HomeMy WebLinkAbout2026 03 Public Works Monthly ReportCITY OF HUMBLE
PUBLIC WORKS DEPARTMENT
MONTHLY REPORT
MARCH 2O26
MARK K. ARNOLD
DIRECTOR OF PUBLIC WORKS
CITY OF HUMBLE
MARCH 2026
MONTHLY GASOLINE REPORT
CITY OF HUMBLE
MONTHLY GASOLINE REPORT
March-26
DEPARTMENT UNLEADED DIESEL
TOTAL UNLEADED
DIESEL
ADMINISTRATION
35
0
35
0.29%
0.00%
STREET
717.5
391
1108.5
6.04%
26.63%
FIRE / EMS
471.3
980.1
1451.4
3.97%
66.76%
POLICE
6736.2
0
6736.2
56.69%
0.00%
TRAFFIC CONTROL
715.7
0
715.7
6.02%
0.00%
PARK
571.2
29.7
600.9
4.81%
2.02%
ANIMAL CONTROL
78
0
78
0.66%
0.00%
INSPECTIONS
318.7
0
318.7
2.68%
0.00%
VEH MAINT
86.9
0
86.9
0.73%
0.00%
FIRE MARSHAL
529.7
0
529.7
4.46%
0.00%
BLD MAINT
195.1
0
195.1
1.64%
0.00%
WATER
717.8
67.2
785
6.04%
4.58%
SEWER
368.7
0
368.7
3.10%
0.00%
SENIOR ACTIVITY
148.5
0
148.5
1.25%
0.00%
CIVIC CENTER 1
193.1
0 1
193.1 1
1.62%
0.00%
TOTAL
11883.4
17,468
13351.4 j
100.00%
100.00%
PUBLIC WORKS DEPARTMENT
MARCH 2O26
OVERTIME / COMPTIME
MONTHLY REPORT
Monthly Overtime / Comptime Report
City of Humble Public Works Department
n
fx
Employee
On -Call Time
Total O.T.
Total Comp
Jason Campbell
22.5
16
0
Kyle Elliott
0
0
0
Steve Filmore
15
23
0
Tommy Hosler
0
0
0
Louis Johnson
15
10
0
Matt Watters
15
21
0
Total:
67.5
70
0
Employee
On -Call Time
Total O.T.
Total Comp
Billy Baucom
0
9
0
Mason Bradshaw
7.5
10.5
0
Angel Cuellar
15
19.5
0
Ray Flores
0
18
0
Kevin Gunn
15
13
0
Gordon Meadows
0
8.5
0
Colby Parker
15
22
0
Mike Richard
0
50
4.5
Brandon Wehunt 1
15 1
13 1
0
Total:
67.5
163.5
4.5
Street Department
Employee
On -Call Time
Total O.T.
Total Comp
Vincent Allen
0
0
0
Chase Anderson
0
0
0
Isaias Cardona
0
0
0
Shane Gunn
15
1
0
Jack Lemoine
0
0
0
Armando Salazar
15
1
0
Jarred Thomas
0
4
0
Joel Villa
0
0
0
David Wehunt
22.5
0
0
Jason Williams
15
1
0
Total:
67.5
7
0
Employee
On -Call Time
Total O.T.
Total Comp
Frank Alexander
0
0
0
Ryan Killion
0
0
0
Bill Neeley
0
0
0
Total:
0
0
0
8oildi6Maintenance
Employee
On -Call Time
Total O.T.
Total Comp
Fred Hawkins
0
8
0
George McCaa
0
0
0
Brett Nielsen
0
0
0
Alex Guerra
0
7.5
0
Total:
0
15.5
0
PUBLIC WORKS DEPARTMENT
MARCH 2O26
MONTHLY PROJECT REPORTS
TABLE OF CONTENTS
Project Summary page 2
Special Protects
Northshire LS upgrades and New Force Main & Gravity Line page 3
City of Houston Inter -Connect #2 page 4
South Houston Ave Road Widening & Reconstruction Project page 5
Sanitary Sewer Rehabilitation Phase 6 Project page 6
Meeks and Manning Road Paving and Drainage Improvement Project page 7
McDugald, Sharon Dr., and Carolyn Ct. Road Reconstruction Project page 8
16" Water line from Well 6 to Well 9 page 9
2025 Traffic Signal Equipment Upgrades Project page 10
North Houston and Charles St Water line Improvements page 11
Project Summary
Project
Engineer
Contractor
Cost
Dates
Northshire LS upgrades,
$ 10,473,257.40 Con.
New Force Main &
RPS Klotz &
V&Sociates
$ 1,040,830.00 Eng.
Construction 20% complete
$ 11,514,087.40
Gravity Line
s
Ass
Construction
City of Houston
ARKK
ISJ Underground
$ 273,550.00 Eng.
Construction 30 /o complete
Utilities, LLC
$ 2,353,060.00 Const.
Inter -Connect #2
Engineers
$ 2,626,610.00
South Houston Ave Road
ARKK
$ 1,132,360.00
Widening &
Engineers
Design & Construction
Engineering 95% complete
Reconstruction Project
Services Cost
Sanitary Sewer
ARKK
King Solution
$ 176,250.00 Eng.
Construction 80% complete
Rehabilitation Phase 6
Engineers
Services, LLC
$ 1,069,785.00 Const.
$ 1,246,035.00
Project
Project to be completed in June
Meeks and Manning Road
ARKK
$ 241,750.00
Paving and Drainage
Engineers
Design & Construction
Engineering 75% complete
Improvement Project
Services Cost
McDugald, Sharon Dr.,
ARKK
$ 369,500.00 Eng.
and Carolyn Ct. Road
Engineers
Ballast Point
$ 2,904,918.00 Const
Construction 35% complete
$ 3,274,418.00
Reconstruction Project
16" Water line from
ARKK
$ 178,000.00
Evaluating bidders
Well 6 to Well 9
Engineers
Design & Construction
Services Cost
2025 Traffic Signal
ARKK
Lam, young
$ 69,800.00 Eng.
Equipment Upgrades
Engineers
Paving
$ 314,960.00 Const.
Construction 25% complete
$ 384,760.00
Project
North Houston and
ARKK
Engineering proposal
Charles St. water line
Engineers
coming in April
Improvement
Under Construction
$ 19,045910.40
Under Design
$ 1,552,110.00
Total
$ 20,598,020.40
Northshire LS Upgrade, New Force Main, New Gravity Sewer Line
Proiect Description -
This project includes Wastewater System Improvements for providing sewer service for
anticipated growth in the northwest area of Humble around West Townsen. It includes the
upgrades to the Northshire Lift Station including electrical work and new piping and valves,
construction of approximately 10,000 linear feet of 16" force main, 5,600 linear feet of 24" gravity
sewer line, and replacement of 2,300 linear feet of 27" gravity sanitary sewer line. The
improvements also include replacing the siphon that crosses Garner's Bayou into the Wastewater
Plant
Eneineers — RPS — Klotz Associate, Inc.
Contractor — V&S Construction
Status —
In March, contractors completed 2,632 linear feet of 18 in C-900 DR 18 sewer pipe, 1,432 linear
feet of 18" C-900 Serda loc Pipe, 1,373 linear feet 30 in casing, ARV Service Release Valves (6
ea.) and 18" Plug Valves (3 ea.).
