HomeMy WebLinkAbout2026 01 Public Works Monthly ReportCITY OF HUMBLE PUBLIC WORKS DEPARTMENT MONTHLY REPORT JANUARY 2026 MARK K. ARNOLD DIRECTOR OF PUBLIC WORKS CITY OF HUMBLE JANUARY 2026 MONTHLY GASOLINE REPORT CITY OF HUMBLE ANNUAL GASOLINE REPORT 26-Jan DEPARTMENT UNLEADED DIESEL TOTAL UNLEADED DIESEL ADMINISTRATION 21.5 0 21.5 0.19% 0.00% STREET 625.4 375.6 1001 5.39% 27.91% FIRE/ EMS 522.4 868.7 1391.1 4.50% 64.54% POLICE 6748.2 0 6748.2 58.13% 0.00% TRAFFIC CONTROL 749.8 0 749.8 6.46% 0.00% PARK 460.2 31.7 491.9 3.96% 2.36% ANIMAL CONTROL 66.3 0 66.3 0.57% 0.00% INSPECTIONS 314.2 0 314.2 2.71% 0.00% VEH MAINT 62.3 0 62.3 0.54% 0.00% FIRE MARSHAL 524.9 0 524.9 4.52% 0.00% BLD MAINT 177.1 0 177.1 1.53% 0.00% WATER 472.6 53 525.6 4.07% 3.94% SEWER 300.3 16.9 317.2 2.59% 1.26% SENIOR ACTIVITY 103.1 0 103.1 0.89% 0.00% CIVIC CENTER 460.2 0 460.2 3.96% 0.00% TOTAL 11608.5 1345.9 12954.4 100.00% 100.00% PUBLIC WORKS DEPARTMENT JANUARY 2026 OVERTIME / COMPTIME MONTHLY REPORT Monthly Overtime / Comptime Report City of Humble Public Works Department Water & Wastewater Treatment Employee On -Call Time Total O.T. Total Comp Jason Campbell 15 29 0 Kyle Elliott 0 8 0 Steve Filmore 37.5 58 0 Tommy Hosler 0 0 0 Louis Johnson 0 17 0 Matt Watters 30 15 0 Total: 82.5 127 0 Water & Wastewater Distribution Employee On -Call Time Total O.T. Total Comp Billy Baucom 22.5 14 0 Mason Bradshaw 15 6 0 Angel Cuellar 0 0 0 Ray Flores 15 7 0 Kevin Gunn 0 16.5 0 Gordon Meadows 0 0 0 Colby Parker 15 9.5 0 Mike Richard 0 25.5 0 Brandon Wehunt 15 15.5 0 Total: 82.5 94 0 Street Department Employee On -Call Time Total O.T. Total Comp Vincent Allen 15 37 0 Chase Anderson 0 37 0 Justin Brown 0 0 0 Isaias Cardona 15 0 0 Shane Gunn 22.5 0 0 Jack Lemoine 0 2 0 Armando Salazar 15 0 0 Jarred Thomas 0 8 0 Joel Villa 0 0 1 David Wehunt 0 27 0 Jason Williams 15 27 0 Total: 82.5 138 1 Vehicle Maintenance Employee On -Call Time Total O.T. Total Comp Frank Alexander 0 0 0 Ryan Killion 0 0 0 Bill Neeley 0 0 0 Total: 0 0 0 Building Maintenance Employee On -Call Time Total O.T. Total Comp Fred Hawkins 0 7 0 George McCaa 0 0 6 Brett Nielsen 0 0 0 Alex Guerra 0 1.5 0 Total: 0 8.5 6 PUBLIC WORKS DEPARTMENT JANUARY 2026 MONTHLY PROJECT REPORTS TABLE OF CONTENTS Project Summary page 2 Special Projects Northshire LS upgrades and New Force Main & Gravity Line page 3 City of Houston Inter -Connect #2 page 4 South Houston Ave Road Widening & Reconstruction Project page 5 Sanitary Sewer Rehabilitation Phase 6 Project page 6 Meeks and Manning Road Paving and Drainage Improvement Project page 7 McDugald, Sharon Dr., and Carolyn Ct. Road Reconstruction Project page 8 16" Water line from Well 6 to Well 9 page 9 2025 Traffic Signal Equipment Upgrades Project page 10 North Houston and Charles St Water line Improvements page 11 Project Summary Project Engineer Contractor Cost Dates Northshire LS upgrades, pg , RPS —Klotz & V&S $ 10,473,257.40 Con. $ 1,040,830.00 Eng. Construction began New Force Main & Gravity Line Associates Construction in January $ 11,514,087.40 City of Houston ISJ Underground $ 273,550.00 Eng. ARKK Utilities, LLC $ 2,353,060.00 Const. Construction to begin February 2026 $ 2,626,610.00 inter -Connect #2 Engineers South Houston Ave Road ARKK $ 1,132,360.00 Widening & Engineers Design & Construction Engineering 90% complete Reconstruction Project Services Cost Sanitary Sewer ARKK King Solution $ 176,250.00 Eng. Construction 35% complete Rehabilitation Phase 6 Engineers Services, LLC $ 1,069,785.00 Const. $ 1,246,035.00 Project Project to be completed in June Meeks and Manning Road ARKK $ 241,750.00 Paving and Drainage Engineers Design & Construction Engineering 75% complete Improvement Project Services Cost McDugald, Sharon Dr., ARKK $ 369,500.00 Eng. Construction began and Carolyn Ct. Road Engineers Ballast Point $ 2,904,918:00 Const January 30,2026 $ 3,274,418.00 Reconstruction Project 16" Water line from $ 178,000.00 Engineering complete Well 6 to Well 9 ARKK Engineers Design & Construction Pending HCFCD permit Services Cost Out for bid in February 2025 Traffic Signal ARKK Larry Young $ 69,800.00 Eng. Construction began Equipment Upgrades Engineers Paving $ 314,960.00 Const. in January $ 384,760.00 Project North Houston and ARKK Engineering proposal Charles St. water line Engineers coming in February Improvement Under Construction $ 16,419,300.40 Under Design $ 4,178,720.00 Total $ 20,598,020.40 Northshire LS Upgrade, New Force Main, New Gravity Sewer Line Protect Description - This project includes Wastewater System Improvements for providing sewer service for anticipated growth in the northwest area of Humble around West Townsen. It includes the upgrades to the Northshire Lift Station including electrical work and new piping and valves, construction of approximately 10,000 linear feet of 