Loading...
HomeMy WebLinkAbout2026 08 Public Works Monthly ReportCITY OF HUMBLE PUBLIC WORKS DEPARTMENT MONTHLY REPORT AUGUST 2026 MARK K. ARNOLD DIRECTOR OF PUBLIC WORKS CITY OF HUMBLE AUGUST 2026 MONTHLY GASOLINE REPORT CITY OF HUMBLE MONTHLY GASOLINE REPORT August-26 DEPARTMENT j UNLEADED DIESEL TOTAL UNLEADED DIESEL ADMINISTRATION 0 0 0 0.00% 0.00% STREET 206 530.9 736.9 6.57% 29.96% FIRE/EMS 72.3 1094.2 1166.5 2.31% 61.74% POLICE 1849.6 0 1849.6 59.02% 0.00% TRAFFIC CONTROL 207.3 0 207.3 6.61% 0.00% PARK 123 11.3 134.3 3.92% 0.64 % ANIMAL CONTROL 0 0 0 0.00% 0.00% INSPECTIONS 84.5 0 84.5 2.70% 0.00% VEH MAINT 24.4 0 24.4 0.78% 0.00% FIRE MARSHAL 153 18.9 171.9 4.88% 1.07% BLD MAINT 18.9 0 18.9 0.60% 0.00% WATER 174.4 77.9 252.3 5.56% 4.40% SEWER 107.9 39.1 147 3.44% 2.21% SENIOR ACTIVITY 1 33.6 0 33.6 1.07% 0.00% CIVIC CENTER 79 0 79 2.52% 0.00% TOTAL 3133.9 1772.3 4906.2 100.00% 100.00% PUBLIC WORKS DEPARTMENT AUGUST 2026 OVERTIME / COMPTIME MONTHLY REPORT Monthly Overtime / Comptime Report City of Humble Public Works Department Employee On -Call Time Total O.T. Total Comp Jason Campbell 15 13 1 Kyle Elliott 0 0 0 Steve Filmore 15 17 0 Tommy Hosler 0 0 0 Louis Johnson 15 10 0 Matt Watters 30 30 0 Total: 75 70 1 Employee On -Call Time Total O.T. Total Comp Zach Bullard 15 0 0 Angel Cuellar 15 7.5 0 Ray Flores 15 1 0 Kevin Gunn 15 12 0 Gordon Meadows 0 0 0 Colby Parker 15 10 0 Mike Richard 0 12.5 0 Brandon Wehunt 0 10.5 0 Total: 75 53.5 0 Street Department Employee On -Call Time Total O.T. Total Comp Vincent Allen 15 7 0 Chase Anderson 15 14 0 Isaias Cardona 15 16 6 Hunter Forbes 0 0 0 Shane Gunn 15 10 0 Jack Lemoine 0 0 0 Armando Salazar 0 5 0 Jarred Thomas 0 0 0 Joel Villa 15 0 1 David Wehunt 0 3 0 Total: 75 55 7 Employee On -Call Time Total O.T. Total Comp Frank Alexander 0 0 0 Ryan Killion 0 0 0 Bill Neeley 0 0 0 Total: 0 0 0 Building Maintenance Employee On -Call Time Total O.T. Total Comp Fred Hawkins 0 6.25 0 George McCaa 0 0 0 Brett Nielsen 0 0 0 Alex Guerra 0 12 0 Total: 0 18.25 0 PUBLIC WORKS DEPARTMENT AUGUST 2026 MONTHLY PROJECT REPORTS TABLE OF CONTENTS Project Summary page 2 Special Proiects Northshire LS upgrades and New Force Main & Gravity Line page 3 City of Houston Inter -Connect #2 page 4 South Houston Ave Road Widening & Reconstruction Project page 5 Sanitary Sewer Rehabilitation Phase 6 Project page 6 Meeks and Manning Road Paving and Drainage Improvement Project page 7 McDugald, Sharon Dr., and Carolyn Ct. Road Reconstruction Project page 8 16" Water line from Well 6 to Well 9 page 9 North Houston and Charles St Water line Improvements page 10 Project Summary Project Engineer Contractor Cost Dates Northshire LS upgrades, $ 10,473,257.40 Con. New Force Main & RPS Klotz & V&Sociates $ 1,040,830.00 Eng. Construction 75% complete $ 11,514,087.40 Gravity Line Ass s Construction City of Houston ARKK 1SJ Underground $ 273,550.00 Eng. ° Construction 85 /o complete Utilities, LLC $ 2,353,060.00 Const. Inter -Connect #2 Engineers $ 2,626,610.00 South Houston Ave Road ARKK $ 1,132,360.00 Widening & Engineers Design & Construction Engineering 95% complete Reconstruction Project Services Cost Sanitary Sewer ARKK King Solution $ 176,250.00 Eng. Construction 99% complete Rehabilitation Phase 6 Engineers Services, LLC $ 1,069,785.00 Const. $ 1,246,035.00 Project Meeks and Manning Road ARKK $ 241,750.00 Paving and Drainage Engineers Design & Construction Engineering 85% complete Improvement Project Services Cost McDugald, Sharon Dr., ARKK $ 369,500.00 Eng. and Carolyn Ct. Road Engineers Ballast Point $ 2,904,918.00 Const Construction 95% complete $ 3,274,418.00 Reconstruction Project Change Order #1 submitted for Council 16" Water line from ISJ Underground $ 178 000.00 Well to Well ARKK Engineers Utilities, LLC Design & Construction Construction 30%complete Services Cost North Houston and ARKK $ 190,250.00 Eng. Design 60% complete Charles St. water line Engineers Improvement Under Construction $ 18,839,150.40 Under Design $ 1,564,360.00 Total $ 20,403,510.40 Northshire LS Upgrade, New Force Main, New Gravity Sewer Line Project Description - This project includes Wastewater System Improvements for providing sewer service for anticipated growth in the northwest area of Humble around West Townsen. It includes the upgrades to the Northshire Lift Station including electrical work and new piping and valves, construction of approximately 10,000 linear feet of 16" force main, 5,600 linear feet of 24" gravity sewer line, and replacement of 2,300 linear feet of 27" gravity sanitary sewer line. The improvements also include replacing the siphon that crosses Garner's Bayou into the Wastewater