Faw
\'
M
St
38
es
i
v
City of Houston
Inter -Connect #2
Project Description -
This project provides a 2nd connection to the City of Houston Water System to obtain surface
water from the City of Houston as part of the ground water reduction plan. This will bring
surface water from the City of Houston along Rankin Road into the Well # 6 water plant site.
This project consists of approximately 3700 linear feet of 20" water line. The project also
included the installation of the 20" water line under US 59 and the Union Pacific Rail Road.
Engineers — ARKK Engineers
Contractor — 1SJ Underground Utilities, LLC
Status —
During the month of March -
Contractors installed 1,570 feet of 20-inch C900 water pipe and 525 feet of 36-inch steel casing
from the East side of Rankin Rd to the West side of Rankin Rd under Hwy 59.
r.Y
r�
0
day
South Houston Road Widenini &
Reconstruction Project
Project Description -
Project involves improvements to widen
the existing 2-lane asphalt roadway to a
3-lane concrete curb and gutter roadway.
Drainage improvements include installation
of underground storm sewers, inlets and
ditch regrading. It also includes a new traffic
signal system.
Engineers — ARKK Engineers
Contractor —
Status —
Engineering 95% complete
Coordinating with Centerpoint and private utilities
for relocation of utilities.
Sanitary Sewer Rehabilitation Phase 6 Project
Project Description -
Project involves replacement and
rehabilitation of several deteriorated
sanitary sewer line segments throughout
the City.
Engineers — ARKK Engineers
Contractor — King Solution Services, LLC
Status —
During the month of February, King Solutions completed the following:
5,264 linear feet of 8-inch HDPE pipe bursting
Installed 60 4-inch service connections, 1 6-inch service connection,
and 1 4-feet diameter manhole
Meeks and Manning Road Paving
and Drainage Improvement Project
Project Description -
Project involves milling and overlaying
the existing asphalt streets and regrading
and installing roadside drainage culverts,
new water line and fire hydrants along
Meeks Road.
Engineers — ARKK Engineers
Contractor —
Status —
Engineering 75% complete
Awaiting meeting with Mr. Mittag
McDugald, Sharon Dr., and Carolyn Ct.
Road Reconstruction Project
Project Description -
Project consists of replacing the existing
asphalt streets with concrete curb and gutter
streets, and will include replacing the water
line and fire hydrants along McDugald.
Engineers — ARKK Engineers
Contractor — Ballast Point
Status —
For the month of March Ballast Point Construction finished pouring concrete paving and driveways on
Carolyn Ct between Ferguson and Windswept. On McDugald concrete paving is 75% complete and three
driveways were poured between Houston and Ferguson. On the second block of McDugald, South side
between Ferguson and Windswept, concrete pavement has been completed. Removal of existing
pavement on the South side of McDugald was started between Windswept and Sharon.
The following work was completed on the sanitary sewer and water lines:
380 linear feet of 8in SDR 26
3 4-foot manholes installed
9 6-inch service connections
812 linear feet of 8in C-900 DR 18
16 inch Water line from Well 6 to Well 9
Project Description -
Project will provide a 16" surface water
line to connect Well 6 (Rankin Rd)
to the ground storage tank and booster
pumps at Well 9 (Carpenter Rd). This
will allow the surface water to be
provided from 3 of the City's well sites
Engineers — ARKK Engineers
Contractor —
Status —
Engineering 100% Complete.
Bidders are being evaluated.
2025 Traffic Signal Equipment Up6rades Project
Proiect Description -
As part of the City's on -going traffic signal
maintenance, City staff has identified three (3)
existing signalized intersections with outdated
and deteriorating equipment in need of
replacement and upgrades.
The intersections included with this project are:
• S Houston Avenue at Isaacks Road
• N Houston Avenue at Townsen Blvd
• W Townsen Blvd at Walmart entrance drive
Engineers — ARKK Engineers
Contractor — Larry Young Paving
Status —
In March, Larry Young Paving completed the installation of curbed sidewalks and ramps at the
intersection of Townsen and Walmart, still waiting on control cabinets and material to complete
the signal project.
North Houston and Charles St. Water line Improvements
Project Description -
Engineers — ARKK Engineers
Contractor —
Status —
Engineering proposal coming in April
WATER DEPARTMENT
MARCH 2O26
MONTHLY REPORT
City of Humble
Water Pumpage Report 2026
4201
Month
Total Monthly
Pumpage
Total Well
Pumpage
Total City of
Houston
Peak Daily
Pumpage
Low Daily
Pumpage
Average Daily
Pumpage
Total Monthly
Connections
January
87,510
35,750
51,760
3,488
2,347
2,823
4,216
February
76,169
31,975
44,194
2,997
2,419
2,720
4,211
March
94,507
43,516
50,991
6,172
2,276
3,049
4,218
April
May
June
July
August
September
October
November
December
4,201
Total
258,186
111,241
146,945
12,657
7,042
8,592
17
Maximum
94,507
43,516
51,760
6,172
2,419
3,049
Minimum
76,169
31,975
44,194
2,997
2,276
2,347
2,720
2,864
Average
86,062
37,080
48,982
4,219
Difference Between
Water Billed and Water Pumped
Total
METERED
DIFF VS PUMP
Percent
Loss
Percent
Metered
75,658
11,852
13.54%
86.46%
47,385
28,784
37.79%
62.21%
TCEQ MONTHLY REPORT SEND REPORT TO:
Water Works Operation for
Ground Water Supplies
(1) Name of System: CITY OF HUMBLE County
(la) System I.D. No.: 1010014 Month of:
TCEQ
P.O. BOX 13087
Austin, Tx. 78711-3087
HARRIS
March-26
PUMPAGE
TO DISTRIBUTION SYSTEM IN THOUSAND GALS.
(6) PURCHASED
(7) SOLD
Day
(2) DIRECT
(3) FROM GND.
(4) TOTAL
111 (5) DISINFECTION
FROM C/O
TO C/O
FROM WELLS
STORAGE
PUMPAGE
C12 Lbs.
NH3N Gal.
HOUSTON
HOUSTON
1
468
1051
3183
53
10
1664
111
2
292
648
2446
32
31
1506
102
3
1320
1240
3018
72
20.6
458
108
4
253
950
2803
43
13.3
1600
108
5
161
968
2894
35
7.8
1765
359
6
414
1011
3156
44
10.7
1731
114
7
104
693
2276
29
6.6
1479
108
8
259
678
2783
33
6.4
1846
116
9
443
753
2942
38
9.2
1746
123
10
183
1136
3060
42
10.2
1741
111
11
226
1443
3622
60
13.5
1953
102
12
152
842
2354
43
7.9
1360
249
13
223
1158
3318
41
9.3
1937
96
14
208
898
2771
37
6.6
1665
163
15
238
814
2776
32
7.4
1724
201
16
340
757
2389
35
8.6
1292
122
17
351
1234
2901
55
11
1316
168
18
269
854
2712
35
5.9
1589
117
19
709
1194
3281
65
61.8
1378
127
20
882
1982
3503
100
22
639
118
21
538
1001
3233
40
10.7
1694
133
22
408
938
2785
47
11
1439
138
23
252
994
2717
44
9.2
1471
129
24
88
1090
3371
41
8.9
2193
96
25
183
879
2887
47
9.5
1825
175
26
188
937
3166
36
7.2
2041
220
27
189
882
2784
42
8.2
1713
108
28
546
3528
6172
147
33.4
2098
177
29
111
867
2977
35
7.61
1999
112
30
155
883
3052
34
7.9
2014
109
31
1 70
990
3175
35
6.891
2115
143
TOTAL
10223
33293
94507
1472
400.29
50991
4363
AVG.