16" force main, 5,600 linear feet of 24" gravity sewer line, and replacement of 2,300 linear feet of 27" gravity sanitary sewer line. The improvements also include replacing the siphon that crosses Garner's Bayou into the Wastewater Plant Engineers — RPS — Klotz Associate, Inc. Contractor — V&S Construction Status Construction began in January City of Houston Inter -Connect #2 Proeect Description - Engineers — ARKK Engineers Contractor — ISJ Underground Utilities, LLC Status — Contract awarded Construction to begin in February 2026 Material submittals being reviewed. South Houston Road Wideninp, & Reconstruction Project Project Description - Project involves improvements to widen the existing 2-lane asphalt roadway to a 3-lane concrete curb and gutter roadway. Drainage improvements include installation of underground storm sewers, inlets and ditch regrading. It also includes a new traffic signal system. Engineers — ARKK Engineers Contractor — Status — Engineering 90% complete Coordinating with Centerpoint and private utilities for relocation of utilities. Sanitary So er Rehabilitation Phase 6 Project Project Description - Project involves replacement and rehabilitation of several deteriorated sanitary sewer line segments throughout the City. Engineers — ARKK Engineers Contractor — King Solution Services, LLC Status — Construction in progress Project 35% complete Project to be completed in June. Meeks and Manning Road Paving and Drainage Improvement Project Proiect Description - Project involves milling and overlaying the existing asphalt streets and regrading and installing roadside drainage culverts, new water line and fire hydrants along Meeks Road. Engineers — ARKK Engineers Contractor — Status — Engineering 75% complete McDugald, Sharon Dr., and Carolyn Ct. Road Reconstruction Protect Protect Description - Project consists of replacing the existing asphalt streets with concrete curb and gutter streets, and will include replacing the water line and fire hydrants along McDugald. Engineers.— ARKK Engineers Contractor — Ballast Point Status — Construction began in January 16 inch Water line from Well 6 to NVell 9 Project Description - Project will provide a 16" surface water line to connect Well 6 (Rankin Rd) to the ground storage tank and booster pumps at Well 9 (Carpenter Rd). This will allow the surface water to be provided from 3 of the City's well sites Engineers.— ARKK Engineers Contractor — Status — Engineering 100% Complete. Pending HCFCD permit Will go out for bid in February 2026 2025 Traffic Signal Equipment Upt!rades Project Protect Description - As part of the City's on -going traffic signal maintenance, City staff has identified three (3) existing signalized intersections with outdated and deteriorating equipment in need of replacement and upgrades. The intersections included with this project are: • S Houston Avenue at lsaacks Road N Houston Avenue at Townsen Blvd W Townsen Blvd at Walmart entrance drive Engineers — ARKK Engineers Contractor -Larry Young Paving Status — Pre Construction Construction began in January WATER DEPARTMENT JANUARY 2026 MONTHLY REPORT TCEQ MONTHLY REPORT Water Works Operation for Ground Water Supplies (1) Name of System (1a) System I.D. No.: SEND REPORT TO: TCEQ CITY OF HUMBLE County : P.O. BOX 13087 Austin, Tx. 78711-3087 HARRIS 1010014 Month of: January-26 PUMPAGE TO DISTRIBUTION SYSTEM IN THOUSAND GALS. ()PURCHASED (7) SOLD Day (2) DIRECT (3) FROM GND. (4) TOTAL (5) DISINFECTION FROM C/O TO C/O FROM WELLS STORAGE PUMPAGE Cl2 Lbs. NH3N Gal. HOUSTON HOUSTON 1 97 648 2448 16 6.1 1703 119 2 0 790 2823 34 6.6 2033 102 3 28 820 2600 30 7 1752 133 4 4 693 2737 29 5.8 2040 117 5 108 872 2930 36 8.6 1950 212 6 28 605 2765 26 6.3 2132 14 7 19 956 3025 37 7.8 2050 110 8 715 1022 3276 61 12.9 1539 115 9 301 1016 2969 48 9.9 1652 168 10 323 826 2562 42 8.4 1413 62 11 341 908 2742 44 12.3 1493 115 12 190 1013 2791 42 9 1588 103 13 451 927 2861 38 10.8 1483 102 14 52 811 2842 32 7.9 1979 113 15 55 1077 3027 38 8.6 1895 138 16 37 809 2773 32 7 1927 117 17 44 661 2754 21 5.4 2049 118 18 60 741 2347 30 6.7 1546 116 19 136 492 2721 25 7.2 2093 114 20 38 866 2911 33 8.2 2007 111 21 0 839 2758 27 5.6 1919 98 22 0 879 2731 29 8.2 1852 114 23 0 853 2749 27 6.2 1896 103 24 89 542 2706 29 5.9 2075 112 25 574 1622 3488 81 20.2 1292 122 26 512 1550 3121 69 16.3 1059 49 27 390 1478 3102 63 16.9 1234 76 28 849 1106 2619 64 13.6 664 202 29 1106 1213 2848 76 17.5 529 109 30 251 1233 28631 521 7.51 1379 107 31 17 1067 2U1t 401 8.41 1537 112 TOTAL 6815 28935 -97510 1251 288.8 51760 3503 AVG. 220 933 2823 40 9 1670 113 MAX. 1106 1622 3488 81 20.2 2132 212 MIN. 0 492 2347 16 5.4 529 14 (10) No. of active water services: 1 4216 1 (11) Chemical analysis: January-26 (12) Dates and results of distribution bacteriological analyses: 15 Samples. 