Plant Eny_ineers — RPS — Klotz Associate, Inc. Contractor — V&S Construction Status — In August contractors installed 539 linear ft of 30" gravity sewer, setup bypass pumps on lift station, removed old piping from lift station and cleaned the lift station. City of Houston Inter -Connect #2 Project Description - This project provides a 2nd connection to the City of Houston Water System to obtain surface water from the City of Houston as part of the ground water reduction plan. This will bring surface water from the City of Houston along Rankin Road into the Well # 6 water plant site. This project consists of approximately 3700 linear feet of 20" water line. The project also included the installation of the 20" water line under US 59 and the Union Pacific Rail Road. Engineers — ARKK Engineers Contractor — ISJ Underground Utilities, LLC Status — For the month of August: Contractors installed 18 Ft 16" C-900, 20 Ft 12" C-900, (2) 12" Wheel valves and 20 Ft 12" Ductile Iron. South Houston Road Widening & Reconstruction Proiect Project Description - Project involves improvements to widen the existing 2-lane asphalt roadway to a 3-lane concrete curb and gutter roadway. Drainage improvements include installation of underground storm sewers, inlets and ditch regrading. It also includes a new traffic signal system. Engineers — ARKK Engineers Contractor — Status — Engineering 95% complete Coordinating with Centerpoint and private utilities for relocation of utilities. Sanitary Sewer Rehabilitation Phase 6 Project Project Description - Project involves replacement and rehabilitation of several deteriorated sanitary sewer line segments throughout the City. Engineers — ARKK Engineers Contractor — King Solution Services, LLC Status — Meeks and Manning Road Paving and Drainage Improvement Project Project Description - Project involves milling and overlaying the existing asphalt streets and regrading and installing roadside drainage culverts, new water line and fire hydrants along Meeks Road. Engineers — ARKK Engineers Contractor — Status — Engineering 80% complete McDugald, Sharon Dr., and Carolyn Ct. Road Reconstruction Protect Project Description - Project consists of replacing the existing asphalt streets with concrete curb and gutter streets, and will include replacing the water line and fire hydrants along McDugald. Engineers — ARKK Engineers Contractor — Ballast Point Status — For the month of August Ballast Point Construction has completed the replacement of damaged wood frame mailboxes. We are still waiting for the replacement of damaged brick mailboxes, brick layer is confirming with residents on brick color. All joint sealing has been completed throughout the project. Stripers and signage are scheduled later next month. Few areas still need grass replaced behind curb. We will begin starting a punch list starting in September to address any issues. For the Rankin and Kingfisher intersection improvements have been completed the remainder of the pavement to Well #6 will be completed after the relocation of existing utility poles. 16 inch Water line from Well 6 to Well 9 Project Description - Project will provide a 16" surface water line to connect Well 6 (Rankin Rd) to the ground storage tank and booster pumps at Well 9 (Carpenter Rd). This will allow the surface water to be provided from 3 of the City's well sites. Engineers — ARKK Engineers Contractor — Status — Construction 30% complete For the month of August: Contractors installed 16" C 900 Water Line 2,499 LF and 16" Gave Valves (2 each) North Houston and Charles St. Water line Improvements Project Description - Project will replace approximately 3,000' of existing water line along N Houston Ave between Meek Road and E Townsen Blvd and approximately 1,200' of new water line along Charles Street between 7th Street and FM 1960 Bypass. The proposed improvements will help improve water quality and flow throughout the City's existing water distribution infrastructure. Engineers — ARKK Engineers Contractor — Status — Design is 60% complete WATER DEPARTMENT AUGUST 2026 MONTHLY REPORT City of Humble Water Pumpage Report 2026 4201 Month Total Monthly Pumpage Total Well Pumpage Total City of Houston Peak Daily Pumpage Low Daily Pumpage Average Daily Pumpage Total Monthly Connections January 87,510 35,750 51,760 3,488 2,347 2,823 4,216 February 76,169 31,975 44,194 2,997 2,419 2,720 4,211 March 94,507 43,516 50,991 6,172 2,276 3,049 4,218 April 84,568 28,985 55,583 3,317 2,368 2,819 4,212 May 92,859 41,663 51,196 4,137 2,537 2,995 4,233 June 95,253 43,798 51,455 3,972 2,482 3,175 4,260 July 117,437 44,349 73,088 4,491 2,760 3,788 4,264 August 131,332 