HomeMy WebLinkAbout2026 05 Public Works Monthly ReportsCITY OF HUMBLE PUBLIC WORKS DEPARTMENT MONTHLY REPORT MAY 2026 MARK K. ARNOLD DIRECTOR OF PUBLIC WORKS CITY OF HUMBLE MAY 2026 MONTHLY GASOLINE REPORT CITY OF HUMBLE MONTHLY GASOLINE REPORT May-26 DEPARTMENT UNLEADED DIESEL 11 TOTAL UNLEADED DIESEL ADMINISTRATION 0 0 0 0.00% 0.00% STREET 732.4 234.6 967 6.35% 16.44% FIRE I EMS 397.8 1,106.30 1504.1 3.45% 77.54% POLICE 6675.8 0 6675.8 57.86% 0.00% TRAFFIC CONTROL 771.9 0 771.9 6.69% 0.00% PARK 507.4 0 507.4 4.40% 0.00% ANIMAL CONTROL 63.4 0 63.4 0.55% 0.00% INSPECTIONS 313.2 0 313.2 2.71% 0.00% VEH MAINT 92.5 0 92.5 0.80% 0.00% FIRE MARSHAL 583.9 0 583.9 5.06% 0.00% BLD MAINT 212.6 0 212.6 1.84% 0.00% WATER 528.1 66.7 594.8 4.58% 4.67% SEWER 334.5 19.2 353.7 2.90% 1.35% SENIOR ACTIVITY 125.3 0 125.3 1.09% 0.00% CIVIC CENTER 199.1 0 199.1 1.73% 0.00% TOTAL 11537.9 1426.8 12964.7 100.00% 100.00% PUBLIC WORKS DEPARTMENT MAY 2026 OVERTIME / COMPTIME MONTHLY REPORT Monthly Overtime / Comptime Report City of Humble Public Works Department Water & Wastewater Treatment Employee On -Call Time Total O.T. Total Comp Jason Campbell 15 10 2 Kyle Elliott 0 6 0 Steve Filmore 30 28 0 Tommy Hosler 0 0 0 Louis Johnson 22.5 20 0 Matt Watters 15 10 0 Total: 82.5 74 2 Water & Wastewater Distribution Employee On -Call Time Total O.T. Total Comp Billy Baucom 15 3 0 Mason Bradshaw 1.5 0.5 0 Zach Bullard 4.5 6.5 0 Angel Cuellar 15 5.5 0 Ray Flores 0 0 0 Kevin Gunn 15 4 0 Gordon Meadows 0 2.5 0 Colby Parker 30 2.5 0 Mike Richard 1.5 26 0 Brandon Wehunt 0 0.5 0 Total: 82.5 51 0 Street Department Employee On -Call Time Total O.T. Total Comp Vincent Allen 0 0 0 Chase Anderson 15 9 0 Isaias Cardona 15 3 0 Shane Gunn 15 24 0 Jack Lemoine 0 0 0 Armando Salazar 15 0 0 Jarred Thomas 0 4 0 Joel Villa 0 0 0 David Wehunt 22.5 9 0 Total: 82.5 49 0 Vehicle Maintenance Employee On -Call Time Total O.T. Total Comp Frank Alexander 0 0 0 Ryan Killion 0 0 0 Bill Neeley 0 0 0 Total: 0 0 0 Building Maintenance Employee On -Call Time Total O.T. Total Comp Fred Hawkins 0 0 0 George McCaa 0 8 0 Brett Nielsen 0 0 0 Alex Guerra 0 8 8 Total: 0 16 8 PUBLIC WORKS DEPARTMENT MAY 2026 MONTHLY PROJECT REPORTS TABLE OF CONTENTS Project Summary page 2 Special Projects Northshire LS upgrades and New Force Main & Gravity Line page 3 City of Houston Inter -Connect #2 page 4 South Houston Ave Road Widening & Reconstruction Project page 5 Sanitary Sewer Rehabilitation Phase 6 Project page 6 Meeks and Manning Road Paving and Drainage Improvement Project page 7 McDugald, Sharon Dr., and Carolyn Ct. Road Reconstruction Project page 8 16" Water line from Well 6 to Well 9 page 9 2025 Traffic Signal Equipment Upgrades Project page 10 North Houston and Charles St Water line Improvements page 11 Project Summary Project Engineer Contractor Cost Dates Northshire LS upgrades, $ 10,473,257.40 Con. New Force Main & RPS — Klotz & V&S $ 1,040,830.00 Eng. Construction 60% complete $ 11,514,087.40 Gravity Line Associates Construction City of Houston ISJ Underground $ 273,550.00 Eng. Construction 60% complete ARKK Utilities, LLC $ 2,353,060.00 Const. $ 2,626,610.00 Inter -Connect #2 Engineers South Houston Ave Road ARKK $ 1,132,360.00 Widening & Engineers Design & Construction Engineering 90% complete Reconstruction Project Services Cost Sanitary Sewer ARKK King Solution $ 176,250.00 Eng. Construction 95% complete Rehabilitation Phase 6 Engineers Services, LLC $ 1,069,785.00 Const. $ 1,246,035.00 Project Project to be completed in June Meeks and Manning Road ARKK $ 241,750.00 Paving and Drainage Engineers Design & Construction Engineering 80% complete Improvement Project Services Cost McDugald, Sharon Dr., ARKK $ 369,500.00 Eng. and Carolyn Ct. Road Engineers Ballast Point $ 2,904,918.00 Const Construction 70% complete $ 3,274,418.00 Reconstruction Project 16" Water line from ARKK $ 178,000.00 Bid awarded to Well 6 to Well 9 Engineers Design & Construction ISJ Underground Services Cost Construction to begin in July 2025 Traffic Signal ARKK Larry Young $ 69,800.00 Eng. Equipment Upgrades Engineers Paving $ 314,960.00 Const. Construction 95% complete $ 384,760.00 Project North Houston and ARKK $ 190,250.00 Eng. Survey is ongoing Charles St. water line Engineers Improvement Under Construction $ 19,045910.40 Under Design $ 1,742,360.00 Total $ 20,778,270.40 Northshire LS Upgrade, New Force Main, New Gravity Sewer Line Pro*ect Description - This project includes Wastewater System Improvements for providing sewer service for anticipated growth in the northwest area of Humble around West Townsen. It includes the upgrades to the Northshire Lift Station including electrical work and new piping and valves, construction of approximately 10,000 linear feet of 16" force main, 5,600 linear feet of 24" gravity sewer line, and replacement of 2,300 linear feet of 27" gravity sanitary sewer line. The improvements also include replacing the siphon that crosses Garner's Bayou into the Wastewater Plant Engineers — RPS — Klotz Associate, Inc. Contractor — V&S Construction Status — In May, contractors installed 1,391 linear ft of 27" gravity sewer, installed 6 gravity manholes, 185 linear ft of 18" C-900 sewer pipe, 620 linear ft of 18" C-900 Serda loc pipe, 580 linear ft of 30" casing, 1 18' plug valve. Citv of Houston Inter -Connect #2 Proiect Description - This project provides a 2"d connection to the City of Houston Water System to obtain surface water from the City of Houston as part of the ground water reduction plan. This will bring surface water from the City of Houston along Rankin Road into the Well # 6 water plant site. This project consists of approximately 3700 linear feet of 20" water line. The project also included the installation of the 20" water line under US 59 and the Union Pacific Rail Road. Engineers — ARKK Engineers Contractor —1SJ Underground Utilities, LLC Status — During the month of May - Contractors installed 340 feet of 20-inch C-900 water pipe, 355 feet of 12-inch C-900 water pipe and made a 12" wet connection to existing 12" water line at Well 6. They also installed 360 feet of 36" steel casing along with 360 feet of 20" water line inside of casing, under the railroad tracks at Rankin Rd. South Houston Road Widening & Reconstruction Proiect Project Description - Project involves improvements to widen the existing 2-lane asphalt roadway to a 3-lane concrete curb and gutter roadway. Drainage improvements include installation of underground storm sewers, inlets and ditch regrading. It also includes a new traffic signal system. Engineers — ARKK Engineers Contractor — Status — Engineering 90% complete Coordinating with Centerpoint and private utilities for relocation of utilities. Sanitary Sewer Rehabilitation Phase 6 Project Project Description - Project involves replacement and rehabilitation of several deteriorated sanitary sewer line segments throughout the City. Engineers — ARKK Engineers Contractor — King Solution Services, LLC Status — During the month of May, King Solutions completed the following: Installed 1 4-inch service connection, 2 6-inch service connections, 1 4-foot diameter precast sanitary manholes, 1 obstruction removals, 1 point repair and 108 linear feet of CIPP. Meeks and Manning Road Paving and Drainage Improvement Project Project Description - Project involves milling and overlaying the existing asphalt streets and regrading and installing roadside drainage culverts, new water line and fire hydrants along Meeks Road. Engineers — ARKK Engineers Contractor — Status — Engineering 80% complete McDugald, Sharon Dr., and Carolyn Ct. Road Reconstruction Proiect Project Description - Project consists of replacing the existing asphalt streets with concrete curb and gutter streets, and will include replacing the water line and fire hydrants along McDugald. Engineers — ARKK Engineers Contractor — Ballast Point Status — For the month of May Ballast Point Construction has installed 95% of the storm line and drain inlets on McDugald from Wilson to Sharon. Concrete paving has been completed for McDugald from Sharon to Wilson. Sharon paving is 75% complete. 