HomeMy WebLinkAbout2026 02 Public Works Monthly ReportCITY OF HUMBLE PUBLIC WORKS DEPARTMENT MONTHLY REPORT FEBRUARY 2026 MARK K. ARNOLD DIRECTOR OF PUBLIC WORKS CITY OF HUMBLE FEBRUARY 2026 MONTHLY GASOLINE REPORT CITY OF HUMBLE MONTHLY GASOLINE REPORT Feb-26 DEPARTMENT UNLEADEDI DIESEL TOTAL UNLEADED 11 DIESEL ADMINISTRATION 9.4 0 9.4 0.08% 0.00% STREET 621.5 300.8 922.3 5.87% 22.42% FIRE 1 EMS 399.7 958.8 1358.5 3.78% 71.47% POLICE 6276.7 0 6276.7 59.29% 0.00% TRAFFIC CONTROL 687.8 0 687.8 6.50% 0.00% PARK 326.4 0 326.4 3.08% 0.00% ANIMAL CONTROL 86.3 0 86.3 0.82% 0.00% INSPECTIONS 323 0 323 3.05% 0.00% VEH MAINT 67.6 0 67.6 0.64% 0.00% FIRE MARSHAL 524.1 37.3 561.4 4.95% 2.78% BLD MAINT 196 0 196 1.85% 0.00% WATER 535.8 44.7 580.5 5.06% 3.33% SEWER 233.5 0 233.5 2.21% 0.00% SENIOR ACTIVITY 115.4 0 115.4 1.09% 0.00 0 CIVIC CENTER 1 183.4 0 183.4 1 1.73% 0.00% TOTAL 10586.6 1341.6 11928.2 1 99.99% 100.00% PUBLIC WORKS DEPARTMENT FEBRUARY 2026 OVERTIME / COMPTIME MONTHLY REPORT Monthly Overtime / Comptime Report City of Humble Public Works Department Wa *s 04� rIteea;j6 Employee On -Call Time Total O.T. Total Comp Jason Campbell 7.5 9 0 Kyle Elliott 0 5 0 Steve Filmore 15 16 0 Tommy Hosler 0 0 0 Louis Johnson 30 23 0 Matt Watters 7.5 5 0 Total: 1 160 58 0 Water :Wastewater D6tribt0on Employee On -Call Time Total O.T. Total Comp Billy Baucom 15 8.5 0 Mason Bradshaw 7.5 2 0 Angel Cuellar 0 0 0 Ray Flores 15 12.5 0 Kevin Gunn 15 8 0 Gordon Meadows 0 0 3 Colby Parker 7.5 3.5 0 Mike Richard 0 34 6 Brandon Wehunt 0 10 0 Total: 60 78.5 9 Strere, tDepartment Employee On -Call Time Total O.T. Total Comp Vincent Allen 7.5 0 0 Chase Anderson 15 3 0 Isaias Cardona 0 0 0 Shane Gunn 0 1 0 Jack Lemoine 0 0 0 Armando Salazar 0 0 0 Jarred Thomas 0 5.5 0 Joel Villa 15 0 3 David Wehunt 7.5 8 0 Jason Williams 15 0 1 Total: 60 17.5 4 Employee On -Call Time Total O.T. Total Comp Frank Alexander 0 0 0 Ryan Killion 0 0 0 Bill Neeley 0 0 0 Total: 0 0 0 Building Maintenance Employee On -Call Time Total O.T. Total Comp Fred Hawkins 0 0 0 George McCaa 0 0 0 Brett Nielsen 0 0 0 Alex Guerra 0 3.5 0 Total: 0 3.5 0 PUBLIC WORKS DEPARTMENT FEBRUARY 2026 MONTHLY PROJECT REPORTS TABLE OF CONTENTS Project Summary page 2 Special Projects Northshire LS upgrades and New Force Main & Gravity Line page 3 City of Houston Inter -Connect #2 page 4 South Houston Ave Road Widening & Reconstruction Project page 5 Sanitary Sewer Rehabilitation Phase 6 Project page 6 Meeks and Manning Road Paving and Drainage Improvement Project page 7 McDugald, Sharon Dr., and Carolyn Ct. Road Reconstruction Project page 8 16" Water line from Well 6 to Well 9 page 9 2025 Traffic Signal Equipment Upgrades Project page 10 North Houston and Charles St Water line Improvements page 11 Project Summary Project Engineer Contractor Cost Dates Northshire LS upgrades, $ 10,473,257.40 Con. New Force Main & RPS Klotz & V&S $ 1,040,830.00 En2. Construction 5% complete $ 11,514,087.40 Gravity Line Associates Construction City of Houston ARKK ISJ Underground $ 273,550.00 Eng. Construction 5% complete Utilities, LLC $ 2,353,060.00 Const. Inter -Connect #2 Engineers $ 2,626,610.00 South Houston Ave Road ARKK $ 1,132,360.00 Widening & Engineers Design & Construction Engineering 90% complete Reconstruction Project Services Cost Sanitary Sewer ARKK King Solution S 176,250.00 Eng. Construction 55% complete Rehabilitation Phase 6 Engineers Services, LLC $ 1,069,785.00 Const. $ 1,246,035.00 Project Project to be completed in June Meeks and Manning Road ARKK $ 241,750.00 Paving and Drainage Engineers Design & Construction Engineering 75% complete Improvement Project Services Cost McDugald, Sharon Dr., ARKK $ 369,500.00 Eng. and Carolyn Ct. Road Engineers Ballast Point $ 2,904,918.00 Const Construction 10% complete $ 3,274,418.00 Reconstruction Project 16" Water line from ARKK $ 178,000.00 Engineering complete Well 6 to Well 9 Engineers Design & Construction Pending HCFCD permit Services Cost Out for bid in March 2025 Traffic Signal ARKK Larry Young $ 69,800.00 