000 2.69 168,196 33,206 0.2 -1-Sep 89 14,732,238 2,088,000 7 30.9 2.21 165,735 39,345 0 -2-Sep 89.7 14,734,391 2,153,000 7.45 6.93 30.1 2.26 159,066 30,329 0.3 -3-Sep 87 1 14,736,584 2,193,000 1.96 163,490 0 1 -4-Sep 5-Sep 86.2 14,738,832 2,248,000 1 1 1.62 151,506 1,197 0 85.8 14,740,981 2,149,000 1 1 2.16 128,851 0 5.2 -6-Sep 85.8 0.44 14,742,883 1,902,000 1.83 120,994 0 0 -7-Sep 86.8 14,744,813 1,930,000 2.04 118,115 414 2.6 -8-Sep 9-Sep 86.9 14,746,993 2,180,000 7.13 31.4 2.39 167,569 43,965 2.6 10-Sep 86.4 14,749,033 2,040,000 7.45 7.15 31.2 2.19 142,744 35,197 0 11 -Sep 84.8 0.15 14,751,248 2,215,000 32.09 88,288 1,336 0 12-Sep 87.3 14,753,594 2,346,000 1 1.84 139,348 0 0 13-Sep 85.8 14.755,765 2,171,000 1.66 133,202 0 5.3 86.6 14,757,766 2,001,000 2.29 132,747 10,590 0 -14-Sep 5-Sep 86.2 0.02 14,759,873 2,107,000 1 1.25 152,057 21,515 0 -1 6-Sep 85.9 14,761,921 2,048,000 7.13 131.3 1.81 154,819 26,097 5 -1 7-Sep 87.7 14,764,036 2,115,000 7.54 7.07 31.4 2.57 121,114 5,397 4.8 -1 8-Sep 85.2 14,766,156 2,120,000 1 2.22 141,635 26,656 1.8 -1 19-Sep 83.2 14.768,313 2,157,000 1 1.72 114,650 0 0 20-Sep 83.2 14,770,290 1,977,000 1.8 110,850 0 0 21 -Sep 85.9 14,772,258 1,968,000 1.81 116,497 4,978 0 22-Sep 85.4 14,774,393 2,135,000 1.99 145,525 30,974 0 86.5 14,776,449 2,056,000 6.68 31.3 2.24 145,478 25,475 4.5 -23-Sep 24-Sep 86.7 14,778,543 2,094,000 7.37 6.57 31.2 2.51 112,799 3,442 2 82.3 14,780,657 2,114,000 1 1 2.46 141,702 27,058 1.3 -25-Sep 81.2 14,782,741 21084,000 1 2.34 107,973 0 0.4 -26-Sep 27-Sep 83.2 1 14,784,825 2,084,000 2.07 105,451 44 0.2 28-Sep 85.3 14,786,769 1,944,000 2.27 121,650 5,106 1.1 29-Sep 83.1 14,788,852 2,083,000 1.75 140,795 24,856 0.8 30-Sep 85.9 14.791,053 1 2201 000 6.68,3061 245 146.942 33 672 1 Total 2572.3 0.61 62,989,000 29.81 62.34 279.4 92.49 4,059,788 430,849 40.1 Avg 86 0 21099,633 7.45 6.93 31 3 135,326 14,362 1.34 Min. 1 81.2 0.02 1,902,000 17.37 6.57 30.11 1.25 88,288 0 0 Max. 1 89.7 0.44 1 2,346,000 1 17.54 7.15 31.41 32.09 168,196 1 43,965 5.3 STREET DEPARTMENT SEPTEMBER 2026 MONTHLY REPORT Street Department Date Employee Name Location Task 9/1/2026 Wehunt David Wilson Rd 0-1205 Misc storm sewer request 9/1/2026 Wehunt David S Bender Ave 100-299 Remove dead tree / limb 9/1/2026 Anderson Chase S Bender Ave 100-299 Remove dead tree / limb 9/1/2026 Salazar Armando S Bender Ave 100-299 Remove dead tree / limb 9/1/2026 Villa Joel S Bender Ave 100-299 Remove dead tree / limb 9/1/2026 Forbes Hunter S Bender Ave 100-299 Remove dead tree / limb 9/2/2026 Wehunt David Granberry St 100-199 Move items 9/2/2026 Anderson Chase Granberry St 100-199 Move items 9/2/2026 Forbes Hunter Granberry St 100-199 Move items 9/2/2026 Gunn Shane Fieldtree Dr 20600-20649 Replace damaged / faded sign 9/2/2026 Salazar Armando Fieldtree Dr 20600-20649 Replace damaged / faded sign 9/2/2026 Salazar Armando Elmbend Dr 