90% of the driveways have been completed on McDugald and 75% on Sharon. Sidewalks are 90% complete throughout the project. Contractor has started dressing up the areas, but still have water taps, sprinklers and French drains to put in place. The following work was completed on the sanitary sewer and water lines: 1" Short Services 10 ea. 1" Long Services 8 ea. 6' extra length Sewer Services 26 linear ft. 4' Pre -cast Manhole 1 ea. 8" SDR 26 Sewer Pipe 363 linear ft. 16 inch Water line from Well 6 to Well 9 Project Description - Project will provide a 16" surface water line to connect Well 6 (Rankin Rd) to the ground storage tank and booster pumps at Well 9 (Carpenter Rd). This will allow the surface water to be provided from 3 of the City's well sites Engineers — ARKK Engineers Contractor — Status — Contract awarded to ISJ Underground Utilities, LLC 2025 Traffic Signal Equipment Upizrades Project Proiect Description - As part of the City's on -going traffic signal maintenance, City staff has identified three (3) existing signalized intersections with outdated and deteriorating equipment in need of replacement and upgrades. The intersections included with this project are: • S Houston Avenue at Isaacks Road • N Houston Avenue at Townsen Blvd • W Townsen Blvd at Walmart entrance drive Engineers — ARKK Engineers Contractor — Larry Young Paving Status — For the month of May Larry Young Paving has installed all the new traffic control boxes at Houston and Isaacks, Houston and Townsen and Townsen and Walmart, everything is up and running as it should be. We will be upgrading the Ped-Xing buttons later this month at Isaacks and Houston. North Houston and Charles St. Water line Improvements Project Description - Engineers — ARKK Engineers Contractor — Status — Survey is ongoing. WATER DEPARTMENT MAY 2026 MONTHLY REPORT TCEQ MONTHLY REPORT SEND REPORT TO: TCEQ Water Works Operation for P.O. BOX 13087 Ground Water Supplies Austin, Tx. 78711-3087 (1) Name of System: (1a) System I.D. No CITY OF HUMBLE County: 1010014 Month of: HARRIS Mav-26 PUMPAGE TO DISTRIBUTION SYSTEM IN THOUSAND GALS. (6) PURCHASED (7) SOLD Day (2) DIRECT (3) FROM GND. (4) TOTAL (5) DISINFECTION FROM C/O TO C/O FROM WELLS STORAGE PUMPAGE C12 Lbs. NH3N Gal. HOUSTON HOUSTON 1 36 998 2966 40 7.3 1932 18 2 173 898 2537 39 8.5 1466 25 3 216 922 2677 37 7.2 1539 2 4 256 2300 4137 96 20.5 1581 1 5 76 810 2833 28 7.1 1947 1 6 346 1030 2878 41 10.5 1502 2 7 365 929 2772 46 11.4 1478 1 8 99 974 2682 37 9.7 1609 1 9 287 1153 3018 51 11.1 1578 1 10 332 1064 2892 46 11.3 1496 106 11 0 977 2808 38 7.4 1831 94 12 439 1678 3543 77 16.2 1426 100 13 452 1102 2974 57 12.6 1420 84 14 241 1113 3063 47 10.4 1709 91 15 256 1245 3247 42 11.9 1746 97 16 318 1135 3163 45 15.8 1710 97 17 80 1112 2988 45 12.7 1796 92 18 138 1026 2960 43 9 1796 64 19 126 1100 3031 44 11.4 1805 250 20 293 1019 3047 48 9.6 1735 98 21 247 838 2880 40 9 1795 92 22 221 1259 3243 46 9.9 1763 129 23 215 998 2815 42 9.1 1602 68 24 330 1096 2820 55 11 1394 128 25 218 921 2939 39 9.1 1800 122 26 244 1102 3201 86 24 1855 97 27 249 1126 3161 52 9.9 1786 102 28 299 1061 2858 44 11.6 1498 115 29 303 627 2590 31 6.8 1660 68 30 302 1321 3026 57 11.41 1403 131 31 393 1179 3110 54 12.21 1538 81 TOTAL 7550 34113 92859 1493 345.6 51196 2358 AVG. 244 1100 2995 48 11 1651 76 MAX. 452 2300 4137 96 24 1947 250 MIN. 0 627 2537 28 6.8 1394 1 (10) No. of active water services: 4233 (11) Chemical analysis: May-26 (12) Dates and results of distribution bacteriological analyses 15 Samples, 15 Good Samples. (13) Dates and results of raw unchlorinated well water samples: (14) Reservoirs or tanks cleaned: None (15) Dead ends flush: 05/05/26 (16) Over -flow Site / Amount. Well # 6 - G.S.T 0,000 Gal. (17) Submitted by / Cert.#: THOMAS E. HOSLER WG0016273 (18) Total Monthly Combined Over -flows City of Humble Water Pumpage Report 2026 azol Month Total Monthly Pumpage Total Well Pumpage Total City of Houston Peak Daily Pumpage Low Daily Pumpage Average Daily Pumpage Total Monthly Connections January 87,510 35,750 51,760 3,488 2,347 2,823 4,216 February 76,169 31,975 44,194 2,997 2,419 2,720 4,211 March 94,507 43,516 50,991 6,172 2,276 3,049 4,218 April 84,568 28,985 55,583 3,317 2,368 2,819 4,212 May 92,859 41,663 51,196 4,137 2,537 2,995 4,233 June July August September October November December 4,201 Total 435,613 181,889 253,724 20,111 11,947 14,406 32 Maximum 94,507 