Eng. Equipment Upgrades Engineers Paving $ 314,960.00 Const. Construction 20% complete $ 384,760.00 Project North Houston and ARKK Engineering proposal Charles St. water line Engineers coming in March Improvement Under Construction $ 19,045910.40 Under Design $ 1,552,110.00 'rota) $ 20,598,020.40 Northshire LS Upgrade, New Force Main, New Gravity Sewer Line Project Description - This project includes Wastewater System Improvements for providing sewer service for anticipated growth in the northwest area of Humble around West Townsen. It includes the upgrades to the Northshire Lift Station including electrical work and new piping and valves, construction of approximately 10,000 linear feet of 16" force main, 5,600 linear feet of 24" gravity sewer line, and replacement of 2,300 linear feet of 27" gravity sanitary sewer line. The improvements also include replacing the siphon that crosses Garner's Bayou into the Wastewater Plant Engineers — RPS — Klotz Associate, Inc. Contractor — V&S Construction Status — During the month of February, contractor's completed 4,031 linear feet of 18 in C-900 DR 18 sewer pipe City of Houston Inter -Connect #2 Project Description - City of Houston Surface Water Inter - Connect #2 This project will bring surface water from City of Houston to City of Humble Water Well # 6 Engineers — ARKK Engineers Contractor —1SJ Underground Utilities, LLC Status — During the month of February, contractors installed 100 feet of 36 inch casing and 100 feet of 20 inch C900 water pipe. South Houston Road Widening & Reconstruction Project Project Description - Project involves improvements to widen the existing 2-lane asphalt roadway to a 3-lane concrete curb and gutter roadway. Drainage improvements include installation of underground storm sewers, inlets and ditch regrading. It also includes a new traffic signal system. Engineers — ARKK Engineers Contractor — Status — Engineering 90% complete Coordinating with Centerpoint and private utilities for relocation of utilities. Sanitary Sewer Rehabilitation Phase 6 Pro_ject Project Description - Project involves replacement and rehabilitation of several deteriorated sanitary sewer line segments throughout the City. Engineers-- ARKK Engineers Contractor — King Solution Services, LLC Status — Construction in progress During the month of February, King Solutions completed the following: 5,264 linear feet of 8-inch HDPE pipe bursting Installed 60 4-inch service connections, 1 6-inch service connection, and 1 4-feet diameter manhole Meeks and Manning Road Paving and Drainage Improvement Proiect Proiect Description - Project involves milling and overlaying the existing asphalt streets and regrading and installing roadside drainage culverts, new water line and fire hydrants along Meeks Road. Engineers-- ARKK Engineers Contractor — Status — Engineering 75% complete Awaiting meeting with Mr. Mittag McDup-ald, Sharon Dr., and Carolyn Ct. Road Reconstruction Proiect Project Description - Project consists of replacing the existing asphalt streets with concrete curb and gutter streets, and will include replacing the water line and fire hydrants along McDugald. Engineers — ARKK Engineers Contractor — Ballast Point Status — Ballast Point Construction installed all tree protection barriers on Mcdugald from Wilson to Houston, Carolyn Ct from Windswept to Ferguson and Sharon from Mcdugald to Montgomery. Removal of existing pavement, curb and gutter on East and West bound sides of Carolyn Court from Ferguson to Windswept is complete. Concrete paving on the East bound lane of Carolyn Ct from Ferguson to Windswept is complete except for the curb. On the West bound side of Mcdugald, Ballast Point removed existing pavement, curb and gutter from Houston to Ferguson and poured concrete paving from station Houston to Ferguson. Concrete paving is on hold from Houston to Ferguson pending sanitary sewer testing for the new manholes and sewer lines. Ballast Point began removing existing pavement on the East bound side of Mcdugald from Ferguson to Windswept. The