10100-10199 Replace damaged / faded sign 9/2/2026 Gunn Shane Elmbend Dr 10100-10199 Replace damaged / faded sign 9/2/2026 Salazar Armando Salzburg Ln 20200-20299 Replace damaged / faded sign 9/2/2026 Gunn Shane Salzburg Ln 20200-20299 Replace damaged / faded sign 9/2/2026 Gunn Shane Southwick Dr 9832-9837 Replace damaged / faded sign 9/2/2026 Salazar Armando Southwick Dr 9832-9837 Replace damaged / faded sign 9/2/2026 Gunn Shane Southwick Dr 9800-9829 Replace damaged / faded sign 9/2/2026 Salazar Armando Southwick Dr 9800-9829 Replace damaged / faded sign 9/2/2026 Gunn Shane Haverhill Dr 9800-9899 Replace damaged / faded sign 9/2/2026 Salazar Armando Haverhill Dr 9800-9899 Replace damaged / faded sign 9/3/2026 Forbes Hunter Granberry St 100-199 Move items 9/3/2026 Wehunt David Granberry St 100-199 Move items 9/3/2026 Anderson Chase Granberry St 100-199 Move items 9/3/2026 Forbes Hunter Granberry St 100-199 Move items 9/3/2026 Wehunt David Granberry St 100-199 Move items 9/3/2026 Anderson Chase Granberry St 100-199 Move items 9/4/2026 Wehunt David Granberry St 100-199 Move items 9/4/2026 Forbes Hunter Granberry St 100-199 Move items 9/4/2026 Salazar Armando Wilson Rd 0-1205 Dead animal pickup 9/4/2026 ISAIS CARDONA Wilson Rd 0-1205 Dead animal pickup 9/4/2026 Allen Vince 10023 CANTERTROT DR Dead animal pickup 9/4/2026 Isaias Cardona 10023 CANTERTROT DR Dead animal pickup 9/8/2026 Salazar Armando Pecan Ln 1822-1899 Replace concrete / asphalt paving due to utility repair 9/8/2026 Wehunt David Pecan Ln 1822-1899 Replace concrete / asphalt paving due to utility repair 9/8/2026 Gunn Shane Pecan Ln 1822-1899 Replace concrete / asphalt paving due to utility repair 9/9/2026 Wehunt David Peach Run Dr 1822-1899 Replace concrete / asphalt paving due to utility repair 9/9/2026 Gunn Shane Peach Run Dr 1822-1899 Replace concrete / asphalt paving due to utility repair 9/9/2026 Salazar Armando Peach Run Dr 1822-1899 Replace concrete / asphalt paving due to utility repair 9/10/2026 Villa Joel 607 WELCH ST Customer tree / limb request 2204 9/10/2026 Salazar Armando 607 WELCH ST Customer tree / limb request 2204 9/11/2026 Salazar Armando N Houston Ave 2000-2099 Remove / cover graffiti 9/11/2026 Gunn Shane N Houston Ave 2000-2099 Remove / cover graffiti 9/11/2026 9/11/2026 9/11/2026 9/11/2026 9/11/2026 9/11/2026 9/11/2026 9/11/2026 9/11/2026 9/11/2026 9/11/2026 9/11/2026 9/11/2026 9/11/2026 9/11/2026 9/11/2026 9/11/2026 9/14/2026 9/14/2026 9/14/2026 9/14/2026 9/14/2026 9/14/2026 9/14/2026 9/14/2026 9/14/2026 9/14/2026 9/14/2026 9/15/2026 9/15/2026 9/15/2026 9/15/2026 9/15/2026 9/15/2026 9/15/2026 9/15/2026 9/15/2026 9/15/2026 9/15/2026 9/15/2026 9/16/2026 9/16/2026 9/16/2026 9/16/2026 Allen Vince Anderson Chase Villa Joel Gunn Shane Salazar Armando Isaias Cardona Forbes Hunter Allen Vince Isaias Cardona Forbes Hunter Allen Vince Anderson Chase Villa