43,516 55,583 6,172 2,537 3,049 Minimum 76,169 28,985 44,194 2,997 2,276 2,720 Average 87,123 36,378 50,745 4,022 2,389 2,881 Difference Between Water Billed and Water Pumped Total METERED DIFF VS PUMP Percent Loss Percent Metered 75,658 11,852 13.54% 86.46% 47,385 28,784 37.79% 62.21% 78,636 15,871 16.79% 83.21% 77,187 7,381 8.73% 91.27% WASTEWATER DEPARTMENT MAY 2026 MONTHLY REPORT EPA - I X0034401 City of Humble TCEQ - 0010763-002 Southwest Wastewater Treatment Facility Month. Mav 2026 Date i Temp. Rain Flow Meter Total Flow Effluent Sample Flow Non Potable Water Beltpress Water Bleach LROPM 14,509,033 C80D T.S.S. NH3N EColi pH DO Temp. 1 -May 77.6 1.58 14,432,453 2,664,000 1 6.15 132,617 33,681 1.3 2-Ma 70.5 1.9 14,439,160 6,707,000 3.65 1 96,935 1 0.4 3-May 71.2 14,441,881 2,721,000 2.11 93,836 0 0.2 4-May 72.8 14,444,058 2,177,000 2.06 101.483 0 0.4 5-May 83.5 14,446,244 2,186,000 1.95 137,197 35,078 1.1 6-May 84.9 14,448,446 2,202,000 8.45 26.5 2.05 135,378 37,634 1.6 7-May 78.1 14,450,603 2,157,000 1 7.47 8.56 26.3 2.28 129,066 30,998 1 8-May 80.1 14,452,656 2.053,000 1.49 130,553 34,500 1 9-May 83.8 0.29 14,454,795 2,1391000 2.79 99,884 0 0 10-May 84.3 14,457,037 2,242,000 2.19 96,204 0 0 11 -May 80.4 0.69 14,459,498 2,461,000 3.16 96,992 0 0 12-May 78.5 14,461,899 2,401,000 1.65 135,606 35,029 0 13-May 79.5 14.464,099 2,200,000 8.46 27 1 2.29 135,301 33,923 0 14-May 80.2 14,466,239 2,140,000 7.42 8.45 27.4 2.22 98,880 1 0 15-May 81.2 14,468,391 2,152,000 1.87 131,549 34,307 0 16-May 83.3 14,470,721 2,330,000 2.01 112,034 0 4.9 17-May 87.3 14,472,843 2,122,000 _1 1.88 103,653 0 0 18-May 87.5 14,474,760 1,917,000 2.09 94,383 0 0.9 19-May 87.1 14,476,979 2,219,000 2.14 137,837 34,219 3.3 20-May 80.6 0.94 14,479,387 2,408,000 7.58 27.9 6.06 149,644 30,723 2.2 21 -May 82 0.19 14,482,670 3,283,000 7.35 8.23 27 1 2.36 112,539 29,417 2.3 22-May 81.4 14,484,929 2,259,000 2.13 136,067 31,634 2.2 23-May 80A 0.22 14,487,141 2,212,000 2.47 113,013 4 1.3 24-May 79.4 1.51 14,491 780 4,63 ,000 1 3.12 115,382 0 1.3 25-May 82.8 14,494,342 2, 62,000 1.75 1 114,233 0 2 26-May 82.7 14,496,601 2,259,000 2.5 114,737 44 1.7 27-May 79.3 0.81 14,499,222 2,621,000 7.36 28 2.29 148,537 32,134 2.4 28-May 80.1 0.04 14,502,146 2,924,000 7.3 8.29 27.1 2.69 151,586 35,187 2.4 29-May 83.2 14,504,539 2,393,000 1.99 144,709 32,477 2.4 30-May 83.6 14,506,847 2,308,000 2,64 112,626 0 1.4 31 -May 84.1 14,509,033 12,186,000 2.25 111,045 0 1.3 - Total 2511.4 8.17 79.244,000 29.54 65.38 217.2 78.28 3,723,506 500,991 39 Avg 81 0 2,556,258 7.39 8.17 27 3 1 120,113 16,161 1.26 Min. 70.5 0.04 1,917,000 7.30 7.36 26.3 1.49 1 93,836 0 0 Max. 87.5 1.9 6,707,000 7.47 8.56 1 28 6.15 1 151,586 1 37,634 1 4.9 City of Humble Wastewater Pumpage Report 2026 Month Total Monthly Treated Peak Daily Treated Low Daily Treated Average Daily Treated January 63,743 3,040 1,665 2,056 February 57,820 3,108 1,780 2,065 March 67,938 4,154 1,758 2,191 April 73,122 4,677 1,871 2,437 May 79,244 6,707 1,917 2,556 June July August September October November December Total 341,867 21,686 8,991 11,305 Maximum 79,244 6,707 1,917 2,556 Minimum 57,820 3,040 1,665 2,056 Average 68,373 4,337 1,798 2,261 Difference Between Water Pumped vs. Wastewater Treated Total Water Pumped Wastewater Treated Pumped vs. Treated Percent Treated 87,510 63,743 23,767 72.84% 76,169 57,820 18,349 75.91% 94,507 67,938 26,569 71.89% 84,568 73,122 11,446 86.47% 92,859 79,244 13,615 85.34% 435,613 341,867 93,746 78.48% STREET DEPARTMENT MAY 2026 MONTHLY REPORT Street Department Work Orders Date Employee Location Task 5/26/2026 Wehunt David FM 1960 Bypass Lift Station Lift Pump Maint & Repairs LS 5/26/2026 Wehunt David Spears Village Lift Station Lift Pump Maint & Repairs LS 5/26/2026 Wehunt David Southwest WasteWater Treatment Plz Sand Filter Maint & Repairs 5/26/2026 Allen Vince 401-515 S BENDER AVE Replace downed / missing sign 5/21/2026 Allen Vince City Wide Clean drain inlet 5/21/2026 Anderson Chase City Wide Clean drain inlet 5/21/2026 Villa Joel City Wide Clean drain inlet 5/21/2026 Wehunt David City Wide Clean drain inlet 5/21/2026 Gunn Shane City Wide Clean drain inlet 5/21/2026 Salazar Armando