15 Good Samples. (13) Dates and results of raw unchlorinated well water samples: (14) Reservoirs or tanks cleaned: None (15) Dead ends flush: 01/12/26 (16) Over -flow Site / Amount: EST# 1-140,000 gals / EST# 2-395,000 gals. / EST# 3-875,000 gals ! WeIL#9 GST-365,000 gals. (17) Submitted by / Cert.#: THOMAS E. HOSLER WG0016273 (18) Total Monthly Combined Over -flows 1 1,775,000 gsls City of Humble Water Pumpage Report 2026 4201 Month Total Monthly Pumpage Total Well Pumpage Total City of Houston Peak Daily Pumpage Low Daily Pumpage Average Daily Pumpage Total Monthly Connections January 87,510 35,750 51,760 3,488 2,347 2,823 4,216 February March April May June July August September October November December 4,201 Total 87,510 35,750 51,760 3,488 2,347 2,823 15 Maximum 87,510 35,750 51,760 3,488 2,347 2,823 Minimum 87,510 35,750 51,760 3,488 2,347 2,823 Average 87,510 35,750 51,760 3,488 2,347 2,823 Difference Between Water Billed and Water Pumped Total METERED DIFF VS PUMP Percent Loss Percent Metered 73,608 13,902 15.89% 84.11% WASTEWATER DEPARTMENT JANUARY 2026 MONTHLY REPORT EPA-TX0034401 City of Humble TCEQ-0010763-002 Southwest Wastewater Treatment Facility January 2026 Date Temp. Rain Flow Meter Total Flow ; Effluent Sample Flow Non Potable Beltpress Bleach LROPM 14,167,166 CBOD T.S.S. NH3N ECOIi pH DO Temp. Water Water 1-Jan 60.6 14,168,961 1,795,000 1.23 144,682 34,810 0.04 2-Jan 79.1 14,170,626 1,665,000 7.31 8.51 22.6 1.72 108,345 10 0.2 3-Jan 77.5 14,172,617 1,991,000 1.4 142,031 34,074 0.3 4-Jan 1 66.7 14,174,564 1,947,000 1 11.26 110,518 0 0.3 5-Jan 68.3 14,176,455 1,891,000 1.72 115,595 32 0 6-Jan 80.3 14,178,528 2,073,000 1.42 147,459 32,372 6 7-Jan 80 14,180,633 2,105,000 752 24.5 2.06 147,279 29,933 1.3 8-Jan 83.2 14,182,719 2,086,000 7.24 7.4 24.8 2.11 138,754 34,118 0.8 9-Jan 81.9 14,184,759 2,040,000 2.22 133,405 31,868 1 10-Jan 73.9 1.48 14,187,556 2,797,000 2.07 100,662 0 0 11-Jan 1 61.8 14,189,598 2,042,000 11.39 97,438 0 0 64 14,191,435 1,837,000 2.23 101,925 64 0 66.2 14,193,384 1,949,000 1.03 138,905 34,513 0 P14-Jan 68 0.05 14,195,321 1,937,000 2.8 133,684 33,034 0 62.4 14,197,296 1,975,000 8.6 22.3 1.7 127,069 27,084 0 64.2 14,199,236 1,940,000 7.49 8.46 22.4 2.03 138,730 35,950 0 17-Jan 69.8 14,201,202 1 1,966,000 1.97 128,812 30,065 0 18-Jan 58.3 14,202,992 1 1,790,000 1.34 88,965 35 0 19-Jan 57.4 14,204,698 1,706,000 1.77 95,599 170 1.3 20-Jan 64.6 14,206,722 2,024,000 1.82 97,923 16,300 0 21-Jan 75.2 14,208,697 1,975,000 8.34 22.7 2.1 118,586 27,492 0 22-Jan 75.8 14,211,042 2,345,000 7.44 7.85 23 2.62 127,605 30,295 3.6 23-Jan 75.3 14,213,135 2,093,000 1.63 153,569 30,137 5.9 24-Jan 1 71.3 0.29 14,215,291 2,156,000 3.79 185,914 46,433 1.3 25-Jan 58.4 1 0.47 14,218,331 3,040.000 2.67 156,032 21,862 0 26-Jan 53.5 14,220,701 2,370,000 1.84 146,861 22,854 0 27-Jan 51.9 14,222,797 2,096,000 2.1 158,235 22,112 0.1 28-Jan 55.9 14,224,933 2,136,000 8.98 19.8 2.1 214,424 72,563 0 29-Jan 58.1 14,226,913 1,980,000 7.49 8.51 19.8 1.71 114,447 1,233 0.3 30-Jan 62.3 14,228,960 2,047.000 1.61 133,218 37,253 0 31-Jan 1 60.6 14,230,909 1.949,000 1.93 195.105 34,961 0 Total 2086.5 1 2.29 63,743,000 36.97 74.17 201.9 59.39 4,141,776 721,627 16.44 Avg 67 1 2,056,226 7.39 8.24 22 2 131,556 23,278 0.53 Min. 51.9 0.05 1,665,000 i 7.24 7.40 19.8 1.03 88,965 0 0 Max. 83.2 1.48 3,040,000 7.49 8.98 1 24.8 3,79 214:424 72,563 99 City of Humble Wastewater Pumpage Report 2026 Month Total Monthly Treated Peak Daily Treated Low Daily Treated Average Daily Treated January 63,743 3,040 1,665 2,056 February March April May June July August September October November December Total 63,743 3,040 1,665 2,056 Maximum 63,743 3,040 1,665 2,056 Minimum 63,743 3,040 1,665 2,056 Average 63,743 3,040 1,665 2,056 Difference Between Water Pumped vs. Wastewater Treated Total Water Pumped Wastewater Treated Pumped vs. Treated Percent Treated 87,510 63,743 23,767 72.84% 87,510 63,743 23,767 72.84% STREET DEPARTMENT JANUARY 2026 MONTHLY REPORT Street Dept Task List Date Employee Name Location Task 1/29/2026 Wehunt David Townsen Blvd W 20100-20199 Remove tree/ limbs from ROW 1/29/2026 Gunn Shane Townsen Blvd W 20100-20199 Remove tree/ limbs from ROW 1/29/2026 ISAIS CARDONA Townsen Blvd W 20100-20199 Remove tree/ limbs from ROW 1/29/2026 Anderson Chase Townsen Blvd W 20100-20199 Remove tree/ limbs from ROW 1/29/2026 Salazar Armando Townsen Blvd W 20100-20199 Remove tree/ limbs from ROW 1/28/2026 Allen Vince 8233 WILL CLAYTON PKWY Misc sign request 1/28/2026 Anderson Chase 8233 WILL CLAYTON PKWY Misc sign request 1/28/2026 Brown Justin 8233 WILL CLAYTON PKWY Misc sign request 1/28/2026 Villa Joel 8233 WILL CLAYTON PKWY Misc sign request 1/28/2026 Wehunt David 8233 WILL CLAYTON PKWY Misc sign request 1/28/2026 Gunn Shane 8233 WILL CLAYTON PKWY Misc sign request 1/28/2026 Salazar