Joel Gunn Shane Salazar Armando Isaias Cardona Forbes Hunter Allen Vince Anderson Chase Villa Joel Wehunt David Salazar Armando Isaias Cardona Forbes Hunter Isaias Cardona Allen Vince ISAIS CARDONA Wehunt David Forbes Hunter Salazar Armando Forbes Hunter Salazar Armando Forbes Hunter Salazar Armando Salazar Armando Forbes Hunter Salazar Armando Forbes Hunter Forbes Hunter Salazar Armando Isaias Cardona Anderson Chase Villa Joel Forbes Hunter City Wide City Wide City Wide City Wide City Wide City Wide City Wide 210EMAIN ST 210EMAIN ST 210EMAIN ST 310 MAIN ST 310 MAIN ST 310 MAIN ST 310 MAIN ST 310 MAIN ST 310 MAIN ST 310 MAIN ST City Wide City Wide City Wide City Wide City Wide City Wide City Wide 2025 N HOUSTON AVE 2025 N HOUSTON AVE N Houston Ave 2000-2099 N Houston Ave 2000-2099 Meek Rd 918-1031 Meek Rd 918-1031 Townsen Blvd E 20100-20139 Townsen Blvd E 20100-20139 Meek Rd 1112-1139 Meek Rd 1112-1139 N Houston Ave 1600-1699 N Houston Ave 1600-1699 N Houston Ave 100-199 N Houston Ave 100-199 S Houston Ave 900-1099 S Houston Ave 900-1099 Southwick Dr 9800-9829 Southwick Dr 9800-9829 Southwick Dr 9800-9829 Canterbury Dr 9800-9899 Mow / weedeat ROW Mow / weedeat ROW Mow / weedeat ROW Mow / weedeat ROW Mow / weedeat ROW Mow / weedeat ROW Mow / weedeat ROW Flags Flags Flags Place barricade for event Place barricade for event Place barricade for event Place barricade for event Place barricade for event Place barricade for event Place barricade for event Mow / weedeat ROW Mow / weedeat ROW Mow / weedeat ROW Mow / weedeat ROW Mow / weedeat ROW Mow / weedeat ROW Mow / weedeat ROW Remove / cover graffiti Remove / cover graffiti Move items Move items Replace damaged / faded sign Replace damaged / faded sign Remove / cover graffiti Remove / cover graffiti Replace damaged / faded sign Replace damaged / faded sign Replace damaged / faded sign Replace damaged / faded sign Replace damaged / faded sign Replace damaged / faded sign Replace sign / post hardware Replace sign / post hardware Sinkhole backfill Sinkhole backfill Sinkhole backfill Replace concrete paving 9/16/2026 Wehunt David Canterbury Dr 9800-9899 Replace concrete paving 9/16/2026 Salazar Armando Canterbury Dr 9800-9899 Replace concrete paving 9/16/2026 Allen Vince 2874 PHEASANT RUN Customer tree / limb request 2225 9/16/2026 Anderson Chase 212 S AVENUE H Desilt storm sewer channels / ditches 9/16/2026 Salazar Armando 212 S AVENUE H Desilt storm sewer channels / ditches 9/16/2026 Isaias Cardona 212 S AVENUE H Desilt storm sewer channels / ditches 9/16/2026 Forbes Hunter 212 S AVENUE H Desilt storm sewer channels / ditches 9/16/2026 Villa Joel 212 S AVENUE H Desilt storm sewer channels / ditches 9/17/2026 Salazar Armando Canterbury Dr 9800-9899 Replace concrete paving 9/17/2026 Wehunt David Canterbury Dr 9800-9899 Replace concrete paving 9/17/2026 ISAIS CARDONA Canterbury Dr 