following work was completed on the sanitary sewer and water lines: 3801inear feet %J Bin SDR 26 3 4-foot manholes installed 9 6-inch service connections 812 linear feet of 8in C-900 DR 18 16 inch Water line from Well 6 to Well 9 Proiect Description - Project will provide a 16" surface water line to connect Well 6 (Rankin Rd) to the ground storage tank and booster pumps at Well 9 (Carpenter Rd). This will allow the surface water to be provided from 3 of the City's well sites Engineers — ARKK Engineers Contractor — Status — Engineering 100% Complete. Pending HCFCD permit Will go out for bid in March 2025 Traffic Signal Equipment Upgrades Project Project Description - As part of the City's on -going traffic signal maintenance, City staff has identified three (3) existing signalized intersections with outdated and deteriorating equipment in need of replacement and upgrades. The intersections included with this project are: • S Houston Avenue at Isaacks Road N Houston Avenue at Townsen Blvd W Townsen Blvd at Walmart entrance drive Engineers-- ARKK Engineers Contractor — Larry Young Paving Status — For the month of February Larry Young Paving has pulled and hung wire for the ped poles and radar at Townsen and Walmart driveway. Wire has been pulled and hung at Townsen and N Houston for the radar, and at Isaacks and Houston the concrete foundation and pull box has been poured and the wire has been pulled and hung for radar. As of the end of February construction is delayed while waiting on the control cabinets to be built. North Houston and Charles St. Water line Improvements Project Description - Engineers — ARKK Engineers Contractor — Status — Engineering proposal coming in March WATER DEPARTMENT FEBRUARY 2026 MONTHLY REPORT TCEQ MONTHLY REPORT SEND REPORT TO: TCEQ Water Works Operation for P.O. BOX 13087 Ground Water Supplies Austin, Tx. 78711-3087 (1) Name of System (1 a) System I.D. No CITY OF HUMBLE 1010014 County : HARRIS Month of: February-26 PUMPAGE TO DISTRIBUTION SYSTEM IN THOUSAND GALS. (6) PURCHASED (7) SOLD Day (2) DIRECT (3) FROM GND. (4) TOTAL (5) DISINFECTION FROM C/O TO C/O FROM WELLS STORAGE PUMPAGE C12 Lbs. NH3N Gal. HOUSTON HOUSTON 1 96 1170 2803 43 10.1 1537 109 2 50 1266 2881 41 9.4 1565 107 3 160 856 2529 29 7.9 1513 170 4 216 930 2743 43 8.5 1597 119 5 169 714 2583 30 6.5 1700 117 G 44 721 2710 21 5 1945 156 7 272 922 2649 36 9.7 1455 127 8 139 955 2694 32 7.7 1600 167 9 112 900 2684 29 6.8 1672 102 10 253 906 2782 38 8 1623 98 11 102 662 2493 25 4.8 1729 114 12 69 1113 2846 30 6.3 1664 108 13 105 820 2882 29 3.4 1957 231 14 215 827 2419 32 6.3 1377 121 15 283 779 2467 35 8.6 1405 119 16 301 842 2490 37 8.9 1347 64 17 378 910 2574 39 10.5 1286 219 18 115 936 2814 33 9.3 1763 23 19 278 996 2780 36 10.9 1506 112 20 178 877 2758 32 7 1703 149 21 482 825 2858 39 10.9 1551 112 22 667 980 2631 54 13.3 984 159 23 0 1017 2700 32 9.5 1683 112 24 31 986 2948 32 7.9 1931 111 25 340 1058 2997 33 9.7 1599 116 26 218 1001 2939 40 13 1720 105 27 613 760 2622 45 14.7 1249 102 28 357 1003 2893 39 12.2 1533 98 TOTAL 6243 25732 76169 984 246.8 44194 3447 AVG. 223 919 2720 35 9 1578 123 MAX. 667 1266 2997 54 14.7 1957 231 MIN. 0 662 2419 21 3.4 984 23 (10) No. of active water services: (12) Dates and results of distribution bacteriological analyses: (13) Dates and results of raw unchlorinated well water samples (14) Reservoirs or tanks cleaned: (16) Over -flow Site / Amount: Well# 6 flushed 342000 gals (11) Chemical analysis: February-26 15 Samples, 15 Good Samples. (15) Dead ends flush: 02112/26 (17) Submitted by / Cert.