Armando 8233 WILL CLAYTON PKWY Misc sign request 1/28/2026 Isaias Cardona 8233 WILL CLAYTON PKWY Misc sign request 1/28/2026 Allen Vince City Wide Trash / debris removal 1/28/2026 Brown Justin City Wide Trash / debris removal 1/28/2026 Villa Joel City Wide Trash / debris removal 1/28/2026 Wehunt David City Wide Trash / debris removal 1/28/2026 Anderson Chase City Wide Trash / debris removal 1/28/2026 Isaias Cardona City Wide Trash / debris removal 1/28/2026 Salazar Armando City Wide Trash / debris removal 1/28/2026 Gunn Shane City Wide Trash / debris removal 1/28/2026 Gunn Shane Meek Rd 1112-1139 Trash / debris removal 1/28/2026 Salazar Armando Meek Rd 1112-1139 Trash / debris removal 1/26/2026 Anderson Chase Memphis Ln 17000-17099 Remove tree/ limbs from ROW 1/26/2026 Allen Vince 240 DENNIS ST Dead animal pickup 1/26/2026 ISAIS CARDONA 240 DENNIS ST Dead animal pickup 1/26/2026 Villa Joel 240 DENNIS ST Dead animal pickup 1/26/2026 Anderson Chase Sandpiper Cir 7400-7419 Remove tree/ limbs from ROW 1/25/2026 Anderson Chase Wilson Road Lift Station Lift Pump Maint & Repairs LS 1/25/2026 Allen Vince 18228 HWY 59 Notifytraffic division of light malfunction 1/23/2026 Allen Vince 7700 WILL CLAYTON PKWY Notifytraffic division of light malfunction 1/23/2026 Allen Vince 21802 TOWNSEN BLVD W Notify traffic division of light malfunction 1/21/2026 Allen Vince 140 E FM 1960 BYP Notify traffic division of light malfunction 1/21/2026 Brown Justin City Wide Clean drain inlet 1/21/2026 Gunn Shane City Wide Clean drain inlet 1/21/2026 Villa Joel City Wide Clean drain inlet 1/21/2026 Salazar Armando City Wide Clean drain inlet 1/21/2026 Wehunt David City Wide Clean drain inlet 1/21/2026 Anderson Chase City Wide Clean drain inlet 1/21/2026 Allen Vince City Wide Clean drain inlet 1/20/2026 Brown Justin Haverhill Dr 9800-9899 Install new sidewalk 1/20/2026 Villa Joel Haverhill Dr 9800-9899 Install new sidewalk 1/20/2026 Salazar Armando Haverhill Dr 9800-9899 Install new sidewalk 1/20/2026 ISAIS CARDONA Haverhill Dr 9800-9899 Install new sidewalk 1/20/2026 Gunn Shane Haverhill Dr 9800-9899 Install new sidewalk 1/20/2026 Anderson Chase Haverhill Dr 9800-9899 Install new sidewalk 1/20/2026 Williams Jason Haverhill Dr 9800-9899 Install new sidewalk 1/20/2026 Wehunt David Haverhill Dr 9800-9899 Install new sidewalk 1/20/2026 Brown Justin Southwick Dr 9800-9829 Install new sidewalk 1/20/2026 Anderson Chase Southwick Dr 9800-9829 Install new sidewalk 1/20/2026 Salazar Armando Southwick Dr 9800-9829 Install new sidewalk 1/20/2026 ISAIS CARDONA Southwick Dr 9800-9829 Install new sidewalk 1/20/2026 Wehunt David Southwick Dr 9800-9829 Install new sidewalk 1/20/2026 Villa Joel Southwick Dr 9800-9829 Install new sidewalk 1/20/2026 Gunn Shane Southwick Dr 9800-9829 Install new sidewalk 1/20/2026 Williams Jason Southwick Dr 9800-9829 Install new sidewalk 1/20/2026 Wehunt David Defee Ave 600-699 Hang or replace signs 1/20/2026 ISAIS CARDONA Defee Ave 600-699 Hang or replace signs 1/20/2026 Williams Jason Defee Ave 600-699 Hang or replace signs 1/20/2026 Brown Justin 548 S HOUSTON AVE Trash / debris removal 1/20/2026 ISAIS CARDONA 548 S HOUSTON AVE Trash / debris removal 1/20/2026 Villa Joel 548 S HOUSTON AVE Trash / debris removal 1/20/2026 Allen Vince 548 S HOUSTON AVE Trash / debris removal 1/19/2026 Allen Vince 7821 RANKIN RD Dead animal pickup 1/19/2026 Villa Joel 7821 RANKIN RD Dead animal pickup 1/19/2026 Williams Jason Southwick Dr 9800-9829 Replace broken sidewalk 1/19/2026 Villa Joel Southwick Dr 9800-9829 Replace broken sidewalk 1/19/2026 ISAIS CARDONA Southwick Dr 9800-9829 Replace broken sidewalk 1/19/2026 Anderson Chase Southwick Dr 9800-9829 Replace broken sidewalk 1/19/2026 Gunn Shane Southwick Dr 9800-9829 Replace broken sidewalk 1/19/2026 Salazar Armando Southwick Dr 9800-9829 Replace broken sidewalk 1/19/2026 Wehunt David Southwick Dr 9800-9829 Replace broken sidewalk 1/19/2026 Williams Jason Haverhill Dr 9800-9899 Replace broken sidewalk 1/19/2026 Wehunt David Haverhill Dr 9800-9899 Replace broken sidewalk 1/19/2026 ISAIS CARDONA Haverhill Dr 9800-9899 Replace broken sidewalk 1/19/2026 Villa Joel Haverhill Dr 9800-9899 Replace broken sidewalk 1/19/2026 Anderson Chase Haverhill Dr 9800-9899 Replace broken sidewalk 1/19/2026 Gunn Shane Haverhill Dr 9800-9899 Replace broken sidewalk 1/19/2026 Salazar Armando Haverhill Dr 9800-9899 Replace broken sidewalk 1/15/2026 Brown Justin Dennis Ave 200-373 Move items 1/15/2026 Wehunt David Dennis Ave 200-373 Move items 1/15/2026 Anderson Chase Dennis Ave 200-373 Move items 1/15/2026 Williams Jason Dennis Ave 200-373 Move items 1/15/2026 Villa Joel Dennis Ave 200-373 Move items 1/15/2026 ISAIS CARDONA Dennis Ave 200-373 Move items 1/15/2026 ISAIS CARDONA Dennis Ave 200-373 Customer tree / limb request 1/15/2026 Anderson Chase Dennis