47,160 84,172 5,151 3,689 4,237 4,271 September October November December 4,201 Total 779,635 317,196 462,439 33,725 20,878 25,606 63 Maximum 131,332 47,160 84,172 6,172 3,689 4,237 Minimum 76,169 28,985 44,194 2,997 2,276 2,720 Average 97,454 39,650 57,805 4,216 2,610 3,201 Difference Between Water Billed and Water Pumped Total METERED DIFF VS PUMP Percent Loss Percent Metered 75,658 11,852 13.54% 86.46% 47,385 28,784 37.79% 62.21% 78,636 15,871 16.79% 83.21% 77,187 7,381 8.73% 91.27% 71,239 21,620 23.28% 76.72% 80,582 14,671 15.40% 84.60% 96,318 21,119 17.98% 82.02% TCEQ MONTHLY REPORT SEND REPORT TO: Water Works Operation for Ground Water Supplies (1) Name of System: CITY OF HUMBLE County (1a) System I.D. No 1010014 TCEQ P.O. BOX 13087 Austin, Tx. 78711-3087 HARRIS Month of: August-26 PUMPAGE TO DISTRIBUTION SYSTEM IN THOUSAND GALS. (6) PURCHASED (7) SOLD Day (2) DIRECT (3) FROM GLAD. (4) TOTAL 5) DISINFECTION FROM C/O TO C/O FROM WELLS STORAGE PUMPAGE C12 Lbs. I NH3N Gal. HOUSTON HOUSTON 1 1440 1596 5151 91 21.9 2115 536 2 1007 679 3850 53 11.5 2164 531 3 985 1113 4623 67 15.1 2525 398 4 1 876 811 4360 59 12.4 2673 422 5 737 1002 4230 55 11.1 2491 699 6 964 992 4074 66 71.2 2118 631 7 1185 937 4450 70 14.6 2328 523 8 987 716 4172 58 11.3 2469 536 9 312 512 3772 29 5.6 2948 515 10 719 509 3768 44 8 2540 531 11 552 835 4167 46 9.3 2780 519 12 488 581 3869 37 7A 2800 (533 13 850 1182 4463 73 37.5 2431 546 14 522 886 3757 50 11 2349 574 15 457 302 3689 27 6.4 2930 469 16 435 578 3822 35 8.3 2809 575 17 640 1008 4324 58 13.6 2676 5)22 18 694 1597 4843 78 18.6 2552 529 19 392 820 4545 40 10 3333 590 20 438 992 4062 48 11.1 2632 512 21 366 893 4306 41 11 3047 538 22 561 1001 4521 51 18.3 2959 495 23 620 811 4217 50 13.5 2786 541 24 677 768 4350 57 12.3 2905 444 25 702 1205 4815 87 19 2908 610 26 425 1111 4150 52 11.6 2614 619 27 540 869 4067 50 11.1 2658 628 28 507 940 4642 49 11.6 3195 456 29 322 486 4103 30 6.2 3295 544 30 394 485 3831 30 7.3 29521 554 31 510 639 4339 43 9.81 31901 564 TOTAL 20304 26856 131332 1624 447.6 84172 16784 AVG. 656 866 4237 52 14 2715 541 MAX. 1440 1597 5151 91 71.2 3333 699 MIN. 312 302 3689 27 5.6 2115 398 (10) No. of active water services: 4271 (11) Chemical analysis: August-26 (12) Dates and results of distribution bacteriological analyses: 15 Samples, 15 Good Samples. (13) Dates and results of raw unchlorinated well water samples: (14) Reservoirs or tanks cleaned: None (16) Dead ends flush: 08/10/26 (16) Over -flow Site / Amount: =.S.T # 1 - 60,000 1 r # 2 - 80,000 / E.S."T 100,000 / E.S.T # 6 - 120,000 (17) Submitted by / Cert.#: THOMAS E. HOSLER WG0016273 (18) Total Monthly Combined Over -flows 360,000 WASTEWATER DEPARTMENT AUGUST 2026 MONTHLY REPORT City of Humble Wastewater Pumpage Report 2026 Month Total Monthly Treated Peak Daily Treated Low Daily Treated Average Daily Treated January 63,743 3,040 1,665 2,056 February 57,820 3,108 1,780 2,065 March 67,938 4,154 1,758 2,191 April 73,122 4,677 1,871 2,437 May 79,244 6,707 1,917 2,556 June 81,090 6,551 2,054 2,703 July 70,777 3,100 1,828 2,283 August 67,164 2,454 1,906 2,166 September October November December Total 560,898 33,791 14,779 18,457 Maximum 81,090 6,707 2,054 2,703 Minimum 57,820 2,454 1,665 2,056 Average 70,112 4,224 1,847 2,307 Difference Between Water Pumped vs. Wastewater Treated Total Water Pumped Wastewater Treated Pumped vs. Treated Percent Treated 87,510 63,743 23,767 72.84% 76,169 57,820 18,349 75.91% 94,507 67,938 26,569 71.89% 84,568 73,122 11,446 86.47% 92,859 79,244 13,615 85.34% 95,253 81,090 14,163 85.13% 117,437 70,777 46,660 60.27% 131,332 67,164 64,168 51.14% 779,635 560,898 218,737 71.94% EPA - TX0034401 City of Humble TCEQ - 0010763-002 Southwest Wastewater Treatment Facility August-26 Date Temp. Rain Flow Meter Total Flow Effluent Sample Flow Non Potable Beltpress Bleach LROPM 14,660,900 CBOD T.S.S. NH3N Ecoli pH DO Temp. Water Water I -Aug 88.3 14,663,118 2,218,000 2.17 116,773 2.5 2-Aug 89.6 14,665,275 2,157,000 2.18 116,918 2.6 3-AUq 88.2 14,667,430 2,155,000 2.11 116,082 2.5 4-Aug 85.6 14,669,600 2,170,000 2.06 159,558 3.2 5-Aug 86.9 14,671,761 2,161,000 7.56 31.1 2 168,583 42,751 4 6-Auq 86.7 14,673,988 2,227,000 7.48 7.38 30.9 2.5 160,998 42,108 3.1 7-Aug 86.5 14,676,189 2,201,000 1.75 145,478 28,688 2.5 8-Aug 85.5 14,678,534 2,345,000 1.74 126,758 3,000 2.3 9-AUq 85.7 14,680,721 2,187,000 1.76 116,768 2.2 10-Aug 85.4 14,682,627 1,906,000 1 1 1.8 102,729 3,200 5.5 11 -Aug 85.2 14,684,802 2,175,000 2.33 166,316 35,649 2.9 12-Aug 86.4 14,687,073 2,271,000 2.06 167,981 36,806 3 13-Aug 87.7 14,689,252 2,179,000 7.44 7.65 30.9 3.61 163,144 36,269 2.5 14-Auq 86.5 