330
1074
3049
47
13
1645
141
MAX.
1320
3528
6172
147
61.8
2193
359
MIN.
70
648
2276
29
5.9
458
96
(10) No. of active water services: 4218 (11) Chemical analysis: March-26
(12) Dates and results of distribution bacteriological analyses: 15 Samples, 15 Good Samples.
(13) Dates and results of raw unchlorinated well water samples:
(14) Reservoirs or tanks cleaned: None (15) Dead ends flush: 03/10/26
(16) Over -flow Site / Amount: G.S.T # 9 - 20,000 Gal. / Water well # 6 - 3,330.000 Gal. / Water Leak Carpenter Rd. 2,200,000 Gal.
(17) Submitted by / Cert.#: F THOMAS E. HOSLER WG0016273 1 (18) Total Monthly Combined Over -flows 5,550,000
WASTEWATER DEPARTMENT
MARCH 2O26
MONTHLY REPORT
City of Humble
Wastewater Pumpage Report 2026
Month
Total Monthly
Treated
Peak Daily
Treated
Low Daily
Treated
Average Daily
Treated
January
63,743
3,040
1,665
2,056
February
57,820
3,108
1,780
2,065
March
67,938
4,154
1,758
2,191
April
May
June
July
August
September
October
November
December
Total
189,501
10,302
5,203
6,312
Maximum
67,938
4,154
1,780
2,191
Minimum
57,820
3,040
1,665
2,056
Average
63,167
3,434
1,734
2,104
Difference Between
Water Pumped vs.
Wastewater Treated
Total
Water Pumped
Wastewater
Treated
Pumped
vs. Treated
Percent
Treated
87,510
63,743
23,767
72.84%
76,169
57,820
18,349
75.91%
94,507
67,938
26,569
71,89%
F258,186
189,501
68,685
73.40%
EPA - TX0034401 City of Humble
TCEQ - 0010763-002 Southwest Wastewater Treatment Facility
Month: March 2026
Date
Temp.
Rain
Flow Meter
Total Flow
Effluent
Sample
Flow
Non Potable
Water
Beltpress
Water
Bleach
LROPM
14,288,729
CBOD
T.S.S.
NH3N
Ecoli
pH
DO
Temp.
1-Mar
79.2
14,290,772
2,043.000
2.38
113,644
0
3
2-Mar
77.7
14,292,650
1,878,000
2.13
103,239
0
2.5
3-Mar
81.7
14,294,691
2,041,000
2.18
143,354
33,289
3.5
4-Mar
81
14,296,769
2,078,000
8.57
24.9
1.94
143,706
0
3
5-Mar
82
14,298,888
2,119,000
7.5
8.31
25.1
2.28
146,043
35,578
0.8
6-Mar
83.5
14,300,997
2,109,000
2.38
141,211
34,498
0.6
7-Mar
84.2
14,303,088
2,091,000
2.01
95,974
0
2.2
8-Mar
78.6
2.82
14,307,242
4,154,000
2.72
97,548
0
1.6
9-Mar
80.8
0.12
14,310,077
2,835,000
2.71
102,304
0
2
10-Mar
84.6
14,312,474
2,397,000
2.05
149,827
33,852
2.6
11-Mar
84.3
14,314,736
2,262,000
8.29
25.3
1.93
142,016
34,117
2.6
12-Mar
68.6
0.77
14,317,923
3,187,000
7.22
8.55
23.4
2.97
147,728
36,562
1.5
13-Mar
65
1 14,320,124
2,201,000
2.09
124,543
31,079
1.9
14-Mar
74.4
14,322,226
2,102,000
1.45
95,538
300
1.1
15-Mar
79.7
14,324,369
2,143,000
1.49
100,458
0
1.4
16-Mar
67.2
14,326,313
1,944,000
1.37
96,633
33
1
17-Mar
58.1
14,328,181
1,868,000
1.55
118,597
33,131
1
18-Mar
64.4
14,330,132
1,951,000
9.11
22.3
1.99
127,079
32,668
0.8
19-Mar
69.4
14,332,068
1,936,000
7.43
8.35
22.8
0.73
134,545
32,362
0.7
20-Mar
71.9
14,334,099
2,031,000
15:50
135,240
35,858
1.9
21-Mar
79.4
14,336,331
2,232,000
1.51
112,114
626
1.4
22-Mar
79.6
14,338,406
2,075,000
1.72
102,294
0
1.2
23-Mar
75.2
14,340,164
1,758,000
2.31
86,477
0
1
24-Mar
79.1
14,342,302
2,138,000
1
1
2.44
135,358
32,752
2.1
25-Mar
78
14,344,478
2,176,000
9.1
25.5
1.86
134,962
36,428
1.6
26-Mar
77.8
14,346,553
2,075,000
7.43
7.72
24.9
2.38
123,892
29,333
1.4
27-Mar
76.7
14,348,684
2,131,000
2.32
123,570
29,826
0
28-Mar
75.6
14,350,801
2,117,000
1.93
112,332
0
0
29-Mar
72
14,352,734
1,933,000
1.95
112,647
0
0
30-M1r
75.1
14,354,600
1,866,000
2.38
103,798
0
0.1
31-Mar
80.4
14 356.667
2.067.000
1.79
145,476
1 32.151
0
Total
2365.2
3.71
67,938.000
29.58
68.00
194.2
62.6
3.752,147
i 534,443
44.5
Avg76
1
2,191,548
7.40
8.50
24
2
121,037
17,240
1.44
Min.
58.1
0.12
1,758,000
7.22
7.72
22.3
0.73
86,477
0
0
Max.