City Wide Clean drain inlet 5/21/2026 Isaias Cardona City Wide Clean drain inlet 5/21/2026 Salazar Armando N Houston Ave 1000-1199 Patch pothole 5/21/2026 Gunn Shane N Houston Ave 1000-1199 Patch pothole 5/21/2026 Gunn Shane Townsen Blvd W 20700-20799 Patch pothole 5/21/2026 Salazar Armando Townsen Blvd W 20700-20799 Patch pothole 5/21/2026 Gunn Shane N Bender Ave 200-299 Patch pothole 5/21/2026 Salazar Armando N Bender Ave 200-299 Patch pothole 5/20/2026 Isaias Cardona City Wide Clean drain inlet 5/20/2026 Allen Vince City Wide Clean drain inlet 5/20/2026 Anderson Chase City Wide Clean drain inlet 5/20/2026 ISAIS CARDONA City Wide Clean drain inlet 5/20/2026 Wehunt David City Wide Clean drain inlet 5/20/2026 Salazar Armando City Wide Clean drain inlet 5/20/2026 Gunn Shane City Wide Clean drain inlet 5/20/2026 Villa Joel City Wide Clean drain inlet 5/20/2026 Isaias Cardona 1962 S HOUSTON AVE Clean / remove storm debris 5/20/2026 Allen Vince 1962 S HOUSTON AVE Clean / remove storm debris 5/20/2026 Salazar Armando 611 HIGGINS ST Paving misc request 5/20/2026 Gunn Shane 611 HIGGINS ST Paving misc request 5/20/2026 Villa Joel 611 HIGGINS ST Paving misc request 5/20/2026 Isaias Cardona 611 HIGGINS ST Paving misc request 5/20/2026 ISAIS CARDONA 611 HIGGINS ST Paving misc request Street Department Work Orders 5/20/2026 Allen Vince 611 HIGGINS ST Paving misc request 5/20/2026 Anderson Chase 611 HIGGINS ST Paving misc request 5/20/2026 Wehunt David 611 HIGGINS ST Paving misc request 5/20/2026 Isaias Cardona 1962 S HOUSTON AVE Clean / remove storm debris 5/20/2026 Allen Vince 1962 S HOUSTON AVE Clean / remove storm debris 5/19/2026 Villa Joel City Wide Clean drain inlet 5/19/2026 Allen Vince City Wide Clean drain inlet 5/19/2026 Wehunt David City Wide Clean drain inlet 5/19/2026 Gunn Shane City Wide Clean drain inlet 5/19/2026 Isaias Cardona City Wide Clean drain inlet 5/19/2026 ISAIS CARDONA City Wide Clean drain inlet 5/19/2026 Salazar Armando City Wide Clean drain inlet 5/19/2026 Anderson Chase City Wide Clean drain inlet 5/18/2026 Isaias Cardona City Wide Mow / weedeat ROW 5/18/2026 Wehunt David City Wide Mow / weedeat ROW 5/18/2026 ISAIS CARDONA City Wide Mow / weedeat ROW 5/18/2026 Villa Joel City Wide Mow / weedeat ROW 5/18/2026 Allen Vince City Wide Mow / weedeat ROW 5/18/2026 Gunn Shane City Wide Mow / weedeat ROW 5/18/2026 Anderson Chase City Wide Mow / weedeat ROW 5/18/2026 Salazar Armando City Wide Mow / weedeat ROW 5/18/2026 Allen Vince 602 LEXINGTON SQ Dead animal pickup 5/18/2026 Allen Vince 140 S HOUSTON AVE Trash / debris removal 5/14/2026 Wehunt David Townsen Blvd W 20800-20899 Remove tree/ limbs from ROW 5/14/2026 Anderson Chase Townsen Blvd W 20800-20899 Remove tree/ limbs from ROW 5/14/2026 Salazar Armando Townsen Blvd W 20800-20899 Remove tree/ limbs from ROW 5/14/2026 Villa Joel Townsen Blvd W 20800-20899 Remove tree/ limbs from ROW 5/14/2026 Wehunt David Higgins St 700-799 Replace concrete / asphalt driveway due to utility repair 5/14/2026 Anderson Chase Higgins St 700-799 Replace concrete / asphalt driveway due to utility repair 5/14/2026 Wehunt David Granberry St 100-199 Replace concrete / asphalt paving due to utility repair 5/14/2026 Anderson Chase Granberry St 100-199 Replace concrete / asphalt paving due to utility repair 5/14/2026 Anderson Chase Acapulco Village Dr 600-699 Move items 5/14/2026 ISAIS CARDONA Acapulco Village Dr 600-699 Move items Street Department Work Orders 5/14/2026 Wehunt David Acapulco Village Dr 600-699 Move items 5/13/2026 Anderson Chase Granberry St 100-199 Replace concrete / asphalt paving due to utility repair 5/13/2026 Wehunt David Granberry St 100-199 Replace concrete / asphalt paving due to utility repair 5/13/2026 ISAIS CARDONA Granberry St 100-199 Replace concrete / asphalt paving due to utility repair 5/12/2026 ISAIS CARDONA Granberry St 100-199 Replace concrete paving 5/12/2026 Anderson Chase Granberry St 100-199 Replace concrete paving 5/12/2026 Wehunt David Granberry St 100-199 Replace concrete paving 5/12/2026 ISAIS CARDONA Civic Center Repair curb exposed rebar 5/12/2026 Wehunt David Civic Center Repair curb exposed rebar 5/12/2026 Anderson Chase Civic Center