14,691,530 2,278,000 7.44 31.2 2.07 135,886 19,215 2.2 15-Auq 87.8 14,693,741 2,211,000 2.23 120,872 2.8 16-Aug 84.9 14,695,864 2,123,000 1 1.86 122,249 0 17-Aug 83.9 14,697,923 2,059,000 1.85 124,714 1,598 0 18-Aug 87.4 14,700,052 2,129,000 1.86 140,371 37,002 0.3 19-Aug 89 14,702,108 2,056,000 7.35 31.3 2.22 106,775 0 20-Auq 86.9 14,704,268 2,160,000 7.53 7.3 31.3 2.84 151,989 36,037 3.6 21-Aug 88.7 14,706,371 2,103,000 2.14 154,566 30,072 9.3 22-Aug 89.2 14,708,544 2,173,000 1.88 125,095 0.9 23-Aug 88.4 14,710,640 2,096,000 1 1.79 123,878 0 24-Aua 88.1 14,712,765 2,125,000 1 1 1.98 129,250 0 25-Aug 89.2 14,714,928 2,163,000 1 2.15 163,801 33,987 0.1 26-Auq 89.3 14,717,062 2,134,000 1 6.91 31.5 2.13 157,010 34,027 0 27-Aug 89.8 14,719,186 2,124, 000 7.43 6.82 31.4 2.38 171,541 33,199 2 28-Aug 84.4 0.14 14,721,328 2,142,000 2.26 167,862 31,386 2.1 29-Aug 84.4 0.48 14,723,782 2,454,000 2.86 128,770 0.3 30-Aug 85.6 14,725,984 2,202,000 2.57 126,702 0 31-Aug 85.7 14,728,064 2,080,000 1 1.93 128,946 0 Total 2696.9 0.62 67,164,000 29.88P76(5331�.51 .6 67.07 4308,363 484,994 62.4 Av 87 0 2,166,581 7.471 2 138,979 28,529 2.01 Min. 83.9 0.14 1,906,000 7.43.9 1.74 102,729 1,598 0 Max. 89.8 0.48 2,454,000 7.533.61 1 171,541 42,751 9.3 STREET DEPARTMENT AUGUST 2026 MONTHLY REPORT Street Department Date Employee Name Location Task 8/28/2026 Gunn Shane Townsen Blvd E 20100-20139 Patch pothole 8/28/2026 Salazar Armando Townsen Blvd E 20100-20139 Patch pothole 8/28/2026 Salazar Armando Westminster Dr 9800-9843 Patch pothole 8/28/2026 Gunn Shane Westminster Dr 9800-9843 Patch pothole 8/28/2026 Salazar Armando Fieldtree Dr20200-20257 Patch pothole 8/28/2026 Gunn Shane Fieldtree Dr20200-20257 Patch pothole 8/28/2026 Gunn Shane Whitaker Dr 19700-19799 Patch pothole 8/28/2026 Salazar Armando Whitaker Dr 19700-19799 Patch pothole 8/28/2026 Gunn Shane Townsen Blvd W 20200-20299 Trim tree / limbs obstructing sight / sign 8/28/2026 Salazar Armando Townsen Blvd W 20200-20299 Trim tree / limbs obstructing sight / sign 8/28/2026 Salazar Armando Fieldtree Dr 20600-20649 Trim tree / limbs obstructing sight / sign 8/28/2026 Gunn Shane Fieldtree Dr 20600-20649 Trim tree / limbs obstructing sight / sign 8/27/2026 Anderson Chase Rankin Rd 8100-8107 Replace damaged / faded sign 8/27/2026 Forbes Hunter Rankin Rd 8100-8107 Replace damaged / faded sign 8/27/2026 Gunn Shane Fieldtree Dr20200-20257 Patch pothole 8/27/2026 Salazar Armando Fieldtree Dr20200-20257 Patch pothole 8/27/2026 Villa Joel Fieldtree Dr 20200-20257 Patch pothole 8/27/2026 Salazar Armando Meek Rd 918-1031 Patch pothole 8/27/2026 Villa Joel Meek Rd 918-1031 Patch pothole 8/27/2026 Gunn Shane Meek Rd 918-1031 Patch pothole 8/27/2026 Gunn Shane Cantertrot Dr 9700-9899 Dead animal pickup 8/27/2026 Salazar Armando Cantertrot Dr 9700-9899 Dead animal pickup 8/27/2026 ISAIS CARDONA N Houston Ave 400-499 Hang or replace signs 8/27/2026 Wehunt David N Houston Ave 400-499 Hang or replace signs 8/21/2026 Anderson Chase S Houston Ave 556-599 Remove tree/ limbs from ROW 8/21/2026 Salazar Armando S Houston Ave 556-599 Remove tree/ limbs from ROW 8/21/2026 ISAIS CARDONA S Houston Ave 556-599 Remove tree/ limbs from ROW 8/21/2026 Forbes Hunter S Houston Ave 556-599 Remove tree/ limbs from ROW 8/21/2026 Villa Joel S Houston Ave 556-599 Remove tree/ limbs from ROW 8/20/2026 Salazar Armando Rankin Rd 8100-8107 Remove tree/ limbs from ROW 8/20/2026 Villa Joel Rankin Rd 7800-7829 Remove tree/ limbs from ROW 8/20/2026 Salazar Armando Rankin Rd 7800-7829 Remove tree/ limbs from ROW Date Employee Name Location Task 8/28/2026 Gunn Shane Townsen Blvd E 20100-20139 Patch pothole 8/28/2026 Salazar Armando Townsen Blvd E 20100-20139 Patch pothole 8/28/2026 Salazar Armando Westminster Dr 9800-9843 Patch pothole 8/28/2026 Gunn Shane Westminster Dr9800-9843 Patch pothole 8/28/2026 Salazar Armando Fieldtree Dr20200-20257 Patch pothole 8/28/2026 Gunn Shane Fieldtree Dr20200-20257 Patch pothole 8/28/2026 Gunn Shane Whitaker Dr 19700-19799 Patch pothole 8/28/2026 Salazar Armando Whitaker Dr 19700-19799 Patch pothole 8/28/2026 Gunn Shane Townsen Blvd W 20200-20299 Trim tree / limbs obstructing sight / sign 8/28/2026 Salazar Armando Townsen Blvd W 20200-20299 Trim tree / limbs obstructing sight / sign 8/28/2026 Salazar Armando Fieldtree Dr 20600-20649 Trim tree / limbs obstructing sight / sign 8/28/2026 Gunn Shane Fieldtree Dr 20600-20649 Trim tree / limbs obstructing sight / sign 8/27/2026 Anderson Chase Rankin Rd 8100-8107 Replace damaged / faded sign 8/27/2026 Forbes Hunter Rankin Rd 8100-8107 Replace damaged / faded sign 8/27/2026 Gunn Shane Fieldtree Dr20200-20257 Patch pothole 8/27/2026 