#: THOMAS E. HOSLER WG0016273 (18) Total Monthly Combined Over -flows City of Humble Water Pumpage Report 2026 4201 Month Total Monthly Pumpage Total Well Pumpage Total City of Houston Peak Daily Pumpage Low Daily Pumpage Average Daily Pumpage Total Monthly Connections January 87,510 35,750 51,760 3,488 2,347 2,823 4,216 February 76,169 31,975 44,194 2,997 2,419 2,720 4,211 March April May June July August September October November December 4,201 Total 163,679 67,725 95,954 6,485 4,766 5,543 10 Maximum 87,510 35,750 51,760 3,488 2,419 2,823 Minimum 76,169 31,975 44,194 2,997 2,347 2,720 Average 81,840 33,863 47,977 3,243 2,383 2,772 Difference Between Water Billed and Water Pumped Total METERED DIFF VS PUMP Percent Loss Percent Metered 73,608 13,902 15.89% 84.11% 75,658 511 0.67% 99.33% WASTEWATER DEPARTMENT FEBRUARY 2026 MONTHLY REPORT EPA- TX0034401 City of Humble TCEQ-0010763-002 Southwest Wastewater Treatment Facility Month: February 2026 Date Temp. Rain Flow Meter Total Effluent Sample Flow Non Potable Water Belt press Water Bleach LROPM 14,230,909 C80D T.S.S. NH3N Ecoli pH DO Temp. 1-Feb 54.2 14,232.943 2,034,000 2A4 208,465 18.551 0 2-Feb 59.6 14,234,836 1,893,000 1.83 208,089 17,619 0 3-Feb 76.9 14,236 923 2,087,000 2.28 122,601 32,647 4.2 4-Feb 67.4 0.49 9,462 2.539,000 8.12 21.5 2.39 96,926 0 3.2 5-Feb 61.1 1,530 2,068,000 7.2 8.48 20.9 2.36 113,814 25.576 3.9 6-Feb 68.3 3 488 1,958,000 1.22 128,504 24,304 4.7 7-Feb 67.5 5,469 1.981,000 2 95,388 15 3.3 8-Feb 69.9 7,314 1,845,000 1.41 98,233 0 3.5 9-Feb 72.1 9.172 1,858 000 1.94 102,331 35 3.5 10-Feb 76 1,111 WO 1,939,000 1.87 132 301 35,003 4.3 11-Feb 76.7 3,109 1.998,000 8.12 23 1.72 120465 31,712 1.5 12-Feb 70.2 5,055 1,946,000 7.43 8.32 22.9 2.13 112,303 21,648 4 13-Feb 79.6 7,012 1,957,000 1.89 101,997 0 3.2 14-Feb 79 9,020 2,008,000 2 136,297 0 4.5 15-Feb 61 1.34 2,128 3,108,000 2.24 101,663 0 3.5 16-Feb 69.2 0.01 ,4,263 2,135,000 2.14 103,425 34,895 3.3 17-Feb 70.6 14,266,306 2,043,000 1 1 2.09 141,949 33868 1 4.6 18-Feb 78.3 14,268,421 2,115,000 7.51 22.7 2.64 137,521 38,840 4.7 19-Feb 82.4 14,270,511 2,090,000 7.55 8.57 23.5 1.99 125,805 34,465 4 20-Feb 1 81.6 14,272,667 2.156,000 1.94 128,156 34,015 0 21-Feb 82 14,274,810 2,143,000 2.26 119,914 20,068 2.2 22-Feb 66 14,276,746 1,936,000 2.01 101,427 0 2.6 23-Feb 61.2 14,278,526 1,780000 2.16 102,416 25 2.9 24-Feb 59.7 14.280,437 1,911,000 2.1 151,405 43,313 4.1 25-Feb 76.3 14,282,375 1,938.000 1 8.72 22.2 2.13 144,072 31,305 4 26-Feb 82 14.284 463 2.088,000 7.41 18.631 22.9 2.42 133,533 17,825 3.7 27-Feb 1 76.2 14,286,581 2,118,000 1 1 0 145,890 32,854 3.5 28-Feb 792 14,288.729 2.148,000 0 123,251 0 3.3 Total 2004.2 1.84 57.820.000 1 29.59 66.47 179.7 53.3 3,538,141 528,583 1 90.2 Av 72 1 2,065,000 7.40 8.31 22 2 126,362 18,878 3.22 Min. 54.2 0.01 1.780,000 1 7.20 7.51 20.9 0 95,388 0 0 Max. 82.4 1.34 3,108,000 1 1 7.55 1 8.72 1 23.6 2.64 208,465 43,313 4.7 City of Humble Wastewater Pumpage Report 2026 Month Total Monthly Treated Peak Daily Treated Low Daily Treated Average Daily Treated January 63,743 3,040 1,665 2,056 February 57,820 3,108 1,780 2,065 March April May June July August September October November December Total 121,563 6,148 3,445 4,121 Maximum 63,743 3,108 1,780 2,065 Minimum 57,820 3,040 1,665 2,056 Average 60,782 3,074 1,723 2,061 Difference Between Water Pumped vs. Wastewater Treated Total Water Pumped Wastewater Treated Pumped vs. Treated Percent Treated 87,510 63,743 23,767 72,84% 76,169 57,820 18,349 75.91% 163,679 121,563 42,116 74,27% STREET DEPARTMENT FEBRUARY 2026 MONTHLY REPORT Date Employee Location Task 2/27/2026 Salazar Armando North St 1000-1099 Replace asphalt paving 2/27/2026 ISAIS CARDONA North St 1000-1099 Replace asphalt paving 2/27/2026 Salazar Armando Townsen Blvd W 20100-20199 Remove tree/ limbs from ROW 2/27/2026 Isaias Cardona Townsen Blvd W 20100-20199 Remove tree/ limbs from ROW 2/24/2026 Villa Joel Water Well #9 Mow / weedeat ROW 2/24/2026 Isaias Cardona Water Well #9 Mow / weedeat ROW 2/24/2026 Salazar Armando Water Well #9 Mow / weedeat ROW 2/24/2026 Gunn Shane Water Well #9 Mow / weedeat ROW 2/24/2026 Allen Vince Water Well #9 Mow / weedeat ROW 2/24/2026 Allen Vince Elevated Storage Tower #3 Mow / weedeat ROW 2/24/2026 Villa Joel Elevated Storage Tower #3 Mow / weedeat ROW 2/24/2026 Gunn Shane Elevated Storage Tower #3 Mow / weedeat ROW 2/24/2026 Salazar Armando Elevated Storage Tower #3 Mow / weedeat ROW 2/24/2026 Isaias Cardona Elevated Storage Tower #3 Mow / weedeat ROW 2/24/2026 Williams Jason Elevated Storage Tower #3 Mow / weedeat ROW 2/24/2026 Gunn Shane 200 DENNIS ST a Mow / weedeat ROW 2/24/2026 Allen Vince 200 DENNIS ST a Mow / weedeat ROW 2/24/2026 Villa Joel 200 DENNIS ST a Mow / weedeat ROW 2/24/2026 Isaias Cardona 200 DENNIS ST a Mow / weedeat ROW 2/24/2026 Salazar Armando 200 DENNIS ST a Mow / weedeat ROW 2/24/2026 Williams Jason 240 DENNIS ST Mow animal shelter 2/24/2026 Allen Vince 240 DENNIS ST Mow animal shelter 2/24/2026 Isaias Cardona 240 DENNIS ST Mow animal shelter 2/24/2026 Salazar Armando 240 DENNIS ST Mow animal shelter 2/23/2026 Villa Joel Water Well #6 Mow / weedeat ROW 2/23/2026 Gunn Shane Water Well #6 Mow / weedeat ROW 2/23/2026 Allen Vince Water Well #6 Mow / weedeat ROW 2/23/2026 Salazar Armando Water Well #6 Mow / weedeat ROW 2/23/2026 Villa Joel 1315 E 1ST ST Patch pothole 2/23/2026 Allen Vince 1315 E 1ST ST Patch pothole 2/16/2026 Allen Vince City Wide Clean drain inlet 2/16/2026 Villa Joel City Wide Clean drain inlet 2/16/2026 Anderson Chase City Wide Clean drain inlet 2/16/2026 Gunn Shane City Wide Clean drain inlet 2/16/2026 Salazar Armando City Wide Clean drain inlet 2/16/2026 Isaias Cardona City Wide Clean drain inlet 2/13/2026 Salazar Armando Pine Hollow Dr 7500-7543 Replace concrete / asphalt paving due to base failure 2/13/2026 Gunn Shane Pine Hollow Dr 7500-7543 Replace concrete / asphalt paving due to base failure 2/13/2026 Wehunt David Pine Hollow Dr 7500-7543 Replace concrete / asphalt paving due to base failure 2/13/2026 Anderson Chase Pine Hollow Dr 7500-7543 Replace concrete / asphalt paving due to base failure 2/13/2026 ISAIS CARDONA Pine Hollow Dr 7500-7543 Replace concrete / asphalt paving due to base failure 2/13/2026 Villa Joel Pine Hollow Dr 7500-7543 Replace concrete / asphalt paving due to base failure 2/13/2026 Williams Jason Pine Hollow Dr 7500-7543 Replace concrete / asphalt paving due to base failure 2/13/2026 Allen Vince 212 N BENDER AVE Trash / debris removal 2/13/2026 Allen Vince 20118 EASTWAY VILLAGE DR Trash / debris removal 2/12/2026 Gunn Shane Wilson Rd 2654-2699 Replace concrete / asphalt driveway due to utility repi 2/12/2026 Villa Joel Wilson Rd 2654-2699 Replace concrete / asphalt driveway due to utility repi 2/12/2026 Wehunt David Wilson Rd 2654-2699 Replace concrete / asphalt driveway due to utility repi 2/12/2026 Williams Jason Wilson Rd 2654-2699 Replace concrete / asphalt driveway due to utility repi 2/12/2026 Anderson Chase Wilson Rd 2654-2699 Replace concrete / asphalt driveway due to utility repi 2/12/2026 Salazar Armando Wilson Rd 2654-2699 Replace concrete / asphalt driveway due to utility repi 2/12/2026 ISAIS CARDONA Wilson Rd 2654-2699 Replace concrete / asphalt driveway due to utility rep, 2/11/2026 Wehunt David Pine Hollow Dr 7500-7543 Replace concrete paving 2/11/2026 ISAIS CARDONA Pine Hollow Dr 7500-7543 Replace concrete paving 2/11/2026 Williams Jason Pine Hollow Dr 7500-7543 Replace concrete paving 2/11/2026 Villa Joel Pine Hollow Dr 7500-7543 Replace concrete paving 2/11/2026 Anderson Chase Pine Hollow Dr 7500-7543 Replace concrete paving 2/11/2026 Gunn Shane Pine Hollow Dr 7500-7543 Replace concrete paving 2/10/2026 Gunn Shane Pine Hollow Dr 7500-7543 Replace concrete paving 2/10/2026 Wehunt David Pine Hollow Dr 7500-7543 Replace concrete paving 2/10/2026 Anderson Chase Pine Hollow Dr 7500-7543 Replace concrete paving 2/10/2026 Villa Joel Pine Hollow Dr 7500-7543 Replace concrete paving 2/10/2026 ISAIS CARDONA Pine Hollow Dr 7500-7543 Replace concrete paving 2/10/2026 Salazar Armando Pine Hollow Dr 7500-7543 Replace concrete paving 2/10/2026 Williams Jason Pine Hollow Dr 7500-7543 Replace concrete paving 2/10/2026 Allen Vince 216 CHARLES ST Patch pothole 2/10/2026 Allen Vince 7700 WILL CLAYTON PKWY Notify traffic division of light malfunction 2/10/2026 Allen Vince 602 GRANBERRY ST Trash / debris removal 2/10/2026 Allen Vince 216 W 1ST ST N Patch pothole 2/10/2026 Allen Vince 7645 RANKIN RD Trash / debris removal 2/9/2026 Villa Joel Pine