84.6
2.82
4,154,000
7.50
9.11
25.5
2.97
149,827
36,562
3.5
STREET DEPARTMENT
MARCH 2O26
MONTHLY REPORT
Street Department Work Orders
Potholes Filled- 6 Sidewalk Repairs- 2 Tree/Limb Removal- 6 Dead Animals Picked Up- 5
Date
Employee
Location
Task
3/31/2026
Fillmore Steve
Police Department
Generator Maint & Repairs
3/31/2026
Allen Vince
Water Well #1
Remove tree/ limbs from ROW
3/31/2026
Anderson Chase
Water Well #1
Remove tree/ limbs from ROW
3/31/2026
Villa Joel
Water Well #1
Remove tree/ limbs from ROW
3/31/2026
Wehunt David
Water Well #1
Remove tree/ limbs from ROW
3/31/2026
Gunn Shane
Water Well #1
Remove tree/ limbs from ROW
3/31/2026
Salazar Armando
Water Well #1
Remove tree/ limbs from ROW
3/31/2026
Isaias Cardona
Water Well #1
Remove tree/ limbs from ROW
3/31/2026
Williams Jason
Water Well #1
Remove tree/ limbs from ROW
3/31/2026
Fillmore Steve
South McKay Lift Station
Lift Pump Maint & Repairs LS
3/31/2026
Johnson Louis
South McKay Lift Station
Lift Pump Maint & Repairs LS
3/30/2026
Salazar Armando
City Wide
Mow / weedeat ROW
3/30/2026
Isaias Cardona
City Wide
Mow / weedeat ROW
3/30/2026
Allen Vince
City Wide
Mow / weedeat ROW
3/30/2026
Anderson Chase
City Wide
Mow / weedeat ROW
3/30/2026
Villa Joel
City Wide
Mow / weedeat ROW
3/30/2026
Wehunt David
City Wide
Mow / weedeat ROW
3/30/2026
Gunn Shane
City Wide
Mow / weedeat ROW
3/26/2026
Allen Vince
City Wide
Maw / weedeat ROW
3/26/2026
Anderson Chase
City Wide
Mow / weedeat ROW
3/26/2026
Villa Joel
City Wide
Mow / weedeat ROW
3/26/2026
Wehunt David
City Wide
Mow / weedeat ROW
3/26/2026
Gunn Shane
City Wide
Mow / weedeat ROW
3/26/2026
Isaias Cardona
City Wide
Mow / weedeat ROW
3/26/2026
Williams Jason
City Wide
Mow/weedeat ROW
3/26/2026
Williams Jason
310 N BENDER AVE
Replace damaged / faded sign
3/26/2026
Anderson Chase
310 N BENDER AVE
Replace damaged / faded sign
3/26/2026
Allen Vince
310 N BENDER AVE
Replace damaged / faded sign
3/25/2026
Elliott Kyle
Southwest WasteWater Treatmei
WWTP Maint & Repairs
3/25/2026
Allen Vince
City Wide
Mow / weedeat ROW
3/25/2026
Villa Joel
City Wide
Mow / weedeat ROW
3/25/2026
Gunn Shane
City Wide
Mow / weedeat ROW
3/25/2026
Isaias Cardona
City Wide
Mow / weedeat ROW
3/25/2026
Williams Jason
City Wide
Mow / weedeat ROW
3/24/2026
Williams Jason
City Wide
Mow / weedeat ROW
3/24/2026
Allen Vince
315 HIGGINS ST
Misc sign request
3/24/2026
ISAIS CARDONA
315 HIGGINS ST
Misc sign request
3/24/2026
Williams Jason
315 HIGGINS ST
Misc sign request
3/23/2026
Allen Vince
City Wide
Mow / weedeat ROW
3/23/2026
Gunn Shane
City Wide
Mow / weedeat ROW
3/23/2026
Williams Jason
City Wide
Mow / weedeat ROW
3/23/2026
Anderson Chase
City Wide
Mow / weedeat ROW
Street Department Work Orders
3/23/2026
Salazar Armando
City Wide
Mow / weedeat ROW
3/23/2026
Wehunt David
City Wide
Mow / weedeat ROW
3/20/2026
Williams Jason
Wilson Rd 0-1205
Replace concrete / asphalt paving- base failure
3/20/2026
Villa Joel
Wilson Rd 0-1205
Replace concrete / asphalt paving- base failure
3/20/2026
Salazar Armando
Wilson Rd 0-1205
Replace concrete / asphalt paving- base failure
3/20/2026
Gunn Shane
Wilson Rd 0-1205
Replace concrete / asphalt paving- base failure
3/20/2026
Wehunt David
Wilson Rd 0-1205
Replace concrete / asphalt paving- base failure
3/20/2026
Anderson Chase
Wilson Rd 0-1205
Replace concrete / asphalt paving- base failure
3/19/2026
Elliott Kyle
Southwest WasteWater Treatmei Sand Filter Maint & Repairs
3/19/2026
Salazar Armando
S Houston Ave 1324-1599
Paving misc request
3/19/2026
Williams Jason
S Houston Ave 1324-1599
Paving misc request
3/19/2026
Wehunt David
S Houston Ave 1324-1599
Paving misc request
3/19/2026
Villa Joel
S Houston Ave 1324-1599
Paving misc request
3/19/2026
Anderson Chase
S Houston Ave 1324-1599
Paving misc request
3/19/2026
Gunn Shane
S Houston Ave 1324-1599
Paving misc request
3/19/2026
Isaias Cardona
S Houston Ave 1324-1599
Paving misc request
3/19/2026
Wehunt David
Lollipop Ln 1400-1599
Trash / debris removal
3/19/2026
Anderson Chase
Lollipop Ln 1400-1599
Trash / debris removal
3/19/2026
Isaias Cardona
Lollipop Ln 1400-1599
Trash / debris removal
3/19/2026
Williams Jason
Lollipop Ln 1400-1599
Trash / debris removal
3/18/2026
Salazar Armando
S Houston Ave 1324-1599
Paving misc request
3/18/2026
Williams Jason
S Houston Ave 1324-1599
Paving misc request
3/18/2026
Wehunt David
S Houston Ave 1324-1599
Paving misc request
3/18/2026
Gunn Shane
S Houston Ave 1324-1599
Paving misc request
3/18/2026
FiRmore Steve
South McKay Lift Station
Lift Pump Maint & Repairs LS
3/18/2026
Johnson Louis
South McKay Lift Station
Lift Pump Maint & Repairs LS
3/17/2026
Wehunt David
S Houston Ave 1324-1599
Paving misc request
3/17/2026
Villa Joel
S Houston Ave 1324-1599
Paving misc request
3/17/2026
Williams Jason
S Houston Ave 1324-1599
Paving misc request
3/17/2026
Anderson Chase
S Houston Ave 1324-1599
Paving misc request
3/17/2026
Gunn Shane
S Houston Ave 1324-1599
Paving misc request