Repair curb exposed rebar 5/11/2026 Allen Vince City Wide Clean drain inlet 5/11/2026 Anderson Chase City Wide Clean drain inlet 5/11/2026 Villa Joel City Wide Clean drain inlet 5/11/2026 Gunn Shane City Wide Clean drain inlet 5/11/2026 Salazar Armando City Wide Clean drain inlet 5/11/2026 Isaias Cardona City Wide Clean drain inlet 5/11/2026 Allen Vince 1215 CARPENTER RD Remove tree/ limbs from ROW 5/11/2026 ISAIS CARDONA 1215 CARPENTER RD Remove tree/ limbs from ROW 5/11/2026 Allen Vince 9824 J M NESTER ST Replace downed / missing sign post 5/11/2026 ISAIS CARDONA 9824 J M NESTER ST Replace downed / missing sign post 5/8/2026 Salazar Armando Acapulco Village Dr 600-699 Replace concrete / asphalt driveway due to utility repair 5/8/2026 Villa Joel Acapulco Village Dr 600-699 Replace concrete / asphalt driveway due to utility repair 5/8/2026 Gunn Shane Acapulco Village Dr 600-699 Replace concrete / asphalt driveway due to utility repair 5/8/2026 ISAIS CARDONA Acapulco Village Dr 600-699 Replace concrete / asphalt driveway due to utility repair 5/8/2026 Wehunt David Acapulco Village Dr 600-699 Replace concrete / asphalt driveway due to utility repair 5/8/2026 Anderson Chase Acapulco Village Dr 600-699 Replace concrete / asphalt driveway due to utility repair 5/7/2026 Wehunt David Acapulco Village Dr 600-699 Replace concrete / asphalt driveway due to utility repair 5/7/2026 Salazar Armando Acapulco Village Dr 600-699 Replace concrete / asphalt driveway due to utility repair 5/7/2026 Gunn Shane Acapulco Village Dr 600-699 Replace concrete / asphalt driveway due to utility repair 5/7/2026 ISAIS CARDONA Acapulco Village Dr 600-699 Replace concrete / asphalt driveway due to utility repair 5/7/2026 Anderson Chase Acapulco Village Dr 600-699 Replace concrete / asphalt driveway due to utility repair 5/7/2026 Villa Joel Acapulco Village Dr 600-699 Replace concrete / asphalt driveway due to utility repair 5/6/2026 Gunn Shane Acapulco Village Dr 600-699 Replace concrete / asphalt driveway due to utility repair Street Department Work Orders 5/6/2026 Anderson Chase Acapulco Village Dr 600-699 Replace concrete / asphalt driveway due to utility repair 5/6/2026 Wehunt David Acapulco Village Dr 600-699 Replace concrete / asphalt driveway due to utility repair 5/6/2026 ISAIS CARDONA Acapulco Village Dr 600-699 Replace concrete / asphalt driveway due to utility repair 5/6/2026 Salazar Armando Acapulco Village Dr 600-699 Replace concrete / asphalt driveway due to utility repair 5/6/2026 Allen Vince 270 W 1ST ST Dead animal pickup 5/6/2026 ISAIS CARDONA 2025 N HOUSTON AVE Patch pothole 5/6/2026 Allen Vince 2025 N HOUSTON AVE Patch pothole 5/6/2026 Allen Vince 7821 RANKIN RD Dead animal pickup 5/5/2026 Anderson Chase Willow St 100-199 Clean / remove storm debris 5/5/2026 ISAIS CARDONA Willow St 100-199 Clean / remove storm debris 5/5/2026 Villa Joel Willow St 100-199 Clean / remove storm debris 5/5/2026 Wehunt David Willow St 100-199 Clean / remove storm debris 5/5/2026 ISAIS CARDONA S Avenue A 300-499 Mow / weedeat ROW 5/5/2026 Villa Joel S Avenue A 300-499 Mow / weedeat ROW 5/5/2026 Anderson Chase S Avenue A 300-499 Mow / weedeat ROW 5/5/2026 Wehunt David S Avenue A 300-499 Mow / weedeat ROW 5/5/2026 Salazar Armando City Wide Clean drain inlet 5/5/2026 Isaias Cardona City Wide Clean drain inlet 5/5/2026 Allen Vince City Wide Clean drain inlet 5/5/2026 Villa Joel City Wide Clean drain inlet 5/5/2026 ISAIS CARDONA City Wide Clean drain inlet 5/5/2026 Gunn Shane City Wide Clean drain inlet 5/5/2026 Anderson Chase City Wide Clean drain inlet 5/5/2026 Villa Joel 315 4TH ST Remove dead tree / limb 5/5/2026 Allen Vince 315 4TH ST Remove dead tree / limb 5/5/2026 Gunn Shane 315 4TH ST Remove dead tree / limb 5/5/2026 Isaias Cardona 315 4TH ST Remove dead tree / limb 5/5/2026 ISAIS CARDONA 315 4TH ST Remove dead tree / limb 5/5/2026 Anderson Chase 315 4TH ST Remove dead tree / limb 5/5/2026 Salazar Armando 315 4TH ST Remove dead tree / limb 5/5/2026 Villa Joel 1018-A MEMORIAL GLEN DR Trash / debris removal 5/5/2026 Allen Vince 1018-A MEMORIAL GLEN DR Trash / debris removal 5/4/2026 Allen Vince 18000 HWY 59 Mow / weedeat ROW Street Department Work