HomeMy WebLinkAbout2026 07 Public Works Monthly ReportProject Description
City of Houston
Inter-Connect #2
This project provides a 2 nd connection to the City of Houston Water System to obtain surface
water from the City of Houston as pmt of the ground water reduction plan. This will bring
surface water from the City of Houston along Rankin Road into the Well# 6 water plant site.
This project consists of approximately 3700 linear feet of20" water line. The project also
included the installation of the 20" water line under US 59 and the Union Pacific Rail Road.
Engineers -ARKK Engineers
Contractor -ISJ Underground Utilities, LLC
Status
For the month of July contractors installed 130 ft of water pipe and pressure tested the City
of Houston end.