Salazar Armando Fieldtree Dr20200-20257 Patch pothole 8/27/2026 Villa Joel Fieldtree Dr 20200-20257 Patch pothole 8/27/2026 Salazar Armando Meek Rd 918-1031 Patch pothole 8/27/2026 Villa Joel Meek Rd 918-1031 Patch pothole 8/27/2026 Gunn Shane Meek Rd 918-1031 Patch pothole 8/27/2026 Gunn Shane Cantertrot Dr 9700-9899 Dead animal pickup 8/27/2026 Salazar Armando Cantertrot Dr 9700-9899 Dead animal pickup 8/27/2026 ISAIS CARDONA N Houston Ave 400-499 Hang or replace signs 8/27/2026 Wehunt David N Houston Ave 400-499 Hang or replace signs 8/21/2026 Anderson Chase S Houston Ave 556-599 Remove tree/ limbs from ROW 8/21/2026 Salazar Armando S Houston Ave 556-599 Remove tree/ limbs from ROW 8/21/2026 ISAIS CARDONA S Houston Ave 556-599 Remove tree/ limbs from ROW 8/21/2026 Forbes Hunter S Houston Ave 556-599 Remove tree/ limbs from ROW 8/21/2026 Villa Joel S Houston Ave 556-599 Remove tree/ limbs from ROW 8/20/2026 Salazar Armando Rankin Rd 8100-8107 Remove tree/ limbs from ROW 8/20/2026 Villa Joel Rankin Rd 7800-7829 Remove tree/ limbs from ROW 8/20/2026 Salazar Armando Rankin Rd 7800-7829 Remove tree/ limbs from ROW Date Employee Name Location Task 8/20/2026 Villa Joel Rankin Rd 8100-8107 Remove tree/ limbs from ROW 8/20/2026 ISAIS CARDONA S Avenue C 100-199 Replace lifting / falling sidewalk 8/20/2026 Wehunt David S Avenue C 100-199 Replace lifting / falling sidewalk 8/20/2026 Anderson Chase S Memorial Dr 18842-18899 Replace concrete / asphalt paving due to utility repair 8/20/2026 Forbes Hunter S Memorial Dr 18842-18899 Replace concrete / asphalt paving due to utility repair 8/20/2026 Anderson Chase Eagle Nest Ln 2600-2699 Trash / debris removal 8/20/2026 Forbes Hunter Eagle Nest Ln 2600-2699 Trash / debris removal 8/20/2026 Villa Joel Welch St 600-699 Customer tree / limb request 8/20/2026 Salazar Armando Welch St 600-699 Customer tree / limb request 8/20/2026 Anderson Chase Roadrunner Ln 7316-7399 Remove dead tree / limb 8/20/2026 Forbes Hunter Roadrunner Ln 7316-7399 Remove dead tree / limb 8/19/2026 Villa Joel Townsen Blvd W 20100-20199 Paving misc request 8/19/2026 Forbes Hunter Townsen Blvd W 20100-20199 Paving misc request 8/19/2026 Anderson Chase Townsen Blvd W 20100-20199 Paving misc request 8/19/2026 ISAIS CARDONA Water WeLI #1 Paving misc request 8/19/2026 Salazar Armando Water Well #1 Paving misc request 8/19/2026 Wehunt David Water Well #1 Paving misc request 8/18/2026 Salazar Armando Water Well #1 Paving misc request 8/18/2026 Wehunt David Water Well #1 Paving misc request 8/18/2026 ISAIS CARDONA Water Well #1 Paving misc request 8/18/2026 Villa Joel Main St 200-299 Saw cut pavement 8/18/2026 Forbes Hunter Main St 200-299 Saw cut pavement 8/18/2026 Forbes Hunter Water Well #1 Remove tree/ limbs from ROW 8/18/2026 Villa Joel Water WeLI #1 Remove tree/ limbs from ROW 8/17/2026 Villa Joel Townsen Blvd E 20100-20139 Paving misc request 8/17/2026 Anderson Chase Townsen Blvd E 20100-20139 Paving misc request 8/17/2026 ISAIS CARDONA Townsen Blvd E 20100-20139 Paving misc request 8/17/2026 Forbes Hunter Townsen Blvd E 20100-20139 Paving misc request 8/17/2026 Wehunt David Willow St 100-199 Move items 8/17/2026 Salazar Armando Willow St 100-199 Move items 8/17/2026 Wehunt David Granberry St 100-199 Move items 8/17/2026 Salazar Armando Granberry St 100-199 Move items Date Employee Name Location Task 8/14/2026 Wehunt David Granberry St 100-199 Move items 8/14/2026 Forbes Hunter Granberry St 100-199 Move items 8/14/2026 Anderson Chase Granberry St 100-199 Move items 8/14/2026 Wehunt David N Memorial Dr 18952-18999 Hang or replace signs 8/14/2026 ISAIS CARDONA N Memorial Dr 18952-18999 Hang or replace signs 8/14/2026 ISAIS CARDONA Memorial Blvd 9800-9999 Hang or replace signs 8/14/2026 Wehunt David Memorial Blvd 9800-9999 Hang or replace signs 8/14/2026 ISAIS CARDONA Main St 300-399 Repair / replace flags 8/14/2026 Wehunt David Main St 300-399 Repair / replace flags 8/14/2026 Gunn Shane N Hollow Cir 7600-7699 Trash / debris removal 8/14/2026 Anderson Chase N Hollow Cir 7600-7699 Trash / debris removal 8/14/2026 Allen Vince 1015 MEMORIAL GLEN DR Trash / debris removal 8/14/2026 Gunn Shane 1015 MEMORIAL GLEN DR Trash / debris removal 8/14/2026 Gunn Shane Glen Valley Dr 1000-1099 Trash / debris removal 8/14/2026 Salazar Armando Glen Valley Dr 1000-1099 Trash / debris removal 8/13/2026 Salazar Armando Montgomery Ln 1500-1599 Trash / debris removal 8/13/2026 Gunn Shane Montgomery Ln 1500-1599 Trash / debris removal 8/13/2026 ISAIS CARDONA N Memorial Dr 18952-18999 Hang or replace signs 8/13/2026 Wehunt David N Memorial Dr 18952-18999 Hang or replace signs 8/13/2026 Gunn Shane Townsen Blvd E 