9800-9899 Replace concrete paving 9/17/2026 Villa Joel Canterbury Dr 9800-9899 Replace concrete paving 9/17/2026 Forbes Hunter Canterbury Dr 9800-9899 Replace concrete paving 9/17/2026 Anderson Chase Canterbury Dr 9800-9899 Replace concrete paving 9/18/2026 ISAIS CARDONA Granberry St 100-199 Move items 9/18/2026 Wehunt David Granberry St 100-199 Move items 9/18/2026 ISAIS CARDONA Granberry St 100-199 Move items 9/18/2026 Wehunt David Granberry St 100-199 Move items 9/18/2026 Salazar Armando Mcdugald Rd 1000-1099 Replace sign / post hardware 9/21/2026 Salazar Armando Rough Neck Dr 1801-1824 Sinkhole 9/21/2026 ISAIS CARDONA Rough Neck Dr 1801-1824 Sinkhole 9/21/2026 Forbes Hunter Rough Neck Dr 1801-1824 Sinkhole 9/21/2026 Anderson Chase Rough Neck Dr 1801-1824 Sinkhole 9/21/2026 Gunn Shane Rough Neck Dr 1801-1824 Sinkhole 9/22/2026 Gunn Shane Rotary Dr 1900-1999 Sinkhole 9/22/2026 Isaias Cardona Rotary Dr 1900-1999 Sinkhole 9/22/2026 Wehunt David Rotary Dr 1900-1999 Sinkhole 9/22/2026 Anderson Chase Rotary Dr 1900-1999 Sinkhole 9/22/2026 Forbes Hunter Rotary Dr 1900-1999 Sinkhole 9/22/2026 Salazar Armando Rotary Dr 1900-1999 Sinkhole 9/22/2026 Wehunt David Rough Neck Dr 1801-1824 Sinkhole backfill 1596 9/22/2026 Anderson Chase Rough Neck Dr 1801-1824 Sinkhole backfill 1596 9/22/2026 Forbes Hunter Rough Neck Dr 1801-1824 Sinkhole backfill 1596 9/22/2026 Isaias Cardona Rough Neck Dr 1801-1824 Sinkhole backfill 1596 9/22/2026 Salazar Armando Rough Neck Dr 1801-1824 Sinkhole backfill 1596 9/22/2026 Gunn Shane Rough Neck Dr 1801-1824 Sinkhole backfill 1596 9/22/2026 Villa Joel Rough Neck Dr 1801-1824 Sinkhole backfill 1596 9/23/2026 Allen Vince 7821 RANKIN RD Dead animal pickup 9/23/2026 Villa Joel Rotary Dr 1900-1999 Replace concrete / asphalt driveway due to utility repair 9/23/2026 Salazar Armando Rotary Dr 1900-1999 Replace concrete / asphalt driveway due to utility repair 9/23/2026 Isaias Cardona Rotary Dr 1900-1999 Replace concrete / asphalt driveway due to utility repair 9/23/2026 Forbes Hunter Rotary Dr 1900-1999 Replace concrete / asphalt driveway due to utility repair 9/23/2026 Wehunt David Rotary Dr 1900-1999 Replace concrete / asphalt driveway due to utility repair 9/23/2026 Gunn Shane Rotary Dr 1900-1999 Replace concrete / asphalt driveway due to utility repair 9/24/2026 Villa Joel Windswept Dr 1200-1299 Patch pothole 9/24/2026 Forbes Hunter Windswept Dr 1200-1299 Patch pothole 9/24/2026 Salazar Armando Windswept Dr 1200-1299 Patch pothole 9/24/2026 Wehunt David Pecan Ln 1822-1899 Move items 9/24/2026 Gunn Shane Pecan Ln 1822-1899 Move items 9/24/2026 ISAIS CARDONA Pecan Ln 1822-1899 Move items 9/24/2026 Anderson Chase Pecan Ln 1822-1899 Move items 9/25/2026 Salazar Armando Fieldtree Dr 20500-20519 Trim tree / limbs obstructing sight / sign 9/25/2026 Villa Joel Fieldtree Dr 20500-20519 Trim tree / limbs obstructing sight / sign 