3/17/2026
Salazar Armando
S Houston Ave 1324-1599
Paving misc request
3/17/2026
Isaias Cardona
S Houston Ave 1324-1599
Paving misc request
3/16/2026
Salazar Armando
Wilson Rd 1700-1799
Paving misc request
3/16/2026
Anderson Chase
Wilson Rd 1700-1799
Paving misc request
3/16/2026
Williams Jason
Wilson Rd 1700-1799
Paving misc request
3/16/2026
Gunn Shane
Wilson Rd 1700-1799
Paving misc request
3/16/2026
Villa Joel
Pecan Ln 1822-1899
Misc storm sewer request
3/16/2026
ISAIS CARDONA
Pecan Ln 1822-1899
Misc storm sewer request
3/16/2026
Wehunt David
Pecan Ln 1822-1899
Misc storm sewer request
3/16/2026
Williams Jason
Rankin Rd 8100-8107
Paving misc request
3/16/2026
Anderson Chase
Rankin Rd 8100-8107
Paving misc request
3/16/2026
Salazar Armando
Rankin Rd 8100-8107
Paving misc request
3/16/2026
Gunn Shane
Rankin Rd 8100-8107
Paving misc request
3/13/2026
Williams Jason
302 POND ST
Remove tree/ limbs from ROW
3/13/2026
Villa Joel
302 POND ST
Remove tree/ limbs from ROW
Street Department Work Orders
3/13/2026
Allen Vince
302 POND ST
Remove tree/ limbs from ROW
3/13/2026
Villa Joel
921 GRACE LN
Remove tree/ limbs from ROW
3/13/2026
Williams Jason
921 GRACE LN
Remove tree/ limbs from ROW
3/13/2026
Allen Vince
921 GRACE LN
Remove tree/ limbs from ROW
3/13/2026
Elliott Kyle
Southwest WasteWater Treatmei Clarifier Maint & Repairs
3/13/2026
Elliott Kyle
Southwest WasteWater Treatmei WWTP Maint & Repairs
3/13/2026
Williams Jason
200 MAIN ST
Repair/ replace flags
3/13/2026
Villa Joel
200 MAIN ST
Repair / replace flags
3/13/2026
Allen Vince
200 MAIN ST
Repair / replace flags
3/12/2026
Elliott Kyle
Southwest WasteWater Treatmer Clarifier Maint & Repairs
3/12/2026
Elliott Kyle
Southwest WasteWater Treatmei Sand Filter Maint & Repairs
3/12/2026
Allen Vince
19450 HWY 59
Dead animal pickup
3/12/2026
Isaias Cardona
19450 HWY 59
Dead animal pickup
3/12/2026
Isaias Cardona
415 E 1ST ST
Dead animal pickup
3/12/2026
Allen Vince
415 E 1ST ST
Dead animal pickup
3/12/2026
Villa Joel
8233 WILL CLAYTON PKWY
Remove dead tree / limb
3/12/2026
Allen Vince
8233 WILL CLAYTON PKWY
Remove dead tree / limb
3/12/2026
Villa Joel
City Wide
Clean drain inlet
3/12/2026
Gunn Shane
City Wide
Clean drain inlet
3/12/2026
Salazar Armando
City Wide
Clean drain inlet
3/12/2026
Allen Vince
City Wide
Clean drain inlet
3/12/2026
Isaias Cardona
City Wide
Clean drain inlet
3/12/2026
Williams Jason
City Wide
Clean drain inlet
3/12/2026
Anderson Chase
City Wide
Clean drain inlet
3/11/2026
Villa Joel
402 4TH ST
Replace damaged / faded sign
3/11/2026
Allen Vince
402 4TH ST
Replace damaged / faded sign
3/11/2026
Villa Joel
617 3RD ST
Replace damaged / faded sign
3/11/2026
Allen Vince
617 3RD ST
Replace damaged / faded sign
3/11/2026
Elliott Kyle
Southwest WasteWater Treatmer WWTP Maint & Repairs
3/11/2026
Elliott Kyle
Southwest WasteWater Treatmei WWTP Maint & Repairs
3/11/2026
Elliott Kyle
Southwest WasteWaterTreatmei WWTP Maint & Repairs
3/11/2026
Elliott Kyle
Southwest WasteWater Treatmer Clarifier Maint & Repairs
3/11/2026
Allen Vince
Lollipop Ln 1400-1599
Trash / debris removal
3/11/2026
Isaias Cardona
Lollipop Ln 1400-1599
Trash / debris removal
3/11/2026
Villa Joel
Lollipop Ln 1400-1599
Trash / debris removal
3/11/2026
Gunn Shane
Canterbury Dr 9800-9899
Trash / debris removal
3/11/2026
Salazar Armando
Canterbury Dr 9800-9899
Trash / debris removal
3/11/2026
Allen Vince
Sandra Ln 1400-1599
Trash / debris removal
3/11/2026
Villa Joel
Sandra Ln 1400-1599
Trash / debris removal
3/11/2026
Villa Joel
Nancy Ln 1000-1123
Trash / debris removal
3/11/2026
Allen Vince
Nancy Ln 1000-1123
Trash / debris removal
3/10/2026
Anderson Chase
N Bender Ave 300-399
Misc sign request
3/10/2026
Salazar Armando
N Bender Ave 300-399
Misc sign request
3/10/2026
Gunn Shane
N Bender Ave 300-399
Misc sign request
3/10/2026
ISAIS CARDONA
N Bender Ave 300-399
Misc sign request
3/10/2026
Villa Joel
N Bender Ave 300-399
Misc sign request
Street Department Work Orders
3/10/2026
Anderson Chase
Sandpiper St 2824-2835
Trim tree / limbs obstructing sight / sign
3/10/2026
Allen Vince
N Avenue E 400-499
Replace damaged / faded sign
3/10/2026
Villa Joel
N Avenue E 400-499
Replace damaged / faded sign
3/10/2026
Anderson Chase
Quail Run Dr 2600-2699
Misc sign request
3/10/2026
ISAIS CARDONA
110 ISAACKS RD
Replace damaged / faded sign
3/10/2026
Allen Vince
110 ISAACKS RD
Replace damaged / faded sign
3/10/2026
Villa Joel
2025 N HOUSTON AVE
Remove / cover graffiti
3/10/2026
Allen Vince
2025 N HOUSTON AVE
Remove / cover graffiti
3/10/2026
Gunn Shane
2025 N HOUSTON AVE
Remove / cover graffiti
3/10/2026
Villa Joel
503 N AVENUE E
Replace damaged / faded sign
3/10/2026
Allen Vince
503 N AVENUE E
Replace damaged / faded sign
3/10/2026
Allen Vince
716 4TH ST
Replace damaged / faded sign
3/10/2026
Villa Joel
716 4TH ST
Replace damaged / faded sign
3/10/2026
Villa Joel
410 HERMAN ST
Replace damaged / faded sign
3/10/2026
Allen Vince
410 HERMAN ST