20100-20139 Paving misc request 8/13/2026 Salazar Armando Townsen Blvd E 20100-20139 Paving misc request 8/13/2026 Villa Joel Townsen Blvd E 20100-20139 Paving misc request 8/13/2026 Anderson Chase Townsen Blvd E 20100-20139 Paving misc request 8/13/2026 Salazar Armando Townsen Blvd W 20100-20199 Paving misc request 8/13/2026 Anderson Chase Townsen Blvd W 20100-20199 Paving misc request 8/13/2026 Gunn Shane Townsen Blvd W 20100-20199 Paving misc request 8/13/2026 Villa Joel Townsen Blvd W 20100-20199 Paving misc request 8/12/2026 Salazar Armando Townsen Blvd E 20100-20139 Paving misc request 8/12/2026 Forbes Hunter Townsen Blvd E 20100-20139 Paving misc request 8/12/2026 Anderson Chase Townsen Blvd E 20100-20139 Paving misc request 8/12/2026 Villa Joel Townsen Blvd E 20100-20139 Paving misc request 8/12/2026 Gunn Shane Townsen Blvd E 20100-20139 Paving misc request Date Employee Name Location Task 8/12/2026 Allen Vince 501 WILSON RD Dead animal pickup 8/12/2026 Forbes Hunter 501 WILSON RD Dead animal pickup 8/11/2026 Forbes Hunter City Wide Mow/weedeat ROW 8/11/2026 Salazar Armando Windswept Dr 1000-1099 Sinkhole 8/11/2026 Isaias Cardona Windswept Dr 1000-1099 Sinkhole 8/11/2026 Gunn Shane Windswept Dr 1000-1099 Sinkhole 8/11/2026 Anderson Chase Windswept Dr 1000-1099 Sinkhole 8/11/2026 Anderson Chase S Avenue E 300-433 Sinkhole 8/11/2026 Isaias Cardona S Avenue E 300-433 Sinkhole 8/11/2026 Salazar Armando S Avenue E 300-433 Sinkhole 8/11/2026 Salazar Armando Eagle Nest Ln 2700-2719 Remove tree/ limbs from ROW 8/11/2026 Gunn Shane 2707 BLUE JAY CIR Remove tree/ limbs from ROW 8/11/2026 Salazar Armando 2707 BLUE JAY CIR Remove tree/ limbs from ROW 8/11/2026 Allen Vince 2707 BLUE JAY CIR Remove tree/ limbs from ROW 8/11/2026 Gunn Shane Eagle Nest Ln 2700-2719 Remove tree/ limbs from ROW 8/10/2026 Gunn Shane City Wide Mow / weedeat ROW 8/10/2026 Isaias Cardona City Wide Mow / weedeat ROW 8/10/2026 Forbes Hunter City Wide Mow / weedeat ROW 8/10/2026 Salazar Armando City Wide Mow / weedeat ROW 8/10/2026 Villa Joel City Wide Mow / weedeat ROW 8/10/2026 Allen Vince City Wide Mow / weedeat ROW 8/10/2026 Allen Vince 19700 WHITAKER DR Grout / repair inlet 8/10/2026 Allen Vince 521 LAKELAND DR Remove tree/ limbs from ROW 8/10/2026 Allen Vince 918 GRACE LN Remove tree/ limbs from ROW 8/4/2026 Villa Joel City Wide Mow / weedeat ROW 8/4/2026 Isaias Cardona City Wide Mow/weedeat ROW 8/4/2026 Forbes Hunter City Wide Mow / weedeat ROW 8/4/2026 Wehunt David City Wide Mow / weedeat ROW 8/4/2026 Gunn Shane City Wide Mow/weedeat ROW 8/4/2026 Allen Vince City Wide Mow / weedeat ROW 8/4/2026 ISAIS CARDONA Animal Shelter Mow animal shelter 8/4/2026 Allen Vince Animal Shelter Mow animal shelter Date Employee Name Location Task 8/3/2026 Forbes Hunter City Wide Mow/weedeat ROW 8/3/2026 Villa Joel City Wide Mow / weedeat ROW 8/3/2026 Isaias Cardona City Wide Mow / weedeat ROW 8/3/2026 Gunn Shane City Wide Mow / weedeat ROW 8/3/2026 Allen Vince City Wide Mow / weedeat ROW 8/3/2026 Wehunt David City Wide Mow / weedeat ROW Monthly WO Report Dead Animals Potholes Sidewalk Tree/Limb Removal January 8 0 14 16 February 0 4 0 6 March 5 6 2 6 April 9 4 0 8 May 5 5 1 18 June 9 2 0 9 July 5 1 1 6 August 2 13 0 9 VEHICLE MAINTENANCE AUGUST 2026 MONTHLY REPORT City of Humble Reporting Dates 08/01 /2026 08/31 /2026 Fleet Maintenance Work Order Equipment Summary Grouped By Equipment/Vehicle Code WO # Date Equipment Code / Name Odometer Out Side Labor Parts Labor In House Parts Total Cost 3113 08/06/26 1309 2009 Chevy Silverado #3003 72,316 M $0.00 $0.00 $29.98 $19.98 $49.96 3114 08/07/26 1232 2022 Chevy Tahoe #1232 64,629 M $0.00 $0.00 $14.99 $146.45 $161.44 3115 08/07/26 499 2020 Chevy Tahoe #499 80,772 M $0.00 $0.00 $14.99 $33.25 $48.24 3116 08/07/26 931 2022 Chevy Silverado #931 37,813 M $0.00 $0.00 $14.99 $3.86 $18.85 3117 08/03/26 933 Code Enforcement Unit# 933 3,203 M $0.00 $0.00 $119.92 $0.00 $119.92 3118 08/06/26 496 Police Department unit# 496 13,634 M $0.00 $0.00 $21.51 $0.00 $21.51 3119 08/05/26 496 Police Department unit# 496 13,629 M $0.00 $0.00 $21.51 $0.00 $21.51 3120 08/05/26 487 2018 Chevy Tahoe #487 51,651 M $0.00 $0.00 $164.89 $1,072.41 $1,237.30 3121 08/06/26 485 2018 Chevy Tahoe #485 91,405 M $0.00 $0.00 $21.51 $3.86 $25.37 3122 08/04/26 446 2024 Chevy Tahoe Unit #446 26,231 M $0.00 $0.00 $14.99 $33.25 $48.24 3123 08/07/26 443 2024 Chevy Tahoe Unit #443 34,040 M $0.00 $0.00 $14.99 $33.25 $48.24 3124 08/03/26 439 2023 Chevy Tahoe #439 29,410 M $0.00 $0.00 $89.94 $428.65 $518.59 3125 08/07/26 425 K-9 Unit #425 Police Department 3,280 M $0.00 $0.00 $36.50 $37.11 $73.61 3126 08/03/26 423 2022 Chevy Tahoe #423 60,098 M $0.00 $0.00 $150.55 $147.19 $297.74 3127 08/04/26 422 2022 Chevy Tahoe #422 39,983 M $0.00 $0.00 $21.51 $18.50 $40.01 3128 08/07/26 404 Police Dept Traffic Unit # 404 8,513 M $0.00 $0.00 $21.51 $146.45 $167.96 3129 08/03/26 403 Police Dept Traffic Unit# 403 7,130 M $0.00 $0.00 $14.99 $146.45 $161.44 3130 08/07/26 401 2020 Chevy Tahoe #401 76,488 M $0.00 $0.00 $86.03 $85.03 $171.06 3131 08/04/26 343 2019 Chevy Tahoe #343 35,904 M $0.00 $0.00 $52.47 $336.52 $388.99 3132 08/03/26 331 2013 Chevy Ambulance #331 78,392 M $0.00 $0.00 $64.52 $319.72 $384.24 3133 08/07/26 263 2022 International Sweeper 27,932 H $0.00 $0.00 $59.96 $40.41 $100.37 3134 08/11/26 204 2000 Boom Truck #204 60,836 M $0.00 $0.00 $44.97 $54.10 $99.07 3135 08/12/26 207 2007 Chevy Dump Truck #207 27,036 M $0.00 $0.00 $29.98 $67.28 $97.26 3136 08/05/26 263 2022 International Sweeper 27,903 H $0.00 $0.00 $29.98 $28.03 $58.01 3137 08/10/26 264 2022 Ferris Mower #264 485 H $0.00 $0.00 $29.98 $48.83 $78.81 3138 08/10/26 268 2023 Scaq Turf Tiqer #268 206 H $0.00 $0.00 $29.98 $108.91 $138.89 3139 08/13/26 459 2015 Chevy Tahoe #459 173,332 M $0.00 $0.00 $59.96 $75.65 $135.61 3140 08/13/26 434 2013 Chevy Tahoe #434 144,723 M $0.00 $0.00 $14.99 $26.39 $41.38 3141 08/13/26 279 Street Department unit# 279 49 M $0.00 $0.00 $36.50 $74.94 $111.44 3142 08/13/26 462 2024 Chevy Tahoe Unit #462 10,178 M $0.00 $0.00 $43.02 $10.30 $53.32 3143 08/13/26 496 Police Department unit# 496 13,918 M $0.00 $0.00 $21.51 $0.00 $21.51 3144 08/11/26 277 Street Dept Dump Trucj Unit# 277 8,109 M $0.00 $0.00 $21.51 $0.00 $21.51 3145 08/11/26 400 2020 Chevy Tahoe #400 58,026 M $0.00 $0.00 $64.53 $37.11 $101.64 3146 08/12/26 405 2020 Chevy Tahoe #405 42,428 M $0.00 $0.00 $21.51 $33.25 $54.76 3147 08/11/26 427 Crime Scene Unit #427 7,004 M $0.00 $0.00 $14.99 $33.25 $48.24 September 15, 2026 1 City of Humble Reporting Dates 08/01 /2026 08/31 /2026 Fleet Maintenance Work Order Equipment Summary Grouped By Equipment/Vehicle Code WO # Date Equipment Code / Name Odometer Out Side Labor Parts Labor In House Parts Total Cost 3148 08/13/26 428 Crime Scene Unit # 428 5,581 M $0.00 $0.00 $21.51 $33.25 $54.76 3149 08/12/26 433 2013 Chevy Tahoe #433 107,344 M $0.00 $0.00 $43.02 $26.54 $69.56 3150 08/12/26 455 2015 Chevy Tahoe #455 84,376 M $0.00 $0.00 $86.03 $37.11 $123.14 3151 08/12/26 467 2016 Chevy Tahoe #467 181,522 M $0.00 $0.00 $86.03 $58.23 $144.26 3152 08/13/26 475 Police Dept Detective Unit# 475 19,252 M $0.00 $0.00 $43.01 $0.00 $43.01 3153 08/12/26 477 Police Dept Detective Unit# 477 5,852 M $0.00 $0.00 $21.51 $23.13 $44.64 3154 08/10/26 929 2022 Chevy Silverado #929 48,912 M $0.00 $0.00 $14.99 $3.86 $18.85 3155 08/12/26 1228 2020 Chevy Tahoe #1228 53,843 M $0.00 $0.00 $64.52 $131.11 $195.63 3156 08/10/26 2056 2016 Chevy Silverado #2056 91,170 M $0.00 $0.00 $7.50 $6.12 $13.62 3157 08/17/26 1523 2019 Ford Transil Bus #1523 78,533 M $0.00 $0.00 $43.01 $0.00 $43.01 3158 08/19/26 1234 2022 Chevy Tahoe #1234 30,990 M $0.00 $0.00 $21.51 $3.86 $25.37 3159 08/14/26 1104 2016 Chevy Silverado #1104 5,132 M $0.00 $0.00 $14.99 $27.13 $42.12 3160 08/13/26 496 Police Department unit# 496 13,920 M $0.00 $0.00 $14.99 $3.86 $18.85 3161 08/14/26 494 Police Department unit# 494 17,641 M $0.00 $0.00 $29.98 $179.70 $209.68 3162 08/18/26 487 2018 Chevy Tahoe #487 51,984 M $0.00 $0.00 $58.00 $3.86 $61.86 3163 08/19/26 485 2018 Chevy Tahoe #485 91,600 M $0.00 $0.00 $44.97 $116.53 $161.50 3164 08/18/26 252 2016 Case #252 480 H $0.00 $0.00 $149.90 $311.44 $461.34 3165 08/20/26 491 Police Department unit# 491 7,892 M $0.00 $0.00 $43.02 $0.00 $43.02 3166 08/20/26 403 Police Dept Traffic Unit# 403 7,785 M $0.00 $0.00 $21.51 $0.00 $21.51 3167 08/19/26 267 1998 Isuzu #267 21,558 H $0.00 $0.00 $89.94 $241.52 $331.46 3168 08/17/26 448 2015 Chevy Express #448 4,851 M $0.00 $0.00 $107.53 $227.00 $334.53 3169 08/20/26 1221 2003 Army Truck #1221 12,936 M $0.00 $0.00 $119.92 $290.67 $410.59 3170 08/12/26 276 2025 Ford F750 Dump truck 870 M $0.00 $0.00 $29.98 $64.47 $94.45 3171 08/17/26 484 2018 Chvey Tahoe #484 103,311 M $0.00 $0.00 $32.26 $32.72 $64.98 3172 08/18/26 464 2016 Chevy Tahoe #464 134,177 M $0.00 $0.00 $44.97 $146.45 $191.42 3173 08/18/26 464 2016 Chevy Tahoe #464 134,177 M $0.00 $0.00 $101.01 $82.34 $183.35 3174 08/17/26 459 2015 Chevy Tahoe #459 173,332 M $0.00 $0.00 $86.02 $159.86 $245.88 3175 08/13/26 446 2024 Chevy Tahoe Unit #446 26,980 M $0.00 $0.00 $44.97 $0.00 $44.97 3176 08/19/26 437 2023 Chevy Tahoe #437 38,151 M $0.00 $0.00 $74.95 $218.24 $293.19 3177 08/19/26 435 2023 Chevy Tahoe #435 32,727 M $0.00 $0.00 $59.96 $292.90 $352.86 3178 08/17/26 424 2022 Chevy Tahoe #424 35,468 M $0.00 $0.00 $21.51 $11,875.20 $11,896.71 3179 08/14/26 425 K-9 Unit #425 Police Department 3,796 M $0.00 $0.00 $21.51 $18.50 $40.01 3180 08/19/26 408 2020 Chevy Tahoe #408 109,590 M $0.00 $0.00 $44.97 $43.09 $88.06 3181 08/18/26 406 2020 Chevy Tahoe #406 48,427 M $0.00 $0.00 $21.51 $66.93 $88.44 3182 08/20/26 402 2020 Chevy Tahoe #402 107,868 M $0.00 $0.00 $107.53 $742.87 $850.40 September 15, 2026 2 City of Humble Reporting Dates 08/01 /2026 08/31 /2026 Fleet Maintenance Work Order Equipment Summary Grouped By Equipment/Vehicle Code WO # Date Equipment Code / Name Odometer Out Side Labor Parts In Labor House Parts Total Cost 3183 08/17/26 355 Fire/EMS unit# 355 12,243 M $0.00 $0.00 $14.99 $3.86 $18.85 3184 08/17/26 352 2023 Dodqe Ram 4500 Ambulance 18,337 M $0.00 $0.00 $21.51 $2,150.48 $2,171.99 3185 08/18/26 328 2013 Chevy Ambulance #328 71,129 M $0.00 $0.00 $43.01 $0.00 $43.01 3186 08/19/26 274 2009 Chevy Silverado #274 108,758 M $0.00 $0.00 $64.52 $193.88 $258.40 3187 08/13/26 267 1998 Isuzu #267 28,090 H $0.00 $0.00 $29.98 $7.00 $36.98 3188 08/12/26 267 1998 Isuzu #267 21,519 H $0.00 $0.00 $14.99 $8.75 $23.74 3189 08/21/26 485 2018 Chevy Tahoe #485 91,630 M $0.00 $0.00 $29.98 $104.38 $134.36 3190 08/21/26 332 2019 Dodqe Ram Ambulance #332 66,217 M $0.00 $0.00 $21.51 $13.99 $35.50 3191 08/24/26 230 2003 Case 580 Super M #230 4,595 H $0.00 $0.00 $107.53 $135.19 $242.72 3193 08/26/26 255 2017 John Deere Bush Hoq #2SS 0 $0.00 $0.00 $59.96 $50.62 $110.58 3194 08/27/26 256 2017 Ford F-550 #256 53,917 M $0.00 $0.00 $74.95 $226.16 $301.11 3195 08/31/26 414 2021 Chevy Tahoe # 414 103,317 M $0.00 $0.00 $21.51 $18.50 $40.01 3196 08/24/26 265 2022 Kubota #265 500 H $0.00 $0.00 $74.95 $207.57 $282.52 3197 08/24/26 277 Street Dept Dump Trucj Unit# 277 8,261 M $0.00 $0.00 $21.51 $18.50 $40.01 3198 08/26/26 279 Street Department unit# 279 56 M $0.00 $0.00 $59.96 $185.69 $245.65 3199 08/25/26 331 2013 Chevy Ambulance #331 78,411 M $0.00 $0.00 $43.01 $0.00 $43.01 3200 08/27/26 351 2024 Ford Expedition #351 79,716 M $0.00 $0.00 $43.02 $262.90 $305.92 3201 08/17/26 352 2023 Dodqe Ram 4500 Ambulance 18,382 M $0.00 $0.00 $21.51 $171.00 $192.51 3202 08/17/26 352 2023 Dodqe Ram 4500 Ambulance 18,382 M $0.00 $0.00 $21.51 $2,150.48 $2,171.99 3203 08/27/26 401 2020 Chevy Tahoe #401 76,528 M $0.00 $0.00 $29.98 $124.98 $154.96 3204 08/26/26 402 2020 Chevy Tahoe #402 107,886 M $0.00 $0.00 $89.94 $267.21 $357.15 3206 08/25/26 403 Police Dept Traffic Unit# 403 7,943 M $0.00 $0.00 $21.51 $0.00 $21.51 3207 08/24/26 406 2020 Chevy Tahoe #406 4,828 M $0.00 $0.00 $21.51 $30.78 $52.29 3208 08/27/26 416 2021 Chevy Tahoe #416 4,480 M $0.00 $0.00 $21.51 $18.50 $40.01 3209 08/27/26 417 2021 Chevy Tahoe #417 61,941 M $0.00 $0.00 $21.51 $18.50 $40.01 3210 08/31/26 420 2022 Chevy Tahoe #420 31,723 M $0.00 $0.00 $14.99 $33.25 $48.24 3211 08/26/26 421 2022 Chevy Tahoe #421 37,524 M $0.00 $0.00 $29.98 $33.25 $63.23 3212 08/26/26 440 2024 Checvrolet Tahoe #440 32,582 M $0.00 $0.00 $43.02 $65.23 $108.25 3213 08/25/26 460 2016 Chevy Tahoe #460 123,476 M $0.00 $0.00 $104.93 $397.23 $502.16 3214 08/28/26 464 2016 Chevy Tahoe #464 134,177 M $0.00 $0.00 $86.02 $123.69 $209.71 3215 08/24/26 482 2018 Chevy Tahoe #482 50,091 M $0.00 $0.00 $74.95 $473.35 $548.30 3216 08/25/26 481 2018 Chevy Tahoe #481 72,595 M $0.00 $0.00 $129.04 $133.23 $262.27 3217 08/25/26 487 2018 Chevy Tahoe #487 50,199 M $0.00 $0.00 $44.97 $0.00 $44.97 3218 08/25/26 498 2013 Chevy Tahoe #498 126,651 M $0.00 $0.00 $43.01 $0.00 $43.01 3219 08/24/26 700 2009 Chevy 3/4 Ton #700 99,351 M $0.00 $0.00 $44.97 $26.54 $71.51 September 15, 2026 3 City of Humble Reporting Dates 08/01 /2026 08/31 /2026 Fleet Maintenance Work Order Equipment Summary Grouped By EquipmentNehicle Code WO # Date Equipment Code / Name Odometer Out Side Labor Parts Labor In House Parts Total Cost 3220 08/31/26 1308 2015 Chevy Silverado #248 86,345 M $0.00 $0.00 $21.51 $18.50 $40.01 3221 08/24/26 2062 2023 Kubota U35-4R1 Excavator 354 M $0.00 $0.00 $59.96 $114.57 $174.53 3222 08/25/26 240 2013 Bobcat #240 746 H $0.00 $0.00 $59.96 $108.42 $168.38 3223 08/28/26 259 2018 John Deere #259 930 H $0.00 $0.00 $149.90 $304.29 $454.19 3224 08/27/26 263 2022 International Sweeper 30,320 H $0.00 $0.00 $215.05 $20.75 $235.80 3225 08/12/26 207 2007 Chevy Dump Truck #207 27,036 M $0.00 $0.00 $44.97 $2,243.71 $2,288.68 3226 08/17/26 355 Fire/EMS unit# 355 12,243 M $0.00 $0.00 $14.99 $13.99 $28.98 112 84 $0.00 $0.00 $5,532.29 $29,597.79 $35,130.08 112 Units Listed: 84 $0.00 $0.00 $5,532.29 $29,597.79 $35,130.08 Labor Parts Total Cost / Unit: 84 $65.86 $352.35 $418.22 Cost / WO: 112 $49.40 $264.27 $313.66 September 15, 2026 4