9/25/2026 Salazar Armando Cantertrot Dr 10100-10225 Remove tree/ limbs from ROW 9/25/2026 Villa Joel Cantertrot Dr 10100-10225 Remove tree/ limbs from ROW 9/28/2026 Villa Joel City Wide Mow / weedeat ROW 9/28/2026 Salazar Armando City Wide Mow / weedeat ROW 9/28/2026 Forbes Hunter City Wide Mow / weedeat ROW 9/28/2026 Allen Vince City Wide Mow / weedeat ROW 9/28/2026 Wehunt David Pecan Ln 1822-1899 Move items 9/28/2026 ISAIS CARDONA Pecan Ln 1822-1899 Move items 9/28/2026 Gunn Shane Pecan Ln 1822-1899 Move items 9/28/2026 Anderson Chase Pecan Ln 1822-1899 Move items 9/28/2026 Thomas Jarred 826 WILSON RD Set time on school beacon 9/28/2026 Allen Vince 2802 EAGLE NEST LN Remove dead tree / limb 9/28/2026 Forbes Hunter 2802 EAGLE NEST LN Remove dead tree / limb 9/29/2026 Forbes Hunter City Wide Mow / weedeat ROW 9/29/2026 Allen Vince City Wide Mow / weedeat ROW 9/29/2026 Villa Joel City Wide Mow / weedeat ROW 9/29/2026 Allen Vince PD Annex Move items 9/29/2026 Allen Vince Ferguson St 900-999 Trash / debris removal 9/30/2026 Villa Joel City Wide Mow / weedeat ROW 9/30/2026 Forbes Hunter City Wide Mow / weedeat ROW 9/30/2026 Allen Vince City Wide Mow / weedeat ROW 9/30/2026 ISAIS CARDONA Pecan Ln 1822-1899 Move items 9/30/2026 Wehunt David Pecan Ln 1822-1899 Move items 9/30/2026 Anderson Chase Pecan Ln 1822-1899 Move items VEHICLE MAINTENANCE SEPTEMBER 2026 MONTHLY REPORT City of Humble Reporting Dates 09/01/2026 09/30/2026 Fleet Maintenance Equipment Work Order Summary Grouped By Equipment/Vehicle Code Equipment Code / Name 1228 2020 Chevy Tahoe #1228 1232 2022 Chevy Tahoe #1232 1233 2022 Chevy Tahoe #1233 1309 2009 Chevy Silverado #3003 146 2026 Chev Tahoe 1514 2012 Ford E-250 #1514 1523 2019 Ford Transil Bus #1523 2055 2016 Ford F-550 #2055 2057 2019 Chevy Silverado #2057 2060 2022 Ford F-550 #2060 228 I/Ran Roller #228 230 2003 Case 580 Super M #230 247 2005 Kubota #247 250 2016 Ford F-550 #250 252 2016 Case #252 256 2017 Ford F-550 #256 263 2022 International Sweeper 264 2022 Ferris Mower #264 266 2023 GMC 1500 #266 270 2023 Bobcat #270 272 2024 Scag Mower 3027 2017 Ford F-550 #3027 3030 2019 Chevy Silverado #3030 328 2013 Chevy Ambulance #328 332 2019 Dodge Ram Ambulance #332 344 2020 Ford F-250 #344 351 2024 Ford Expedition #351 400 2020 Chevy Tahoe #400 401 2020 Chevy Tahoe #401 402 2020 Chevy Tahoe #402 404 Police Dept Traffic Unit # 404 408 2020 Chevy Tahoe #408 412 Police Dept. unit#412 414 2021 Chevy Tahoe # 414 421 2022 Chevy Tahoe #421 422 2022 Chevy Tahoe #422 424 2022 Chevy Tahoe #424 Work Order WO In House Out Side Date Range Count Hours Labor ($) Parts ($) Hours Labor ($) Parts ($) Total Cost ($) 09/16/26 - 09/16/26 1 2.0 44.97 88.52 0.0 0.00 0.00 133.49 09/25/26 - 09/2S/26 1 1.0 14.99 3.86 0.0 0.00 0.00 18.85 09/25/26 - 09/2S/26 1 1.0 29.98 33.25 0.0 0.00 0.00 63.23 09/10/26 - 09/24/26 2 2.0 59.96 308.73 0.0 