Replace damaged / faded sign
3/10/2026
Villa Joel
503 4TH ST
Replace damaged / faded sign
3/10/2026
Allen Vince
503 4TH ST
Replace damaged / faded sign
3/10/2026
Allen Vince
N Avenue E 300-399
Replace damaged / faded sign
3/10/2026
Villa Joel
N Avenue E 300-399
Replace damaged / faded sign
3/10/2026
Villa Joel
703 N AVENUE F
Replace damaged / faded sign
3/10/2026
Allen Vince
703 N AVENUE F
Replace damaged / faded sign
3/10/2026
ISAIS CARDONA
305 ISAACKS RD
Replace damaged sign post
3/10/2026
Allen Vince
305 ISAACKS RD
Replace damaged sign post
3/10/2026
Allen Vince
603 2ND ST
Replace damaged / faded sign
3/10/2026
Villa Joel
603 2ND ST
Replace damaged / faded sign
3/9/2026
Wehunt David
Hirsch Memorial Park
Hang or replace signs
3/9/2026
ISAIS CARDONA
Hirsch Memorial Park
Hang or replace signs
3/9/2026
Salazar Armando
North McKay Lift Station
Dead animal pickup
3/9/2026
Gunn Shane
North McKay Lift Station
Dead animal pickup
3/9/2026
Anderson Chase
Sandpiper St 2824-2835
Remove tree/ limbs from ROW
3/9/2026
Wehunt David
Spring Creek Xing 20700-20799
Re -set traffic lights flashing red
3/9/2026
ISAIS CARDONA
Spring Creek Xing 20700-20799
Re -set traffic lights flashing red
3/6/2026
Elliott Kyle
Southwest WasteWater Treatmer
Sand Filter Maint & Repairs
3/6/2026
Villa Joel
Court House
Sidewalk misc request
3/6/2026
Allen Vince
Court House
Sidewalk misc request
3/6/2026
Williams Jason
Court House
Sidewalk misc request
3/6/2026
Wehunt David
Court House
Sidewalk misc request
3/6/2026
ISAIS CARDONA
Court House
Sidewalk misc request
3/6/2026
Williams Jason
2814 KINGFISHER DR
Dead animal pickup
3/6/2026
Allen Vince
2814 KINGFISHER DR
Dead animal pickup
3/6/2026
Allen Vince
19711 TOWNSEN BLVD W
Trash / debris removal
3/6/2026
Villa Joel
19711 TOWNSEN BLVD W
Trash / debris removal
3/6/2026
Wehunt David
19711 TOWNSEN BLVD W
Trash / debris removal
3/6/2026
ISAIS CARDONA
19711 TOWNSEN BLVD W
Trash / debris removal
3/5/2026
ISAIS CARDONA
210 E MAIN ST
Repair / replace flags
3/5/2026
Allen Vince
210 E MAIN ST
Repair / replace flags
Street Department Work Orders
3/5/2026
3/4/2026
3/4/2026
3/4/2026
3/4/2026
3/4/2026
3/4/2026
3/4/2026
3/4/2026
3/4/2026
3/4/2026
3/4/2026
3/4/2026
3/4/2026
3/4/2026
3/4/2026
3/4/2026
3/4/2026
3/4/2026
3/4/2026
3/3/2026
3/3/2026
3/2/2026
3/2/2026
3/2/2026
3/2/2026
Villa Joel
Salazar Armando
Gunn Shane
Allen Vince
Williams Jason
Allen Vince
ISAIS CARDONA
Williams Jason
Williams Jason
Isaias Cardona
Allen Vince
ISAIS CARDONA
Anderson Chase
Wehunt David
Williams Jason
Villa Joel
Allen Vince
ISAIS CARDONA
Williams Jason
Allen Vince
Gunn Shane
Salazar Armando
Salazar Armando
Gunn Shane
Gunn Shane
Salazar Armando
210EMAIN ST
Townsen Blvd E 20142-20199
Townsen Blvd E 20142-20199
311 N HOUSTON AVE
311 N HOUSTON AVE
2710-103 WILSON RD
2710-103 WILSON RD
2710-103 WILSON RD
2710-109 WILSON RD
2710-109 WILSON RD
2710-109 WILSON RD
Pecan Ln 1822-1899
Pecan Ln 1822-1899
Pecan Ln 1822-1899
Pecan Ln 1822-1899
Pecan Ln 1822-1899
2235 S HOUSTON AVE
2235 S HOUSTON AVE
2235 S HOUSTON AVE
310 N BENDER AVE
Isaacks Rd 164-199
Isaacks Rd 164-199
Townsen Blvd W 20100-20199
Townsen Blvd W 20100-20199
Townsen Blvd W 20400-20499
Townsen Blvd W 20400-20499
Repair / replace flags
Replace damaged / faded sign
Replace damaged / faded sign
Replace damaged / faded sign
Replace damaged / faded sign
Replace damaged sign post
Replace damaged sign post
Replace damaged sign post
Replace damaged / faded sign
Replace damaged / faded sign
Replace damaged / faded sign
Clean / remove storm debris
Clean / remove storm debris
Clean / remove storm debris
Clean / remove storm debris
Clean / remove storm debris
Replace damaged / faded sign
Replace damaged / faded sign
Replace damaged / faded sign
Trash / debris removal
Dead animal pickup
Dead animal pickup
Trash / debris removal
Trash / debris removal
Dead animal pickup
Dead animal pickup
VEHICLE MAINTENANCE
MARCH 2O26
MONTHLY REPORT
City of Humble Reporting Dates 03/01 /2026 03/31 /2026
Fleet Maintenance Work Order Equipment Summary
Grouped By Equipment/Vehicle Code
WO #
Date
Equipment Code / Name
Odometer
Out Side
Labor
Parts
Labor
In House
Parts
Total Cost
2645
03/10/26
401
2020 Chevy Tahoe #401
75,234
M
$0.00
$0.00
$29.98
$1 S2.37
$182.35
2646
03/10/26
469
2017 Ford Expedition #469
22,448
M
$0.00
$0.00
$104.93
$222.48
$327.41
2647
03/05/26
1307
2014 Chevy Silverado #1307
53,333
M
$0.00
$0.00
$29.98
$86.65
$116.63
2648
03/02/26
332
2019 Dodge Ram Ambulance #332
57,807
M
$0.00
$0.00
$86.02
$38.80
$124.82
2649
03/05/26
277
Street Dept Dump Trucj Unit# 277
6,466
M
$0.00
$0.00
$21.S1
$169.95
$191.46
2650
03/03/26
207
2007 Chevy Dump Truck #207
26,974
M
$0.00
$0.00
$29.98
$75.88
$105.86
2651
03/03/26
3027
2017 Ford F-550 #3027
27,265
M
$0.00
$0.00
$43.02
$7.00
$50.02
2652
03/04/26
277
Street Dept Dump Truci Unit# 277
6,445
M
$0.00
$0.00
$14.99
$33.45
$48.44
2653
03/04/26
350
2023 Ford F-250 #350
18,105
M
$0.00
$0.00
$14.99
$32.10
$47.09