Hollow Dr 7500-7543 Replace concrete / asphalt paving due to base failure 2/9/2026 ISAIS CARDONA Pine Hollow Dr 7500-7543 Replace concrete / asphalt paving due to base failure 2/9/2026 Wehunt David Pine Hollow Dr 7500-7543 Replace concrete / asphalt paving due to base failure 2/9/2026 Gunn Shane Pine Hollow Dr 7500-7543 Replace concrete / asphalt paving due to base failure 2/9/2026 Anderson Chase Pine Hollow Dr 7500-7543 Replace concrete / asphalt paving due to base failure 2/9/2026 Williams Jason Pine Hollow Dr 7500-7543 Replace concrete / asphalt paving due to base failure 2/9/2026 Wehunt David Civic Center Move items 2/9/2026 ISAIS CARDONA Civic Center Move items 2/9/2026 Gunn Shane Civic Center Move items 2/9/2026 Anderson Chase Civic Center Move items 2/9/2026 Villa Joel Civic Center Move items 2/9/2026 Williams Jason Civic Center Move items 2/6/2026 ISAIS CARDONA Carolyn Ct 1300-1399 Move items 2/6/2026 Wehunt David Carolyn Ct 1300-1399 Move items 2/6/2026 Salazar Armando Carolyn Ct 1300-1399 Move items 2/6/2026 Wehunt David Granberry St 100-199 Move items 2/6/2026 ISAIS CARDONA Granberry St 100-199 Move items 2/5/2026 Gunn Shane Westminster Dr 9800-9843 Replace concrete paving 2/5/2026 Williams Jason Westminster Dr 9800-9843 Replace concrete paving 2/5/2026 Wehunt David Westminster Dr 9800-9843 Replace concrete paving 2/5/2026 Salazar Armando Westminster Dr 9800-9843 Replace concrete paving 2/5/2026 Villa Joel Westminster Dr 9800-9843 Replace concrete paving 2/5/2026 ISAIS CARDONA Westminster Dr 9800-9843 Replace concrete paving 2/5/2026 Wehunt David Manning Rd 1024-1099 Replace concrete / asphalt paving due to utility repair 2/5/2026 Gunn Shane Manning Rd 1024-1099 Replace concrete / asphalt paving due to utility repair 2/5/2026 Williams Jason Manning Rd 1024-1099 Replace concrete / asphalt paving due to utility repair 2/5/2026 Salazar Armando Manning Rd 1024-1099 Replace concrete / asphalt paving due to utility repair 2/5/2026 ISAIS CARDONA Manning Rd 1024-1099 Replace concrete / asphalt paving due to utility repair 2/4/2026 Gunn Shane Manning Rd 900-1021 Replace concrete / asphalt paving due to utility repair 2/4/2026 Salazar Armando Manning Rd 900-1021 Replace concrete / asphalt paving due to utility repair 2/4/2026 Wehunt David Manning Rd 900-1021 Replace concrete / asphalt paving due to utility repair 2/4/2026 Wehunt David Townsen Blvd E 19400-19499 Trash / debris removal 2/4/2026 Salazar Armando Townsen Blvd E 19400-19499 Trash / debris removal 2/4/2026 Gunn Shane Townsen Blvd E 19400-19499 Trash / debris removal 2/3/2026 Wehunt David City Wide Mow / weedeat ROW 2/3/2026 Villa Joel City Wide Mow / weedeat ROW 2/3/2026 Anderson Chase 19901 TOWNSEN BLVD E Mow / weedeat ROW 2/3/2026 Allen Vince 19901 TOWNSEN BLVD E Mow / weedeat ROW 2/3/2026 Wehunt David 19901 TOWNSEN BLVD E Mow/weedeat ROW 2/3/2026 Isaias Cardona 19901 TOWNSEN BLVD E Mow / weedeat ROW 2/3/2026 Gunn Shane 19901 TOWNSEN BLVD E Mow / weedeat ROW 2/3/2026 Salazar Armando 19901 TOWNSEN BLVD E Mow / weedeat ROW 2/3/2026 Villa Joel 19901 TOWNSEN BLVD E Mow / weedeat ROW 2/2/2026 Salazar Armando City Wide Mow / weedeat ROW 2/2/2026 Villa Joel City Wide Mow / weedeat ROW 2/2/2026 Wehunt David City Wide Mow / weedeat ROW 2/2/2026 Allen Vince 20155 TOWNSEN BLVD W Mow / weedeat ROW 2/2/2026 Anderson Chase 20155 TOWNSEN BLVD W Mow / weedeat ROW 2/2/2026 Villa Joel 20155 TOWNSEN BLVD W Mow / weedeat ROW 2/2/2026 Wehunt David 20155 TOWNSEN BLVD W Mow / weedeat ROW 2/2/2026 Gunn Shane 20155 TOWNSEN BLVD W Mow/weedeat ROW 2/2/2026 Salazar Armando 20155 TOWNSEN BLVD W Mow / weedeat ROW 2/2/2026 Isaias Cardona 20155 TOWNSEN BLVD W Mow / weedeat ROW VEHICLE MAINTENANCE FEBRUARY 2026 MONTHLY REPORT City of Humble Reporting Dates 02/01 /2026 02/28/2026 Fleet Maintenance Work Order Equipment Summary Grouped By Equipment/Vehicle Code WO # Date Equipment Code / Name Odometer Out Side Labor Parts In Labor House Parts Total Cost 2557 02/02/26 491 Police Department unit# 491 3,321 M $0.00 $0.00 $279.57 $607.48 $887.0S 2558 