Ave 200-373 Customer tree / limb request 1/15/2026 Wehunt David Dennis Ave 200-373 Customer tree / limb request 1/15/2026 Salazar Armando Dennis Ave 200-373 Customer tree / limb request 1/15/2026 Williams Jason Dennis Ave 200-373 Customer tree / limb request 1/15/2026 Gunn Shane Dennis Ave 200-373 Customer tree / limb request 1/15/2026 Salazar Armando Wilson Rd 0-1205 Remove dead tree / limb 1/15/2026 Salazar Armando Townsen Blvd E 20142-20199 Trash / debris removal 1/15/2026 Gunn Shane Townsen Blvd E 20142-20199 Trash / debris removal 1/15/2026 Salazar Armando Spring Creek Xing 20800-20899 Trash / debris removal 1/15/2026 Gunn Shane Spring Creek Xing 20800-20899 Trash / debris removal 1/15/2026 Allen Vince 138 WILSON RD Remove tree/ limbs from ROW 1/15/2026 Villa Joel 138 WILSON RD Remove tree/ limbs from ROW 1/15/2026 Salazar Armando Manning Rd 900-1021 Saw cut pavement 1/15/2026 Gunn Shane Manning Rd 900-1021 Saw cut pavement 1/15/2026 Gunn Shane N Houston Ave 2000-2099 Trash / debris removal 1/15/2026 Salazar Armando N Houston Ave 2000-2099 Trash / debris removal 1/14/2026 ISAIS CARDONA Salzburg Ln 20100-20199 Replace concrete / asphalt driveway due to utility repair 1/14/2026 Gunn Shane Salzburg Ln 20100-20199 Replace concrete / asphalt driveway due to utility repair 1/14/2026 Williams Jason Salzburg Ln 20100-20199 Replace concrete / asphalt driveway due to utility repair 1/14/2026 Anderson Chase Salzburg Ln 20100-20199 Replace concrete / asphalt driveway due to utility repair 1/14/2026 Wehunt David Salzburg Ln 20100-20199 Replace concrete / asphalt driveway due to utility repair 1/14/2026 Villa Joel Salzburg Ln 20100-20199 Replace concrete / asphalt driveway due to utility repair 1/14/2026 Brown Justin 20144 EASTWAY VILLAGE DR Trash / debris removal 1/14/2026 Allen Vince 20144 EASTWAY VILLAGE DR Trash / debris removal 1/14/2026 Villa Joel 20144 EASTWAY VILLAGE DR Trash / debris removal 1/14/2026 Salazar Armando Salzburg Ln 20100-20199 Replace concrete / asphalt driveway due to utility repair 1/14/2026 Brown Justin Salzburg Ln 20100-20199 Replace concrete / asphalt driveway due to utility repair 1/13/2026 Williams Jason Salzburg Ln 20100-20199 Replace concrete / asphalt driveway due to utility repair 1/13/2026 Gunn Shane Salzburg Ln 20100-20199 Replace concrete / asphalt driveway due to utility repair 1/13/2026 Wehunt David Salzburg Ln 20100-20199 Replace concrete / asphalt driveway due to utility repair 1/13/2026 Anderson Chase Salzburg Ln 20100-20199 Replace concrete / asphalt driveway due to utility repair 1/13/2026 Brown Justin Salzburg Ln 20100-20199 Replace concrete / asphalt driveway due to utility repair 1/13/2026 ISAIS CARDONA Salzburg Ln 20100-20199 Replace concrete / asphalt driveway due to utility repair 1/13/2026 Villa Joel Salzburg Ln 20100-20199 Replace concrete / asphalt driveway due to utility repair 1/13/2026 Salazar Armando Salzburg Ln 20100-20199 Replace concrete / asphalt driveway due to utility repair 1/12/2026 Allen Vince City Wide Clean drain inlet 1/12/2026 Villa Joel 310 FISHER RD Remove / cover graffiti 1/12/2026 Brown Justin 310 FISHER RD Remove / cover graffiti 1/12/2026 Allen Vince 310 FISHER RD Remove / cover graffiti 1/12/2026 Allen Vince 17114 MEMPHIS ST Dead animal pickup 1/12/2026 Allen Vince 2504-A S HOUSTON AVE Repair traffic signal 1/12/2026 Brown Justin 2504-A S HOUSTON AVE Repair traffic signal 1/12/2026 Villa Joel 2504-AS HOUSTON AVE Repairtraffic signal 1/12/2026 Villa Joel City Wide Clean drain inlet 1/12/2026 Gunn Shane City Wide Clean drain inlet 1/12/2026 Brown Justin City Wide Clean drain inlet 1/12/2026 Anderson Chase City Wide Clean drain inlet 1/12/2026 Salazar Armando City Wide Clean drain inlet 1/12/2026 Isaias Cardona City Wide Clean drain inlet 1/9/2026 Villa Joel 9470 FM 1960 BYP Trash / debris removal 1/9/2026 ISAIS CARDONA 9470 FM 1960 BYP Trash / debris removal 1/9/2026 Allen Vince 9470 FM 1960 BYP Trash / debris removal 1/9/2026 Anderson Chase Cambridge Village Dr 500-599 Replace concrete / asphalt driveway due to utility repair 1/9/2026 Brown Justin Cambridge Village Dr 500-599 Replace concrete / asphalt driveway due to utility repair 1/9/2026 Salazar Armando Cambridge Village Dr 500-599 Replace concrete / asphalt driveway due to utility repair 1/9/2026 Villa Joel Cambridge Village Dr 500-599 Replace concrete / asphalt driveway due to utility repair 1/9/2026 Gunn Shane Cambridge Village Dr 500-599 Replace concrete / asphalt driveway due to utility repair 1/8/2026 Gunn Shane Birchridge Dr 10200-10231 Trash / debris removal 1/8/2026 Salazar Armando Birchridge Dr 10200-10231 Trash / debris removal 1/8/2026 ISAIS CARDONA FM 1960 Bypass Lift Station Move items 1/8/2026 Williams Jason FM 1960 Bypass Lift Station Move items 1/8/2026 Wehunt David FM 1960 Bypass Lift Station Move items 1/8/2026 