2654
03/04/26
473
2017 Chevy Tahoe #473
100,709
M
$0.00
$0.00
$21.51
$18.50
$40.01
2655
03/04/26
269
2023 Scaq Turf Tiger #269
93
H
$0.00
$0.00
$44.97
$43.24
$88.21
2656
03/05/26
261
Ferris #261
486
H
$0.00
$0.00
$74.95
$189.41
$264.36
2657
03/05/26
928
2017 Chevy Silverado #928
114,365
M
$0.00
$0.00
$29.98
$37.31
$67.29
2658
03/02/26
461
Police Dept Patrol Unit #461
11,229
M
$0.00
$0.00
$36.50
$33.45
$69.95
2659
03/02/26
484
2018 Chvey Tahoe #484
99,654
M
$0.00
$0.00
$86.02
$0.00
$86.02
2660
03/02/26
486
2018 Chevy Tahoe #486
102,385
M
$0.00
$0.00
$43.01
$0.00
$43.01
2661
03/02/26
444
2024 Chevy Tahoe Unit #444
26,087
M
$0.00
$0.00
$29.98
$33.45
$63.43
2662
03/03/26
486
2018 Chevy Tahoe #486
102,439
M
$0.00
$0.00
$59.96
$41.38
$101.34
2663
03/03/26
1232
2022 Chevy Tahoe #1232
57,326
M
$0.00
$0.00
$29.98
$21.79
$51.77
2664
03/03/26
438
2023 Chevy Tahoe #438
17,265
M
$0.00
$0.00
$43.02
$0.00
$43.02
2665
03/05/26
256
2017 Ford F-550 #256
50,968
M
$0.00
$0.00
$29.98
$251.44
$281.42
2666
03/06/26
2058
2019 Ford F-550 #2058
1
M
$0.00
$0.00
$89.94
$345.10
$435.04
2667
03/05/26
252
2016 Case #252
441
H
$0.00
$0.00
$29.98
$203.00
$232.98
2668
03/16/26
3026
2016 Chevy Silverado #3026
88,874
M
$0.00
$0.00
$21.51
$18.50
$40.01
2669
03/16/26
341
2018 Chevy Tahoe #341
77,533
M
$0.00
$0.00
$21.51
$18.50
$40.01
2670
03/16/26
435
2023 Chevy Tahoe #435
26,187
M
$0.00
$0.00
$21.51
$0.00
$21.51
2671
03/16/26
446
2024 Chevy Tahoe Unit #446
18,288
M
$0.00
$0.00
$86.02
$2.50
$88.52
2672
03/16/26
460
2016 Chevy Tahoe #460
12,093
M
$0.00
$0.00
$21.51
$3.86
$25.37
2673
03/13/26
1233
2022 Chevy Tahoe #1233
43,093
M
$0.00
$0.00
$14.99
$33.45
$48.44
2674
03/13/26
2060
2022 Ford F-550 #2060
17,464
M
$0.00
$0.00
$119.92
$502.88
$622.80
2675
03/13/26
263
2022 International Sweeper
25,075
H
$0.00
$0.00
$7.50
$15.99
$23.49
2676
03/12/26
414
2021 Chevy Tahoe # 414
91,017
M
$0.00
$0.00
$21.51
$146.45
$167.96
2677
03/06/26
346
2021 Dodge Ram Ambulance #346
60,446
M
$0.00
$0.00
$14.99
$144.77
$159.76
2678
03/12/26
409
2020 Chevy Tahoe #409
84,364
M
$0.00
$0.00
$59.96
$425.55
$485.51
2679
03/12/26
417
2021 Chevy Tahoe #417
53,151
M
$0.00
$0.00
$43.01
$0.00
$43.01
April 14, 2026 1
City of Humble Reporting Dotes 03/01 /2026 03/31 /2026
Fleet Maintenance Work Order Equipment Summary
Grouped By Equipment/Vehicle Code
WO #
Date
Equipment Code / Name
Odometer
Out Side
Labor
Parts
Labor
In House
Parts
Total Cost
2680
03/11/26
438
2023 Chevy Tahoe #438
17,435
M
$0.00
$0.00
$21.51
$0.00
$21.51
2681
03/10/26
493
Police Department unit# 493
3,857
M
$0.00
$0.00
$44.97
$33.45
$78.42
2682
03/11/26
931
2022 Chevy Silverado #931
31,931
M
$0.00
$0.00
$14.99
$23.98
$38.97
2683
03/10/26
439
2023 Chevy Tahoe #439
18,357
M
$0.00
$0.00
$59.96
$71.87
$131.83
2684
03/10/26
616
2013 Chevy Silverado #616
135,584
M
$0.00
$0.00
$134.91
$309.69
$444.60
2685
03/06/26
355
Fire/EMS unit# 355
6,784
M
$0.00
$0.00
$14.99
$33.45
$48.44
2686
03/09/26
446
2024 Chevy Tahoe Unit #446
17,957
M
$0.00
$0.00
$29.98
$2.50
$32.48
2687
03/02/26
274
2009 Chevy Silverado #274
107,611
M
$0.00
$0.00
$149.90
$289.47
$439.37
2688
03/16/26
1522
2019 Mitsubishi Forklift #1522
810
H
$0.00
$0.00
$118.28
$235.05
$353.33
2689
03/05/26
341
2018 Chevy Tahoe #341
77,494
M
$0.00
$0.00
$29.98
$98.42
$128.40
2690
03/12/26
352
2023 Dodqe Ram 4500 Ambulance
15,401
M
$0.00
$0.00
$129.04
$215.74
$344.78
2691
03/16/26
931
2022 Chevy Silverado #931
32,019
M
$0.00
$0.00
$129.03
$125.48
$254.51
2692
03/17/26
2056
2016 Chevy Silverado #2056
87,593
M
$0.00
$0.00
$14.99
$18.50
$33.49
2693
03/17/26
459
2015 Chevy Tahoe #459
173,331
M
$0.00
$0.00
$14.99
$18.50
$33.49
2694
03/17/26
449
2015 Chevy Tahoe #449
93,608
M
$0.00
$0.00
$14.99
$18.50
$33.49
2695
03/17/26
439
2023 Chevy Tahoe #439
18,358
M
$0.00
$0.00
$14.99
$18.50
$33.49
2696
03/17/26
421
2022 Chevy Tahoe #421
28,439
M
$0.00
$0.00
$14.99
$18.50
$33.49
2697
03/17/26
440
2024 Checvrolet Tahoe #440
22,803
M
$0.00
$0.00
$14.99
$18.50
$33.49
2698
03/19/26
441
2024 Chevrolet Tahoe
13,711
M
$0.00
$0.00
$21.51
$18.50
$40.01
2699
03/11/26
1221
2003 Army Truck #1221
12,826
M
$0.00
$0.00
$21.51
$657.06
$678.57
2700
03/11/26
252
2016 Case #252
451
H
$0.00
$0.00
$29.98
$240.36
$270.34
2701
03/16/26
270
2023 Bobcat #270
732
H
$0.00
$0.00
$29.98
$74.99
$104.97
2702
03/19/26
346
2021 Dodge Ram Ambulance #346
60,781
M
$0.00
$0.00
$184.44
$2,282.99
$2,467.43
2703
03/19/26
401
2020 Chevy Tahoe #401
75,473
M
$0.00
$0.00
$29.98
$103.88
$133.86
2704
03/18/26
413
2011 Chevy Tahoe #413
111,377
M
$0.00
$0.00
$74.95
$96.05
$171.00
2705
03/20/26
416
2021 Chevy Tahoe #416
40,189
M
$0.00
$0.00
$43.02
$33.25
$76.27
2706
03/17/26
437
2023 Chevy Tahoe #437
32,832
M
$0.00
$0.00
$29.98
$209.41
$239.39
2707
03/23/26
437
2023 Chevy Tahoe #437
33,015
M
$0.00
$0.00
$36.50
$164.95
$201.45
2708
03/20/26
437
2023 Chevy Tahoe #437
32,295
M
$0.00
$0.00
$21.51
$0.00
$21.51
2709
03/25/26
402
2020 Chevy Tahoe #402
107,063
M
$0.00
$0.00
$107.53