0.00 0.00 368.69 09/17/26 - 09/17/26 1 1.0 14.99 33.25 0.0 0.00 0.00 48.24 09/22/26 - 09/22/26 1 2.0 64.52 206.96 0.0 0.00 0.00 271.48 09/24/26 - 09/30/26 2 7.0 222.89 974.26 0.0 0.00 0.00 1,197.15 09/28/26 - 09/29/26 2 5.0 167.49 61.91 0.0 0.00 0.00 229.40 09/23/26 - 09/23/26 1 3.0 89.94 651.45 0.0 0.00 0.00 741.39 09/08/26 - 09/08/26 1 2.0 S9.96 453.58 0.0 0.00 0.00 513.54 09/16/26 - 09/16/26 1 1.0 29.98 42.63 0.0 0.00 0.00 72.61 09/17/26 - 09/17/26 1 2.0 59.96 102.27 0.0 0.00 0.00 162.23 09/01/26 - 09/01/26 1 6.0 179.88 860.71 0.0 0.00 0.00 1,040.59 09/14/26 - 09/14/26 2 5.0 174.01 1,012.92 0.0 0.00 0.00 1,186.93 09/08/26 - 09/08/26 1 1.0 21.51 2,196.60 0.0 0.00 0.00 2,218.11 09/25/26 - 09/25/26 1 2.0 59.96 1,244.44 0.0 0.00 0.00 1,304.40 09/18/26 - 09/18/26 1 1.0 43.01 19.27 0.0 0.00 0.00 62.28 09/28/26 - 09/28/26 1 1.0 14.99 0.00 0.0 0.00 0.00 14.99 09/23/26 - 09/23/26 1 2.0 44.97 647.61 0.0 0.00 0.00 692.58 09/16/26 - 09/16/26 1 2.0 44.97 70.23 0.0 0.00 0.00 115.20 09/03/26 - 09/03/26 1 1.0 29.98 99.99 0.0 0.00 0.00 129.97 09/14/26 - 09/14/26 1 1.0 14.99 26.14 0.0 0.00 0.00 41.13 09/23/26 - 09/23/26 1 1.0 29.98 57.73 0.0 0.00 0.00 87.71 09/30/26 - 09/30/26 1 1.0 43.01 0.00 0.0 0.00 0.00 43.01 09/11/26 - 09/21/26 2 2.0 58.00 359.59 0.0 0.00 0.00 417.59 09/16/26 - 09/16/26 1 1.0 21.51 3.86 0.0 0.00 0.00 25.37 09/22/26 - 09/22/26 1 1.0 29.98 236.80 0.0 0.00 0.00 266.78 09/24/26 - 09/24/26 1 1.0 14.99 3.86 0.0 0.00 0.00 18.85 09/17/26 - 09/17/26 1 2.0 67.46 17.86 0.0 0.00 0.00 85.32 09/15/26 - 09/15/26 1 2.0 64.52 33.25 0.0 0.00 0.00 97.77 09/30/26 - 09/30/26 1 1.0 43.02 0.00 0.0 0.00 0.00 43.02 09/30/26 - 09/30/26 1 7.0 214.42 446.94 0.0 0.00 0.00 661.36 09/22/26 - 09/22/26 1 1.0 14.99 21.01 0.0 0.00 0.00 36.00 09/24/26 - 09/24/26 1 1.0 14.99 146.45 0.0 0.00 0.00 161.44 09/29/26 - 09/29/26 1 1.0 29.98 0.00 0.0 0.00 0.00 29.98 09/18/26 - 09/18/26 1 1.0 21.51 18.50 0.0 0.00 0.00 40.01 09/10/26 - 09/10/26 1 3.0 89.94 461.40 0.0 0.00 0.00 551.34 October 14, 2026 City of Humble Reporting Dates 09/01/2026 09/30/2026 Fleet Maintenance Equipment Work Order Summary Grouped By EquipmentNehicle Code Equipment Code / Name 425 K-9 Unit #425 Police Department 426 Crime Scene Unit #426 429 Police Dept Crime Scene Unit# 429 430 2023 Chevy Tahoe #430 437 2023 Chevy Tahoe #437 438 2023 Chevy Tahoe #438 439 2023 Chevy Tahoe #439 440 2024 Checvrolet Tahoe #440 443 2024 Chevy Tahoe Unit #443 446 2024 Chevy Tahoe Unit #446 450 2015 Chevy Tahoe #450 451 Police Department unit# 451 455 2015 Chevy Tahoe #455 456 2024 Chevy Tahoe 457 Police Department unit# 457 460 2016 Chevy Tahoe #460 463 2016 Chevy Tahoe #463 464 2016 Chevy Tahoe #464 469 2017 Ford Expedition #469 480 2018 Chevy Tahoe #480 484 2018 Chvey Tahoe #484 485 2018 Chevy Tahoe #485 486 2018 Chevy Tahoe #486 489 Police Department Unit# 489 490 Police Department unit# 490 493 Police Department