Salazar Armando Townsen Blvd E 20100-20139 Dead animal pickup 1/8/2026 Gunn Shane Townsen Blvd E 20100-20139 Dead animal pickup 1/7/2026 Brown Justin Prince Edward Ct 20400-20599 Replace concrete / asphalt driveway due to utility repair 1/7/2026 Gunn Shane Prince Edward Ct 20400-20599 Replace concrete / asphalt driveway due to utility repair 1/7/2026 Anderson Chase Prince Edward Ct 20400-20599 Replace concrete / asphalt driveway due to utility repair 1/7/2026 Villa Joel Prince Edward Ct 20400-20599 Replace concrete / asphalt driveway due to utility repair 1/7/2026 Salazar Armando Prince Edward Ct 20400-20599 Replace concrete / asphalt driveway due to utility repair 1/6/2026 Wehunt David Prince Edward Ct 20400-20599 Replace concrete / asphalt driveway due to utility repair 1/6/2026 Gunn Shane Prince Edward Ct 20400-20599 Replace concrete / asphalt driveway due to utility repair 1/6/2026 Salazar Armando Prince Edward Ct 20400-20599 Replace concrete / asphalt driveway due to utility repair 1/6/2026 Anderson Chase Prince Edward Ct 20400-20599 Replace concrete / asphalt driveway due to utility repair 1/6/2026 Villa Joel Prince Edward Ct 20400-20599 Replace concrete / asphalt driveway due to utility repair 1/6/2026 ISAIS CARDONA Prince Edward Ct 20400-20599 Replace concrete / asphalt driveway due to utility repair 1/6/2026 Brown Justin Prince Edward Ct 20400-20599 Replace concrete / asphalt driveway due to utility repair 1/6/2026 Williams Jason Salzburg Ln 20100-20199 Replace concrete / asphalt driveway due to utility repair 1/6/2026 Gunn Shane Salzburg Ln 20100-20199 Replace concrete / asphalt driveway due to utility repair 1/6/2026 Wehunt David Salzburg Ln 20100-20199 Replace concrete / asphalt driveway due to utility repair 1/6/2026 Anderson Chase Salzburg Ln 20100-20199 Replace concrete / asphalt driveway due to utility repair 1/6/2026 Salazar Armando Salzburg Ln 20100-20199 Replace concrete / asphalt driveway due to utility repair 1/6/2026 Brown Justin Salzburg Ln 20100-20199 Replace concrete / asphalt driveway due to utility repair 1/6/2026 ISAIS CARDONA Salzburg Ln 20100-20199 Replace concrete / asphalt driveway due to utility repair 1/6/2026 Villa Joel Salzburg Ln 20100-20199 Replace concrete / asphalt driveway due to utility repair 1/5/2026 Salazar Armando Townsen Blvd W 21801-21898 Trash / debris removal 1/5/2026 Gunn Shane Townsen Blvd W 21801-21898 Trash / debris removal VEHICLE MAINTENANCE JANUARY 2026 MONTHLY REPORT City of Humble Reporting Dates 01 /01 /2026 01 /31 /2026 Fleet Maintenance Work Order Equipment Summary Grouped By Equipment/Vehicle Code WO # Date Equipment Code / Name Odometer Out Side Labor Parts Labor In House Parts Total Cost 2428 01/01/26 332 2019 Dodqe Ram Ambulance #332 56,250 M $0.00 $0.00 $21.51 $40.00 $61.51 2429 01/01/26 336 2014 Ferrara Pumper MVP #336 54,001 M $0.00 $0.00 $21.51 $40.00 $61.51 2430 01/06/26 343 2019 Chevy Tahoe #343 33,555 M $0.00 $0.00 $21.51 $18.50 $40.01 2431 01/05/26 345 2021 Pierce Velocity Ladder #345 0 $0.00 $0.00 $21.51 $40.00 $61.51 2432 01/07/26 460 2016 Chevy Tahoe #460 123,300 M $0.00 $0.00 $21.51 $18.50 $40.01 2433 01/02/26 263 2022 International Sweeper 23,688 H $0.00 $0.00 $29.98 $0.00 $29.98 2434 01/05/26 401 2020 Chevy Tahoe #401 75,096 M $0.00 $0.00 $44.97 $0.00 $44.97 2436 01/05/26 482 2018 Chevy Tahoe #482 46,909 M $0.00 $0.00 $64.52 $45.74 $110.26 2437 01/05/26 400 2020 Chevy Tahoe #400 55,023 M $0.00 $0.00 $14.99 $219.99 $234.98 2438 01/05/26 928 2017 Chevy Silverado #928 112,477 M $0.00 $0.00 $7.50 $4.59 $12.09 2439 01/06/26 222 Dennis St Backhoe #222 4,733 H $0.00 $0.00 $59.96 $5.78 $65.74 2440 01/06/26 408 2020 Chevy Tahoe #408 105,605 M $0.00 $0.00 $59.96 $57.69 $117.65 2441 01/05/26 460 2016 Chevy Tahoe #460 123,237 M $0.00 $0.00 $59.96 $71.50 $131.46 2442 01/07/26 402 2020 Chevy Tahoe #402 105,034 M $0.00 $0.00 $21.51 $18.50 $40.01 2443 01/07/26 1524 2008 Chevy Silverado #1524 74,404 M $0.00 $0.00 $21.51 $18.50 $40.01 2444 01/07/26 400 2020 Chevy Tahoe #400 55,149 M $0.00 $0.00 $21.51 $18.50 $40.01 2445 01/06/26 486 2018 Chevy Tahoe #486 102,246 M $0.00 $0.00 $59.96 $71.50 $131.46 2446 01/06/26 490 Police Department unit# 490 3,019 M $0.00 $0.00 $43.02 $0.00 $43.02 2447 01/06/26 474 2017 Chevy Tahoe #474 127,290 M $0.00 $0.00 $59.96 $259.67 $319.63 2448 01/07/26 2056 2016 Chevy Silverado #2056 87,097 M $0.00 $0.00 $44.97 $151.10 $196.07 2449 01/07/26 3031 2002 S & S Army Truck #3031 10,644 M $0.00 $0.00 $21.51 $40.00 $61.51 2450 01/01/26 420 2022 Chevy Tahoe #420 20,981 M $0.00 $0.00 $21.51 $385.00 $406.51 2451 01/08/26 406 2020 Chevy Tahoe #406 45,433 M $0.00 $0.00 $21.51 $18.50 $40.01 2452 01/07/26 336 2014 Ferrara Pumper MVP #336 74,398 M $0.00 $0.00 $43.01 $0.00 $43.01 2453 01/07/26 416 2021 Chevy Tahoe #416 36,718 M $0.00 $0.00 $14.99 $9.18 $24.17 2454 01/07/26 467 2016 