Orders 5/4/2026 Anderson Chase 18000 HWY 59 Mow / weedeat ROW 5/4/2026 Isaias Cardona 18000 HWY 59 Mow / weedeat ROW 5/4/2026 Allen Vince 211 S AVENUE F Patch pothole Dead Animals Potholes Sidewalk Tree/Limb Removal January 8 0 14 16 February 0 4 0 6 March 5 6 2 6 April 9 4 0 8 May 5 5 1 18 VEHICLE MAINTENANCE MAY 2026 MONTHLY REPORT City of Humble Reporting Dates 05/01/2026 OS/31/2026 Fleet Maintenance Work Order Equipment Summary Grouped By Equipment/Vehicle Code WO # Date Equipment Code / Name Odometer Out Side Labor Parts Labor In House Parts Total Cost 2846 05/01/26 2057 2019 Chevy Silverado #2057 39,364 M $0.00 $0.00 $44.97 $133.43 $178.40 2847 05/01/26 486 2018 Chevy Tahoe #486 102,708 M $0.00 $0.00 $14.99 $137.03 $152.02 2848 05/01/26 400 2020 Chevy Tahoe #400 56,993 M $0.00 $0.00 $21.51 $151.10 $172.61 2849 05/01/26 426 Crime Scene Unit #426 7,406 M $0.00 $0.00 $14.99 $32.58 $47.57 2850 05/08/26 496 Police Department unit* 496 10,288 M $0.00 $0.00 $107,53 $123.20 $230.73 2851 05/08/26 3039 2024 GMC Sierra 1500 8,227 M $0.00 $0.00 $14.99 $32.58 $47.57 2852 05/07/26 701 2023 GMC 2500 #701 17,318 M $0.00 $0.00 $74.95 $648.38 $723.33 2853 05/07/26 3033 2022 Chevy Silverado #3033 31,325 M $0.00 $0.00 $86.02 $221.71 $307.73 2854 05/07/26 3026 2016 Chevy Silverado #3026 89,327 M $0.00 $0.00 $29.98 $9.22 $39.20 2855 05/07/26 2056 2016 Chevy Silverado #2056 88,513 M $0.00 $0.00 $134.91 $469.02 $603.93 2856 05/07/26 332 2019 Dodqe Ram Ambulance #332 59,425 M $0.00 $0.00 $29.98 $108.30 $138.28 2857 05/06/26 489 Police Department Unit# 489 17,625 M $0.00 $0.00 $43.01 $0.00 $43.01 2858 05/06/26 457 Police Department unit# 457 10,917 M $0.00 $0.00 $86.03 $111.93 $197.96 2859 05/05/26 498 2013 Chevy Tahoe #498 124,336 M $0.00 $0.00 $172.05 $410.70 $582.75 2860 05/05/26 468 Police Department Unit# 468 6,784 M $0.00 $0.00 $14.99 $32.58 $47.57 2861 05/05/26 927 2016 Chevy Silverado #927 100,579 M $0.00 $0.00 $29.98 $87.34 $117.32 2862 05/05/26 491 Police Department unit# 491 5,957 M $0.00 $0.00 $43.02 $179.03 $222.05 2863 05/04/26 262 2020 John Deere #262 327 H $0.00 $0.00 $14.99 $3.36 $18.35 2864 05/04/26 931 2022 Chevy Silverado #931 33,465 M $0.00 $0.00 $129.03 $782.00 $911.03 2865 05/11/26 419 Police Dept. unit# 419 12,443 M $0.00 $0.00 $14.99 $32.58 $47.57 2866 05/11/26 3030 2019 Chevy Silverado #3030 35,460 M $0.00 $0.00 $21.51 $70.07 $91.58 2867 05/11/26 1234 2022 Chevy Tahoe #1234 28,454 M $0.00 $0.00 $107.54 $120.68 $228.22 2868 05/22/26 442 2024 Chevrolet Tahoe #442 21,011 M $0.00 $0.00 $14.99 $18.50 $33.49 2869 05/20/26 455 2015 Chevy Tahoe #455 84,372 M $0.00 $0.00 $14.99 $18.50 $33.49 2870 05/20/26 467 2016 Chevy Tahoe #467 181,369 M $0.00 $0.00 $14.99 $18.50 $33.49 2871 05/18/26 469 2017 Ford Expedition #469 23,828 M $0.00 $0.00 $14.99 $18.50 $33.49 2872 05/15/26 484 2018 Chvey Tahoe #484 102,433 M $0.00 $0.00 $43.01 $203.24 $246.25 2873 05/19/26 256 2017 Ford F-550 #256 52,293 M $0.00 $0.00 $29.98 $325.83 $355.81 2874 05/19/26 344 2020 Ford F-250 #344 121,466 M $0.00 $0.00 $14.99 $30.73 $45.72 2875 05/20/26 464 2016 Chevy Tahoe #464 131,607 M $0.00 $0.00 $43.01 $2.50 $45.51 2876 05/20/26 465 2016 Chevy Tahoe #465 140,356 M $0.00 $0.00 $64.53 $53.86 $118.39 2877 05/19/26 403 Police Dept Traffic Unit# 403 3,508 M $0.00 $0.00 $14.99 $3.86 $18.85 2878 05/18/26 483 Police Department unit# 483 7,848 M $0.00 $0.00 $14.99 $32.58 $47.57 2879 05/18/26 343 2019 Chevy Tahoe #343 34,980 M $0.00 $0.00 $29.98 $66.96 $96.94 2880 05/18/26 435 2023 Chevy Tahoe #435 28,484 M $0.00 $0.00 $43.01 $0.00 $43.01 June 3, 2026 City of Humble Reporting Dates 05/01 /2026 05/31 /2026 Fleet Maintenance Work Order Equipment Summary Grouped By Equipment/Vehicle Code WO # Date Equipment Code / Name Odometer Out Side Labor Parts Labor In House Parts Total Cost 2881 05/18/26 2056 2016 Chevy Silverado #2056 88,514 M $0.00 $0.00 $89.94 $1,157.58 $1,247.52 2882 05/12/26 498 2013 Chevy Tahoe #498 124,336 M $0.00 $0.00 $14.99 $17.42 $32.41 2883 05/12/26 422 2022 Chevy Tahoe #422 35,088 M $0.00 $0.00 $74.95 $681.83 $756.78 2884 05/13/26 432 2023 Chevy Tahoe #432 54,121 M $0.00 $0.00 $29.98 $71.00 $100.98 2885 05/13/26 263 2022 International Sweeper 