02/03/26 460 2016 Chevy Tahoe #460 123,301 M $0.00 $0.00 $59.96 $8.16 $68.12 2559 02/06/26 471 2017 Chevy Tahoe #471 108,111 M $0.00 $0.00 $215.05 $9S8.56 $1,173.61 2560 02/02/26 1103 2010 Chevy Silverado #1103 88,779 M $0.00 $0.00 $64.52 $149.83 $214.35 2561 02/04/26 648 2024 Chevy Silverado Unit # 648 18,541 M $0.00 $0.00 $14.99 $33.25 $48.24 2562 02/02/26 491 Police Department unit# 491 3,329 M $0.00 $0.00 $43.02 $0.00 $43.02 2563 02/03/26 463 2016 Chevy Tahoe #463 61,103 M $0.00 $0.00 $43.01 $119.49 $162.50 2564 02/03/26 456 2024 Chevy Tahoe 33,341 M $0.00 $0.00 $14.99 $33.25 $48.24 2565 02/05/26 456 2024 Chevy Tahoe 33,372 M $0.00 $0.00 $43.02 $79.99 $123.01 2566 02/04/26 438 2023 Chevy Tahoe #438 17,036 M $0.00 $0.00 $43.01 $0.00 $43.01 2567 02/04/26 428 Crime Scene Unit # 428 1 M $0.00 $0.00 $43.01 $45.00 $88.01 2568 02/04/26 427 Crime Scene Unit #427 3,117 M $0.00 $0.00 $43.01 $45.00 $88.01 2569 02/02/26 420 2022 Chevy Tahoe #420 25,634 M $0.00 $0.00 $29.98 $0.00 $29.98 2570 02/04/26 419 Police Dept. unit# 419 8,654 M $0.00 $0.00 $43.01 $0.00 $43.01 2571 02/02/26 344 2020 Ford F-250 #344 113,695 M $0.00 $0.00 $21.51 $18.50 $40.01 2572 02/02/26 339 2017 Ford F-550 #339 16,380 M $0.00 $0.00 $14.99 $28.42 $43.41 2573 02/02/26 204 2000 Boom Truck #204 60,736 M $0.00 $0.00 $89.94 $72.85 $162.79 2574 02/05/26 263 2022 International Sweeper 24,302 H $0.00 $0.00 $104.93 $808.14 $913.07 2575 02/05/26 440 2024 Checvrolet Tahoe #440 20,711 M $0.00 $0.00 $86.04 $66.23 $152.27 2576 02/05/26 1312 Buildinq Maintenance Dept Unit# 1312 56 M $0.00 $0.00 $59.96 $89.00 $148.96 2577 02/09/26 281 Street Dept Unit# 281 1,817 M $0.00 $0.00 $14.99 $3.06 $18.05 2578 02/10/26 2061 2023 GMC 2S00 #2061 16,633 M $0.00 $0.00 $44.97 $400.00 $444.97 2579 02/09/26 498 2013 Chevy Tahoe #498 122,536 M $0.00 $0.00 $44.97 $56.06 $101.03 2580 02/09/26 467 2016 Chevy Tahoe #467 180,981 M $0.00 $0.00 $29.98 $0.00 $29.98 2581 02/09/26 400 2020 Chevy Tahoe #400 56,492 M $0.00 $0.00 $104.93 $244.62 $349.55 2582 02/10/26 423 2022 Chevy Tahoe #423 53,468 M $0.00 $0.00 $107.54 $37.11 $144.65 2583 02/10/26 347 2021 Pierce Velocity Ladder #347 0 $0.00 $0.00 $129.03 $879.30 $1,008.33 2584 02/10/26 648 2024 Chevy Silverado Unit # 648 18,726 M $0.00 $0.00 $64.52 $400.00 $464.52 2585 02/10/26 409 2020 Chevy Tahoe #409 83,427 M $0.00 $0.00 $119.92 $283.63 $403.55 2586 02/11/26 632 2021 Ford F-350 #632 17,231 M $0.00 $0.00 $72.99 $62.03 $135.02 2587 02/11/26 616 2013 Chevy Silverado #616 135,337 M $0.00 $0.00 $14.99 $31.98 $46.97 2588 02/12/26 436 2013 Chevy Tahoe #436 111,248 M $0.00 $0.00 $74.95 $250.54 $325.49 2589 02/12/26 625 2018 Ford F-550 #625 43,481 M $0.00 $0.00 $59.96 $204.26 $264.22 2590 02/12/26 1312 Buildinq Maintenance Dept Unit# 1312 69 M $0.00 $0.00 $179.88 $633.85 $813.73 2591 02/14/26 2033 1995 Case Backhoe #2033 4,812 H $0.00 $0.00 $89.94 $889.62 $979.56 March 4, 2026 1 City of Humble Reporting Dates 02/01 /2026 02/28/2026 Fleet Maintenance Work Order Equipment Summary Grouped By Equipment/Vehicle Code WO # Date Equipment Code / Name Odometer Out Side Labor Parts Labor In House Parts Total Cost 2592 02/13/26 447 2024 Chevy Tahoe Unit #447 19,102 M $0.00 $0.00 $72.99 $326.15 $399.14 2593 02/16/26 1524 2008 Chevy Silverado #1524 74,611 M $0.00 $0.00 $59.96 $329.36 $389.32 2594 02/18/26 1232 2022 Chevy Tahoe #1232 26,775 M $0.00 $0.00 $86.02 $153.81 $239.83 2595 02/17/26 457 Police Department unit# 457 8,182 M $0.00 $0.00 $172.04 $404.17 $576.21 2596 02/18/26 445 2024 Chevy Tahoe Unit #445 9,531 M $0.00 $0.00 $86.03 $123.85 $209.88 2597 02/17/26 230 2003 Case 580 Super M #230 4,545 H $0.00 $0.00 $29.98 $203.00 $232.98 2598 02/17/26 499 2020 Chevy Tahoe #499 73,806 M $0.00 $0.00 $22.49 $33.25 $55.74 2599 02/17/26 461 Police Dept Patrol Unit #461 10,603 M $0.00 $0.00 $43.01 $0.00 $43.01 2600 02/17/26 484 2018 Chvey Tahoe #484 99,360 M $0.00 $0.00 $21.51 $33.25 $54.76 2601 02/16/26 409 2020 Chevy Tahoe #409 83,535 M $0.00 $0.00 $21.51 $18.50 $40.01 2602 02/16/26 409 2020 Chevy Tahoe #409 83,530 M $0.00 $0.00 $21.51 $0.00 $21.51 2603 02/16/26 461 Police Dept Patrol Unit #461 10,479 M $0.00 $0.00 $21.51 $0.00 $21.51 2604 02/18/26 438 2023 Chevy Tahoe #438 17,190 M $0.00 $0.00 $43.01 $0.00 $43.01 2605 02/19/26 278 2024 GMC Sierra Unit # 278 4,194 M $0.00 $0.00 $14.99 $33.25 $48.24 2606 02/18/26 435 2023 Chevy Tahoe #435 24,607 M $0.00 $0.00 $14.99 $146.45 $161.44 2607 02/18/26 1525 2022 Chevy Silverado #1525 49,548 M $0.00 $0.00 $22.49 $42.00 $64.49 2608 02/20/26 421 2022 Chevy Tahoe #421 28,016 M $0.00 $0.00 $29.98 $83.98 $113.96 2609 02/20/26 463 2016 Chevy Tahoe #463 61,217 M $0.00 $0.00 $104.93 $612.51 $717.44 2610 02/27/26 250 2016 Ford F-550 #250 69,300 M $0.00 $0.00 $64.52 $18.41 $82.93 2611 02/09/26 252 2016 Case #252 440 H $0.00 $0.00 $21.51 $450.00 $471.51 2612 02/25/26 263 2022 International Sweeper 24,303 H $0.00 $0.00 $21.51 $443.10 $464.61 2613 02/27/26 263 2022 International Sweeper 24,767 H $0.00 $0.00 $14.99 $31.98 $46.97 2614 02/23/26 266 2023 GMC 1500 #266 34,201 M $0.00 $0.00 $29.98 $33.25 $63.23 2615 02/24/26 275 2024 GMC 2500 Double Cab 81418 M $0.00 $0.00 $59.96 $433.25 $493.21 2616 02/27/26 339 2017 Ford F-550 #339 16,385 M $0.00 $0.00 $21.51 $40.00 $61.51 2617 02/26/26 400 2020 Chevy Tahoe #400 56,621 M $0.00 $0.00 $29.98 $0.00 $29.98 2618 02/25/26 403 Police Dept Traffic Unit# 403 74 M $0.00 $0.00 $21.51 $0.00 $21.51 2619 02/25/26 404 Police Dept Traffic Unit # 404 65 M $0.00 $0.00 $29.98 $0.00 $29.98 2620 02/25/26 422 2022 Chevy Tahoe #422 29,975 M $0.00 $0.00 $89.94 $669.65 $759.59 2621 02/23/26 423 2022 Chevy Tahoe #423 53,479 M $0.00 $0.00 $21.S1 $0.00 $21.51 2622 02/10/26 423 2022 Chevy Tahoe #423 43,476 M $0.00 $0.00 $21.51 $180.00 $201.51 2623 02/26/26 433 2013 Chevy Tahoe #433 107,322 M $0.00 $0.00 $215.05 $496.99 $712.04 2624 02/23/26 435 2023 Chevy Tahoe #435 25,173 M $0.00 $0.00 $104.93 $354.44 $459.37 2625 02/24/26 438 2023 Chevy Tahoe #438 17,263 M $0.00 $0.00 $104.93 $585.80 $690.73 2626 02/25/26 445 2024 Chevy Tahoe Unit #445 9,674 M $0.00 $0.00 $43.02 $0.00 $43.02 March 4, 2026 2 City of Humble Reporting Dates 02/01 /2026 02/28/2026 Fleet Maintenance Work Order Equipment Summary Grouped By Equipment/Vehicle Code Out Side In House WO # Date Equipment Code / Name Odometer Labor Parts Labor Parts Total Cost 2627 02/26/26 471 2017 Chevy Tahoe #471 109,102 M $0.00 $0.00 $21.51 $18.50 $40.01 2628 02/24/26 474 2017 Chevy Tahoe #474 128,418 M $0.00 $0.00 $21.51 $18.50 $40.01 2629 02/26/26 484 2018 Chvey Tahoe #484 99,448 M $0.00 $0.00 $14.99 $17.42 $32.41 2630 02/24/26 487 2018 Chevy Tahoe #487 50,241 M $0.00 $0.00 $322.60 $453.52 $776.12 2631 02/25/26 489 Police Department Unit# 489 14,029 M $0.00 $0.00 $89.94 $675.07 $765.01 2632 02/23/26 498 2013 Chevy Tahoe #498 122,951 M $0.00 $0.00 $74.95 $378.29 $453.24 2633 02/25/26 627 2019 Chevy Silverado #627 72,220 M $0.00 $0.00 $344.77 $313.53 $658.30 2634 02/24/26 928 2017 Chevy Silverado #928 114,140 M $0.00 $0.00 $21.51 $18.50 $40.01 2635 02/23/26 1103 2010 Chevy Silverado #1103 89,373 M $0.00 $0.00 $21.51 $18.50 $40.01 2636 02/27/26 3027 2017 Ford F-550 #3027 27,243 M $0.00 $0.00 $21.51 $18.50 $40.01 2637 02/25/26 1519 2017 Chevy Silverado #1S19 74,559 M $0.00 $0.00 $21.51 $18.50 $40.01 2638 02/13/26 2033 1995 Case Backhoe #2033 4,779 H $0.00 $0.00 $89.94 $889.62 $979.56 2639 02/23/26 2058 2019 Ford F-550 #2058 54,819 M $0.00 $0.00 $21.51 $18.50 $40.01 2640 02/27/26 1231 2021 Chevy Tahoe #1231 45,065 M $0.00 $0.00 $29.98 $10.23 $40.21 2641 02/24/26 929 2022 Chevy Silverado #929 43,777 M $0.00 $0.00 $21.51 $2,041.04 $2,062.55 2642 02/25/26 1236 Emerqency manaqement unit# 1236 4,561 M $0.00 $0.00 $14.99 $33.25 $48.24 2643 02/23/26 3027 2017 Ford F-550 #3027 27,177 M $0.00 $0.00 $21.51 $91.44 $112.95 2644 02/18/26 423 2022 Chevy Tahoe #423 53,477 M $0.00 $0.00 $86.02 $33.12 $119.14 88 63 $0.00 $0.00 $5,578.14 $18,885.64 $24,463.78 88 Units Listed: 63 $0.00 $0.00 $5,578.14 $18,885.64 $24,463.78 Labor Parts Total Cost / Unit: 63 $88.54 $299.77 $388.31 Cost / WO: 88 $63.39 $214.61 $278.00 March 4, 2026 3