Chevy Tahoe #467 180,733 M $0.00 $0.00 $59.96 $60.55 $120.51 2455 01/07/26 463 2016 Chevy Tahoe #463 60,804 M $0.00 $0.00 $59.96 $60.55 $120.51 2456 01/08/26 461 Police Dept Patrol Unit #461 8,149 M $0.00 $0.00 $21.51 $0.00 $21.51 2457 01/07/26 473 2017 Chevy Tahoe #473 99,650 M $0.00 $0.00 $179.88 $829.32 $1,009.20 2458 01/08/26 485 2018 Chevy Tahoe #485 88,514 M $0.00 $0.00 $43.01 $0.00 $43.01 2459 01/08/26 342 2016 Ford Expedition #342 129,272 M $0.00 $0.00 $74.95 $252.93 $327.88 2460 01/08/26 401 2020 Chevy Tahoe #401 75,180 M $0.00 $0.00 $21.51 $18.50 $40.01 2461 01/09/26 263 2022 International Sweeper 23,822 H $0.00 $0.00 $104.93 $264.42 $369.35 2462 01/09/26 491 Police Department unit# 491 77 M $0.00 $0.00 $21.51 $7,671.35 $7,692.86 2463 01/09/26 1523 2019 Ford Transil Bus #1523 69,671 M $0.00 $0.00 $21.51 $27.36 $48.87 February 4, 2026 City of Humble Fleet Maintenance Work Order Equipment Summary Grouped By Equipment/Vehicle Code WO # Date Equipment Code / Name Odometer 2464 01/09/26 486 2018 Chevy Tahoe #486 102,277 M 2465 01/09/26 484 2018 Chvey Tahoe #484 98,547 M 2466 01/09/26 421 2022 Chevy Tahoe #421 26,723 M 2467 01/12/26 421 2022 Chevy Tahoe #421 26,725 M 2468 01/13/26 402 2020 Chevy Tahoe #402 105,036 M 2469 01/13/26 402 2020 Chevy Tahoe #402 105,036 M 2470 01/13/26 408 2020 Chevy Tahoe #408 106,307 M 2471 01/14/26 496 Police Department unit# 496 7,518 M 2472 01/14/26 1104 2016 Chevy Silverado #1104 4,707 M 2473 01/14/26 408 2020 Chevy Tahoe #408 106,343 M 2474 01/14/26 436 2013 Chevy Tahoe #436 110,670 M 2475 01/14/26 1237 EMS Dept Unit# 1237 26,628 M 2476 01/14/26 420 2022 Chevy Tahoe #420 24,877 M 2477 01/15/26 443 2024 Chevy Tahoe Unit #443 23,534 M 2478 01/15/26 458 Police Dept Partol Unit# 458 2,600 M 2479 01/16/26 263 2022 International Sweeper 26,991 H 2480 01/16/26 425 K-9 Unit #425 Police Department 120 M 2481 01/16/26 404 Police Dept Traffic Unit # 404 65 M 2482 01/15/26 420 2022 Chevy Tahoe #420 24,880 M 2483 01/16/26 458 Police Dept Partol Unit# 458 2,647 M 2484 01/15/26 430 2023 Chevy Tahoe #430 39,978 M 2485 01/16/26 1231 2021 Chevy Tahoe #1231 43,969 M 2486 01/15/26 616 2013 Chevy Silverado #616 135,089 M 2487 01/15/26 1514 2012 Ford E-250 #1514 155,449 M 2488 01/16/26 266 2023 GMC 1500 #266 33,109 M 2489 01/16/26 485 2018 Chevy Tahoe #485 88,674 M 2490 01/16/26 275 2024 GMC 2500 Double Cab 7,654 M 2491 01/15/26 435 2023 Chevy Tahoe #435 22,579 M 2492 01/15/26 932 2024 GMC Sierra 15,420 M 2493 01/23/26 476 Police Dept Detective Unit# 476 8,812 M 2494 01/19/26 472 Police Department unit# 472 4,218 M 2495 01/19/26 432 2023 Chevy Tahoe #432 51,463 M 2496 01/23/26 475 Police Dept Detective Unit# 475 10,474 M 2497 01/23/26 477 Police Dept Detective Unit# 477 4,143 M 2498 01/19/26 2060 2022 Ford F-550 #2060 16,513 M Reporting Dates 01 /01 /2026 01 /31 /2026 Out Side Labor Parts In House Labor Parts Total Cost $0.00 $0.00 $43.01 $49.96 $92.97 $0.00 $0.00 $59.96 $60.55 $120.51 $0.00 $0.00 $43.01 $0.00 $43.01 $0.00 $0.00 $29.98 $0.00 $29.98 $0.00 $0.00 $164.89 $33.25 $198.14 $0.00 $0.00 $44.97 $309.80 $354.77 $0.00 $0.00 $21.51 $23.98 $45.49 $0.00 $0.00 $29.98 $37.11 $67.09 $0.00 $0.00 $59.96 $275.10 $335.06 $0.00 $0.00 $104.93 $272.78 $377.71 $0.00 $0.00 $44.97 $167.25 $212.22 $0.00 $0.00 $29.98 $0.00 $29.98 $0.00 $0.00 $21.51 $0.00 $21.51 $0.00 $0.00 $21.51 $33.25 $54.76 $0.00 $0.00 $14.99 $33.25 $48.24 $0.00 $0.00 $14.99 $15.99 $30.98 $0.00 $0.00 $43.01 $45.00 $88.01 $0.00 $0.00 $43.01 $45.00 $88.01 $0.00 $0.00 $172.04 $0.00 $172.04 $0.00 $0.00 $29.98 $0.00 $29.98 $0.00 $0.00 $21.51 $18.50 $40.01 $0.00 $0.00 $21.51 $18.50 $40.01 $0.00 $0.00 $21.51 $18.50 $40.01 $0.00 $0.00 $14.99 $18.50 $33.49 $0.00 $0.00 $21.51 $18.50 $40.01 $0.00 $0.00 $43.02 $27.84 $70.86 $0.00 $0.00 $21.51 $18.50 $40.01 $0.00 $0.00 $29.98 $0.00 $29.98 $0.00 $0.00 $29.98 $33.25 $63.23 $0.00 $0.00 $21.51 $18.50 $40.01 $0.00 $0.00 $21.51 $18.00 $39.51 $0.00 $0.00 $21.51 $18.50 $40.01 $0.00 $0.00 $21.51 $18.50 $40.01 $0.00 $0.00 $21.51 $18.50 $40.01 $0.00 $0.00 $21.51 $18.50 $40.01 February 4, 2026 2 City of Humble Reporting Dates 01 /01 /2026 01 /31 /2026 Fleet Maintenance Work Order Equipment Summary Grouped By Equipment/Vehicle Code WO # Date Equipment Code / Name Odometer Out Side Labor Parts Labor In House Parts Total Cost 2499 01/20/26 431 2023 Chevy Tahoe #431 61,730 M $0.00 $0.00 $21.51 $18.50 $40.01 2500 01/19/26 412 Police Dept. unit#412 5,661 M $0.00 $0.00 $21.51 $18.50 $40.01 2501 01/20/26 328 2013 Chevy Ambulance #328 68,994 M $0.00 $0.00 $21.51 $18.50 $40.01 2502 01/20/26 642 2023 Chevy Silverado #642 38,656 M $0.00 $0.00 $21.51 $18.50 $40.01 2503 01/20/26 431 2023 Chevy Tahoe #431 61,731 M $0.00 $0.00 $36.50 $33.25 $69.75 2SO4 01/20/26 414 2021 Chevy Tahoe # 414 87,226 M $0.00 $0.00 $21.51 $33.25 $54.76 2505 01/20/26 2057 2019 Chevy Silverado #2057 36,625 M $0.00 $0.00 $74.95 $289.84 $364.79 2506 01/20/26 642 2023 Chevy Silverado #642 38,660 M $0.00 $0.00 $36.50 $33.25 $69.75 2507 01/08/26 263 2022 International Sweeper 26,992 H $0.00 $0.00 $21.51 $147.00 $168.51 2508 01/08/26 400 2020 Chevy Tahoe #400 55,150 M $0.00 $0.00 $21.51 $385.00 $406.51 2509 01/08/26 453 2015 Chevy Tahoe #453 109,890 M $0.00 $0.00 $21.51 $500.00 $521.51 2510 01/02/26 482 2018 Chevy Tahoe #482 46,906 M $0.00 $0.00 $21.51 $597.00 $618.51 2511 01/02/26 482 2018 Chevy Tahoe #482 46,906 M $0.00 $0.00 $21.51 $0.00 $21.51 2512 01/02/26 3040 Water Dept Unit # 3040 3,238 M $0.00 $0.00 $21.51 $2,982.88 $3,004.39 2513 01/21/26 3030 2019 Chevy Silverado #3030 33,468 M $0.00 $0.00 $14.99 $23.98 $38.97 2514 01/05/26 451 Police Department unit# 451 3,977 M $0.00 $0.00 $29.98 $0.00 $29.98 2515 01/21/26 275 2024 GMC 2500 Double Cab 7,757 M $0.00 $0.00 $14.99 $23.98 $38.97 2516 01/21/26 328 2013 Chevy Ambulance #328 1 M $0.00 $0.00 $74.95 $98.99 $173.94 2517 01/22/26 1303 2018 Chevy #1303 47,083 M $0.00 $0.00 $14.99 $3.86 $18.85 2518 01/22/26 421 2022 Chevy Tahoe #421 27,026 M $0.00 $0.00 $29.98 $39.18 $69.16 2519 01/22/26 452 Police Department unit# 452 3,071 M $0.00 $0.00 $21.51 $33.25 $54.76 2520 01/21/26 253 2002 Chevy #253 93,242 M $0.00 $0.00 $59.96 $328.98 $388.94 2521 01/23/26 484 2018 Chvey Tahoe #484 99,071 M $0.00 $0.00 $21.51 $17.42 $38.93 2522 01/23/26 482 2018 Chevy Tahoe #482 46,974 M $0.00 $0.00 $43.01 $140.14 $183.15 2523 01/19/26 400 2020 Chevy Tahoe #400 55,342 M $0.00 $0.00 $129.03 $0.00 $129.03 2524 01/19/26 408 2020 Chevy Tahoe #408 106,548 M $0.00 $0.00 $14.99 $17.42 $32.41 2525 01/19/26 472 Police Department unit# 472 4,218 M $0.00 $0.00 $14.99 $24.66 $39.65 2526 01/19/26 441 2024 Chevrolet Tahoe 12,310 M $0.00 $0.00 $14.99 $33.25 $48.24 2527 01/23/26 424 2022 Chevy Tahoe #424 28,789 M $0.00 $0.00 $44.97 $619.05 $664.02 2528 01/22/26 3033 2022 Chevy Silverado #3033 28,829 M $0.00 $0.00 $59.96 $433.25 $493.21 2529 01/23/26 928 2017 Chevy Silverado #928 113,429 M $0.00 $0.00 $14.99 $3.86 $18.85 2530 01/23/26 247 2005 Kubota #247 3,895 H $0.00 $0.00 $14.99 $14.99 $29.98 2531 01/22/26 414 2021 Chevy Tahoe # 414 87,233 M $0.00 $0.00 $21.51 $0.00 $21.51 2532 01/22/26 414 2021 Chevy Tahoe # 414 87,233 M $0.00 $0.00 $21.51 $0.00 $21.51 2533 01/23/26 2063 2025 GMC Sierra 1500 31085 M $0.00 $0.00 $21.51 $0.00 $21.51 February 4, 2026 3 City of Humble Reporting Dotes 01 /01 /2026 01 /31 /2026 Fleet Maintenance Work Order Equipment Summary Grouped By Equipment/Vehicle Code WO # Date Equipment Code / Name Odometer Out Side Labor Parts In House Labor Parts Total Cost 2534 01/23/26 438 2023 Chevy Tahoe #438 17,034 M $0.00 $0.00 $21.51 $0.00 $21.51 2535 01/23/26 464 2016 Chevy Tahoe #464 126,638 M $0.00 $0.00 $14.99 $12.48 $27.47 2536 01/29/26 421 2022 Chevy Tahoe #421 27,027 M $0.00 $0.00 $86.02 $155.65 $241.67 2537 01/30/26 409 2020 Chevy Tahoe #409 82,723 M $0.00 $0.00 $516.12 $2,205.27 $2,721.39 2538 01/26/26 3033 2022 Chevy Silverado #3033 28,976 M $0.00 $0.00 $21.51 $79.99 $101.50 2539 01/22/26 3033 2022 Chevy Silverado #3033 28,829 M $0.00 $0.00 $14.99 $50.73 $65.72 2540 01/06/26 486 2018 Chevy Tahoe #486 102,246 M $0.00 $0.00 $29.98 $149.83 $179.81 2541 01/08/26 401 2020 Chevy Tahoe #401 75,180 M $0.00 $0.00 $86.02 $74.73 $160.75 2S42 01/27/26 2061 2023 GMC 2500 #2061 16,246 M $0.00 $0.00 $21.51 $18.50 $40.01 2543 01/27/26 2059 2020 Ford F-550 #2059 30,497 M $0.00 $0.00 $21.51 $18.50 $40.01 2544 01/30/26 1523 2019 Ford Transil Bus #1523 70,534 M $0.00 $0.00 $21.51 $18.50 $40.01 2545 01/30/26 1523 2019 Ford Transil Bus #1523 70,534 M $0.00 $0.00 $29.98 $151.49 $181.47 2546 01/29/26 1308 2015 Chevy Silverado #248 85,082 M $0.00 $0.00 $14.99 $17.42 $32.41 2547 01/28/26 481 2018 Chevy Tahoe #481 66,640 M $0.00 $0.00 $21.51 $7.00 $28.51 2S48 01/27/26 439 2023 Chevy Tahoe #439 17,364 M $0.00 $0.00 $29.98 $0.00 $29.98 2549 01/28/26 436 2013 Chevy Tahoe #436 110,986 M $0.00 $0.00 $21.51 $18.50 $40.01 2550 01/26/26 406 2020 Chevy Tahoe #406 46,148 M $0.00 $0.00 $29.98 $253.44 $283.42 2551 01/27/26 343 2019 Chevy Tahoe #343 33,745 M $0.00 $0.00 $107.53 $223.83 $331.36 2552 01/27/26 263 2022 International Sweeper 26,992 H $0.00 $0.00 $89.94 $137.70 $227.64 2553 01/29/26 230 2003 Case 580 Super M #230 4,544 H $0.00 $0.00 $14.99 $3.86 $18.85 2554 01/22/26 482 2018 Chevy Tahoe #482 46,94S M $0.00 $0.00 $21.51 $1,900.47 $1,921.98 2555 01/21/26 263 2022 International Sweeper 26,993 H $0.00 $0.00 $21.51 $147.00 $168.51 2556 01/27/26 929 2022 Chevy Silverado #929 43,776 M $0.00 $0.00 $119.92 $314.74 $434.66 128 82 $0.00 $0.00 $5,308.75 $25,313.94 $30,622.69 128 Units Listed: 82 $0.00 $0.00 $5,308.75 $25,313.94 $30,622.69 Labor Parts Total Cost / Unit: 82 $64.74 $308.71 $373.45 Cost / WO: 128 $41.47 $197.77 $239.24 February 4, 2026 4