26,348 H $0.00 $0.00 $21.51 $229.75 $251.26 2886 05/14/26 1220 2016 Chevy Silverado #1220 31,657 M $0.00 $0.00 $29.98 $174.64 $204.62 2887 05/14/26 423 2022 Chevy Tahoe #423 58,013 M $0.00 $0.00 $64.53 $36.44 $100.97 2888 05/14/26 632 2021 Ford F-350 #632 17,819 M $0.00 $0.00 $29.98 $26.14 $56.12 2889 05/14/26 409 2020 Chevy Tahoe #409 85,079 M $0.00 $0.00 $107.53 $417.88 $525.41 2890 05/15/26 464 2016 Chevy Tahoe #464 131,521 M $0.00 $0.00 $193.55 $801.10 $994.65 2891 05/15/26 485 2018 Chevy Tahoe #485 90,488 M $0.00 $0.00 $43.02 $102.65 $145.67 2892 05/22/26 458 Police Dept Partol Unit# 458 6,587 M $0.00 $0.00 $21.51 $32.58 $54.09 2893 05/22/26 332 2019 Dodqe Ram Ambulance #332 59,737 M $0.00 $0.00 $14.99 $0.00 $14.99 2894 05/21/26 489 Police Department Unit# 489 18,517 M $0.00 $0.00 $43.02 $36.44 $79.46 2895 05/26/26 444 2024 Chevy Tahoe Unit #444 29,205 M $0.00 $0.00 $14.99 $18.50 $33.49 2896 05/27/26 446 2024 Chevy Tahoe Unit #446 21,603 M $0.00 $0.00 $14.99 $146.45 $161.44 2897 05/27/26 933 Code Enforcement Unit# 933 1,022 M $0.00 $0.00 $14.99 $0.00 $14.99 2898 05/27/26 625 2018 Ford F-550 #625 43,537 M $0.00 $0.00 $14.99 $18.50 $33.49 2899 05/27/26 456 2024 Chevy Tahoe 41,255 M $0.00 $0.00 $14.99 $18.50 $33.49 2900 05/20/26 443 2024 Chevy Tahoe Unit #443 29,773 M $0.00 $0.00 $14.99 $18.50 $33.49 2901 05/28/26 476 Police Dept Detective Unit# 476 14,600 M $0.00 $0.00 $21.51 $32.58 $54.09 2902 05/28/26 498 2013 Chevy Tahoe #498 124,531 M $0.00 $0.00 $21.51 $3.86 $25.37 2903 05/28/26 445 2024 Chevy Tahoe Unit #445 11,980 M $0.00 $0.00 $14.99 $18.50 $33.49 2904 05/29/26 440 2024 Checvrolet Tahoe #440 27,081 M $0.00 $0.00 $43.02 $76.61 $119.63 2905 05/29/26 3S2 2023 Dodqe Ram 4500 Ambulance 17,100 M $0.00 $0.00 $14.99 $296.10 $311.09 2906 05/29/26 933 Code Enforcement Unit# 933 1,110 M $0.00 $0.00 $21.51 $89.99 $111.50 2907 05/19/26 344 2020 Ford F-250 #344 121,465 M $0.00 $0.00 $14.99 $0.00 $14.99 2908 05/18/26 929 2022 Chevy Silverado #929 46,889 M $0.00 $0.00 $14.99 $0.00 $14.99 2909 05/11/26 1234 2022 Chevy Tahoe #1234 28,455 M $0.00 $0.00 $14.99 $0.00 $14.99 2910 05/14/26 452 Police Department unit# 452 5,386 M $0.00 $0.00 $14.99 $0.00 $14.99 2911 05/13/26 488 Police Department unit# 488 10,274 M $0.00 $0.00 $14.99 $0.00 $14.99 2912 05/13/26 483 Police Department unit# 483 7,555 M $0.00 $0.00 $14.99 $0.00 $14.99 2913 05/07/26 496 Police Department unit# 496 10,262 M $0.00 $0.00 $14.99 $0.00 $14.99 2914 05/05/26 468 Police Department Unit# 468 2,757 M $0.00 $0.00 $14.99 $0.00 $14.99 - 2915 05/12/26 493 Police Department unit# 493 5,323 M $0.00 $0.00 $14.99 $0.00 $14.99 June 3, 2026 2 City of Humble Fleet Maintenance Work Order Equipment Summary Grouped By Equipment/Vehicle Code Reporting Dates 05/01/2026 05/31/2026 Out Side In House WO # Date Equipment Code / Name Odometer Labor Parts Labor Parts Total Cost 2916 05/12/26 457 Police Department unit# 457 11,155 M $0.00 $0.00 $14.99 $0.00 $14.99 2917 05/12/26 495 Police Department Unit# 495 12,758 M $0.00 $0.00 $14.99 $0.00 $14.99 2918 05/12/26 1231 2021 Chevy Tahoe #1231 46,488 M $0.00 $0.00 $14.99 $0.00 $14.99 2919 05/01/26 263 2022 International Sweeper 26,300 H $0.00 $0.00 $64.52 $502.00 $566.52 2920 05/01/26 346 2021 Dodqe Ram Ambulance #346 63,000 M $0.00 $0.00 $21.51 $15.01 $36.52 2921 05/20/26 442 2024 Chevrolet Tahoe #442 21,011 M $0.00 $0.00 $43.02 $435.30 $478.32 2922 05/01/26 484 2018 Chvey Tahoe #484 102,433 M $0.00 $0.00 $43.01 $6.94 $49.95 2923 05/01/26 1209 2000 Skeeter Jon Boat #1209 0 $0.00 $0.00 $21.51 $204.71 $226.22 2924 05/15/26 1221 2003 Army Truck #1221 12,900 M $0.00 $0.00 $14.99 $5,339.05 $5,354.04 2925 05/01/26 3027 2017 Ford F-550 #3027 28,000 M $0.00 $0.00 $59.96 $1,785.54 $1,845.50 2926 05/15/26 654 Parks Dept Unit# 654 350 M $0.00 $0.00 $14.99 $0.00 $14.99 2927 05/18/26 654 Parks Dept Unit# 654 500 M $0.00 $0.00 $14.99 $0.00 $14.99 2928 05/28/26 343 2019 Chevy Tahoe #343 35,099 M $0.00 $0.00 $29.98 $79.99 $109.97 83 65 $0.00 $0.00 $3,125.72 $17,582.46 $20,708.18 83 Units Listed: 65 $0.00 $0.00 $3,125.72 $17,582.46 $20,708.18 Labor Parts Total Cost / Unit: 65 $48.09 $270.50 $318.59 Cost / WO: 83 $37.66 $211.84 $249.50 June 3, 2026 3