$173.98
$281.51
2710
03/19/26
446
2024 Chevy Tahoe Unit #446
18,339
M
$0.00
$0.00
$129.03
$0.00
$129.03
2711
03/19/26
268
2023 Scag Turf Tiger #268
186
H
$0.00
$0.00
$44.97
$55.40
$100.37
2712
03/18/26
1104
2016 Chevy Silverado #1104
4,794
M
$0.00
$0.00
$21.51
$18.50
$40.01
2713
03/17/26
469
2017 Ford Expedition #469
22,629
M
$0.00
$0.00
$59.96
$98.66
$158.62
2714
03/17/26
457
Police Department unit# 4S7
9,044
M
$0.00
$0.00
$29.98
$0.00
$29.98
April 14, 2026 2
City of Humble Reporting Dates 03/01 /2026 03/31 /2026
Fleet Maintenance Work Order Equipment Summary
Grouped By Equipment/Vehicle Code
WO #
Date
Equipment Code / Name
Odometer
Out Side
Labor
Parts
Labor
In House
Parts
Total Cost
271S
03/23/26
464
2016 Chevy Tahoe #464
129,167
M
$0.00
$0.00
$119.92
$666.95
$786.87
2716
03/19/26
493
Police Department unit# 493
4,156
M
$0.00
$0.00
$124,S96.88
$146.45
$124,743.33
2717
03/23/26
495
Police Department Unit# 495
10,494
M
$0.00
$0.00
$59.96
$179.70
$239.66
2718
03/20/26
928
2017 Chevy Silverado #928
114,910
M
$0.00
$0.00
$74.95
$504.70
$579.65
2719
03/24/26
1511
1998 John Deere Tractor #1 S11
154,506
H
$0.00
$0.00
$104.93
$313.74
$418.67
2720
03/17/26
1523
2019 Ford Transil Bus #1523
72,462
M
$0.00
$0.00
$14.99
$0.75
$15.74
2721
03/17/26
2063
2025 GMC Sierra 1500
4,004
M
$0.00
$0.00
$14.99
$33.25
$48.24
2722
03/24/26
3030
2019 Chevy Silverado #3030
34,612
M
$0.00
$0.00
$43.01
$161.24
$204.25
2723
03/26/26
267
1998 Isuzu #267
177
H
$0.00
$0.00
$59.96
$0.00
$59.96
2724
03/25/26
435
2023 Chevy Tahoe #435
26,205
M
$0.00
$0.00
$21.51
$0.00
$21.51
2725
03/26/26
424
2022 Chevy Tahoe #424
32,016
M
$0.00
$0.00
$21.51
$18.50
$40.01
2726
03/26/26
435
2023 Chevy Tahoe #435
26,237
M
$0.00
$0.00
$21.51
$18.50
$40.01
2727
03/25/26
263
2022 International Sweeper
25,338
H
$0.00
$0.00
$14.99
$31.98
$46.97
2728
03/25/26
436
2013 Chevy Tahoe #436
112,099
M
$0.00
$0.00
$21.51
$17.42
$38.93
2729
03/25/26
1308
2015 Chevy Silverado #248
86,206
M
$0.00
$0.00
$14.99
$33.25
$48.24
2731
03/24/26
469
2017 Ford Expedition #469
22,630
M
$0.00
$0.00
$44.97
$165.99
$210.96
2732
03/27/26
280
Street dept unit# 280
53
M
$0.00
$0.00
$29.98
$30.43
$60.41
2733
03/27/26
264
2022 Ferris Mower #264
447
H
$0.00
$0.00
$104.94
$293.70
$398.64
2734
03/02/26
482
2018 Chevy Tahoe #482
47,237
M
$0.00
$0.00
$59.96
$303.58
$363.54
2735
03/25/26
455
2015 Chevy Tahoe #455
84,308
M
$0.00
$0.00
$119.92
$58.19
$178.11
2736
03/30/26
332
2019 Dodqe Ram Ambulance #332
58,336
M
$0.00
$0.00
$43.01
$592.20
$635.21
2737
03/26/26
332
2019 Dodqe Ram Ambulance #332
58,288
M
$0.00
$0.00
$59.96
$294.39
$354.35
2738
03/27/26
244
2014 Ferris Mower #244
660
H
$0.00
$0.00
$67.46
$114.15
$181.61
2739
03/30/26
931
2022 Chevy Silverado #931
32,234
M
$0.00
$0.00
$21.51
$18.50
$40.01
2740
03/25/26
486
2018 Chevy Tahoe #486
102,475
M
$0.00
$0.00
$104.93
$229.17
$334.10
2741
03/24/26
406
2020 Chevy Tahoe #406
47,706
M
$0.00
$0.00
$59.96
$43.70
$103.66
2742
03/20/26
701
2023 GMC 2500 #701
16,570
M
$0.00
$0.00
$21.51
$18.50
$40.01
2743
03/24/26
928
2017 Chevy Silverado #928
115,002
M
$0.00
$0.00
$164.89
$163.29
$328.18
2744
03/24/26
420
2022 Chevy Tahoe #420
27,120
M
$0.00
$0.00
$29.98
$150.31
$180.29
2745
03/24/26
484
2018 Chvey Tahoe #484
101,018
M
$0.00
$0.00
$14.99
$3.86
$18.85
2746
03/27/26
282
Street Dept Unit# 282
16
M
$0.00
$0.00
$29.98
$22.51
$52.49
2747
03/25/26
404
Police Dept Traffic Unit # 404
136
M
$0.00
$0.00
$43.01
$0.00
$43.01
2748
03/31/26
482
2018 Chevy Tahoe #482
47,316
M
$0.00
$0.00
$59.96
$930.70
$990.66
2749
03/31/26
420
2022 Chevy Tahoe #420
27,341
M
$0.00
$0.00
$104.93
$277.59
$382.52
2750
03/30/26
482
2018 Chevy Tahoe #482
47,296
M
$0.00
$0.00
$44.97
$95.04
$140.01
April 14, 2026 3
City of Humble
Fleet Maintenance Work Order Equipment Summary
Grouped By Equipment/Vehicle Code
WO # Date Equipment Code / Name Odometer
Reporting Dates 03/01 /2026 03/31 /2026
Out Side In House
Labor Parts Labor Parts Total Cost
2751
03/31/26
456
2024 Chevy Tahoe
37,189
M
$0.00
$0.00
$21.51
$550.00
$571.51
2752
03/31/26
331
2013 Chevy Ambulance #331
76,657
M
$0.00
$0.00
$21.51
$18.50
$40.01
2753
03/31/26
420
2022 Chevy Tahoe #420
27,332
M
$0.00
$0.00
$21.51
$18.50
$40.01
2754
03/31/26
1525
2022 Chevy Silverado #1525
50,460
M
$0.00
$0.00
$21.51
$18.50
$40.01
2755
03/13/26
466
Police Dept Admin Unit# 466
8,156
M
$0.00
$0.00
$14.99
$169.98
$184.97
2756
03/13/26
468
Police Department Unit# 468
1
M
$0.00
$0.00
$14.99
$169.98
$184.97
2757
03/05/26
256
2017 Ford F-550 #256
50,968
M
$0.00
$0.00
$43.01
$59.88
$102.89
2758
03/31/26
446
2024 Chevy Tahoe Unit #446
18,288
M
$0.00
$0.00
$43.01
$9.49
$52.50
2759
03/31/26
3033
2022 Chevy Silverado #3033
28,976
M
$0.00
$0.00
$21.51
$79.99
$101.50
114
82
$0.00
$0.00
$130,022.92
$16,154.33
$146,177.25
114
Units Listed:
82
$0.00
$0.00
$130,022.92
$16,154.33
$146,177.25
Labor
Parts
Total
Cost / Unit:
82
$1,585.65
$197.00
$1,782.65
Cost / WO:
114
$1,140.55
$141.70
$1,282.26
April 14, 2026 4