unit* 493 494 Police Department unit# 494 497 2013 Chevy Tahoe #497 498 2013 Chevy Tahoe #498 499 2020 Chevy Tahoe #499 632 2021 Ford F-350 #632 642 2023 Chevy Silverado #642 928 2017 Chevy Silverado #928 70 Units Listed: 70 Work Order WO In House Out Side Date Range Count Hours Labor ($) Parts ($) Hours Labor ($) Parts ($) Total Cost ($) 09/25/26 - 09/25/26 1 1.0 14.99 146.45 0.0 0.00 0.00 161.44 09/02/26 - 09/02/26 1 1.0 21.51 65.00 0.0 0.00 0.00 86.51 09/29/26 - 09/29/26 1 1.0 14.99 33.25 0.0 0.00 0.00 48.24 09/22/26 - 09/22/26 1 1.0 29.98 78.57 0.0 0.00 0.00 108.55 09/22/26 - 09/22/26 1 1.0 21.51 3,403.41 0.0 0.00 0.00 3,424.92 09/02/26 - 09/08/26 2 5.0 134.91 0.58 0.0 0.00 0.00 135.49 09/21/26 - 09/21/26 1 3.0 89.94 464.58 0.0 0.00 0.00 554.52 09/18/26 - 09/18/26 1 1.0 14.99 3.86 0.0 0.00 0.00 18.85 09/01/26 - 09/11/26 3 3.0 129.04 300.00 0.0 0.00 0.00 429.04 09/08/26 - 09/08/26 1 1.0 21.51 6,146.48 0.0 0.00 0.00 6,167.99 09/16/26 - 09/16/26 1 1.0 43.01 0.00 0.0 0.00 0.00 43.01 09/28/26 - 09/28/26 1 4.0 104.93 405.75 0.0 0.00 0.00 510.68 09/07/26 - 09/07/26 1 3.0 74.95 329.09 0.0 0.00 0.00 404.04 09/06/26 - 09/06/26 1 1.0 21.51 2,518.26 0.0 0.00 0.00 2,539.77 09/08/26 - 09/08/26 1 2.0 59.96 33.25 0.0 0.00 0.00 93.21 09/16/26 - 09/16/26 1 2.0 59.96 23.98 0.0 0.00 0.00 83.94 09/16/26 - 09/16/26 1 1.0 43.01 0.00 0.0 0.00 0.00 43.01 09/30/26 - 09/30/26 1 1.0 29.98 0.00 0.0 0.00 0.00 29.98 09/14/26 - 09/14/26 1 4.0 150.54 0.00 0.0 0.00 0.00 150.54 09/15/26 - 09/15/26 1 2.0 64.52 0.00 0.0 0.00 0.00 64.52 09/15/26 - 09/28/26 3 8.0 250.91 1,214.77 0.0 0.00 0.00 1,465.68 09/22/26 - 09/22/26 1 8.0 344.08 1,532.01 0.0 0.00 0.00 1,876.09 09/16/26 - 09/24/26 2 10.0 345.41 314.82 0.0 0.00 0.00 660.23 09/09/26 - 09/09/26 1 2.0 86.03 326.15 0.0 0.00 0.00 412.18 09/09/26 - 09/09/26 1 1.0 21.51 919.20 0.0 0.00 0.00 940.71 09/18/26 - 09/18/26 1 1.0 14.99 33.25 0.0 0.00 0.00 48.24 09/23/26 - 09/23/26 1 1.0 29.98 79.35 0.0 0.00 0.00 109.33 09/01/26 - 09/10/26 2 3.0 89.94 292.92 0.0 0.00 0.00 382.86 09/08/26 - 09/08/26 1 1.0 43.01 24.98 0.0 0.00 0.00 67.99 09/11/26 - 09/29/26 2 1.0 36.50 140.14 0.0 0.00 0.00 176.64 09/03/26 - 09/03/26 1 1.0 21.51 18.50 0.0 0.00 0.00 40.01 09/28/26 - 09/28/26 1 1.0 14.99 33.25 0.0 0.00 0.00 48.24 09/17/26 - 09/17/26 1 1.0 29.98 573.60 0.0 0.00 0.00 603.58 09/01/26 -09/30/26 83 137.0 4,720.78 30,401.28 0.0 0.00 0.00 35,122.06 09/01/26 - 09/30/26 83 137.0 4,720.78 30,401.28 0.0 0.00 0.00 35,122.06 October 14, 2026 2 City of Humble Fleet Maintenance Equipment Work Order Summary Srouped By Equipment/Vehicle Code Equipment Code / Name Work Order WO Date Range Count Cost / Unit: Cost / WO: In House Reporting Dates 09/01 /2026 09/30/2026 Out Side Hours Labor ($) Parts ($) Hours Labor ($) Parts ($) Total Cost ($) Labor Parts Total 70 Units $67.44 $434.30 $501.74 83 Work Orders $56.88 $366.28 $423.16 October 14, 2026 3